FOR CONTINUATION SEE BELOW JOIN LINE€¦ · \尀屜inpun1s01\尀椀渀瀀甀渀猀...
Transcript of FOR CONTINUATION SEE BELOW JOIN LINE€¦ · \尀屜inpun1s01\尀椀渀瀀甀渀猀...
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100 3200
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500 3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700 4800
4900 4980
A1
(A1)
AUCKLAND TRANSPORTOVERAL LAYOUT PLANTAUPAKI ROAD
NOT FOR CONSTRUCTION
FOR CONSULTATION
20/04/2018
1718443_01_006_G020
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
B
E
L
O
W
JO
IN
L
IN
E
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
A
B
O
V
E
J
O
IN
L
IN
E
WAITAKERE ROAD
NELSON ROAD
WAITAKERE ROAD
CH:00.00m
TAUPAKI ROAD
AMREINS ROAD
BROOKVALE LINK
NIXON ROAD
JOSEPH ROAD
STATE HIGHWAY 16
OLD N ROAD
CH:4979.67m
TAUPAKI ROAD
TAUPAKI ROAD
R109mR44m
R149m
R114m
R337m
R255m
R217m
R336m
R184m
R251m
R122m
R322m R521m
R117m
R696mSITE DRAWING NUMBER RADIUS & CATEGORY OPERATING SPEED
1 1718443_01_006_G025 R149 = CATEGORY 3 80 KM/H
2 1718443_01_006_G026 R184 = CATEGORY 3 80 KM/H
3 1718443_01_006_G027 R122 = CATEGORY 3 80 KM/H
LEGEND
TREATMENT ROUTE
NOTE
SITE-1
SITE-2
SITE-3
1. CHAINAGE:00.00 NORTHBOUND BEGINS AT INTERSECTIONOF TAUPAKI ROAD AND WAITAKERE ROAD AND ENDS ATINTERSECTION OF TAUPAKI ROAD AND STATE HIGHWAY 16.
TAUPAKI ROAD
ROUTE CLASSIFICATIONARTERIAL (SECONDARY BETWEEN
NELSON ROAD & WAITAKERE ROAD)
AADT3063 BETWEEN AMRIENS ROADAND WAITAKERE ROAD. 4031BETWEEN NIXON ROAD AND SH16
LENGTH 5011m
ROUTE OPERATING SPEED 70 KM/H
EDGE LINES ON SITE YES
EDGE MAKER POSTS ON SITE VARIES
63
61
52
320
80
4543
41 61
52
A1
(A1)
AUCKLAND TRANSPORTRURAL DELINEATION PLANTAUPAKI ROAD
NOT FOR CONSTRUCTION
FOR CONSULTATION
20/04/2018
1718443_01_006_G025
T
A
U
P
A
K
I R
O
A
D
R149 = CATEGORY 3CH:734.74mOP SPEED=80KM/H
R149 = CATEGORY 3CH:840.10mOP SPEED=80KM/H
R149m
TAUPAKI ROAD
SIGN TO BE RELOCATED / REMOVED
ROADMARKING / KERBLINE TO BE REMOVED
EXISTING SIGN TO REMAIN
LEGEND
EXISTING KERBLINE / ROAD MARKING TO REMAIN
NEW / RELOCATED SIGN
NEW ROAD MARKING
PROPERTY BOUNDARY/ FENCE LINEBEGINNING OF CURVE LINE
GENERAL NOTES1. ALL SIGNS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART1. TRAFFIC SIGNS AND TRAFFIC CONTROL DEVICES MANUAL.2. THE PROPOSED SIGNS SHOWN ON THE DRAWING ARE INDICATIVE ONLY. ACTUAL LOCATIONS TO BE CONFIRMED WITH SITE ENGINEER.3. ALL EDGE MARKER POSTS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART 2 SECTION 5.05.4. WHERE DRIVEWAYS, ACCESSES OR SIDE ROAD LOCATIONS COINCIDES WITH EDGE MARKER POST PLACEMENT, INSTALL EDGE MARKER
POST ON EITHER SIDE OF THESE DRIVEWAYS, ACCESSES AND SIDE ROADS.5. BI-DIRECTIONAL RRPMs TO BE INSTALLED ON CENTRELINE @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.6. RED MONO-DIRECTIONAL RRPMs TO BE INSTALLED @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.06.7. RED MONO-DIRECTIONAL RRPMs TO COMMENCE AND TERMINATE AT TANGENT OF CURVE.8. ALL CENTRELINES AND EDGE LINES ARE TO BE INSTALLED AS PER MOTSAM PART 2: SECTION 2.01 @ 2.03.9. ALL DIMENSIONS SHOWN ARE METRES UNLESS STATED OTHERWISE.
FO
R C
ON
TIN
UA
TIO
N S
EE
B
ELO
W
JO
IN
LIN
E
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
S
E
E
A
B
O
V
E
J
O
I
N
L
I
N
E
NEW "PW-66" HORIZONTALCURVE CHEVRON SIGHT BOARD
RELOCATE EXISTING "PW-17"ADVANCE CURVE WARNING SIGN
NOTE1. CHAINAGE:00.00 NORTHBOUND BEGINS AT INTERSECTION
OF TAUPAKI ROAD AND WAITAKERE ROAD AND ENDS ATINTERSECTION OF TAUPAKI ROAD AND STATE HIGHWAY 16.
192
200
189
180
177
A1
(A1)
AUCKLAND TRANSPORTRURAL DELINEATION PLANTAUPAKI ROAD
NOT FOR CONSTRUCTION
FOR CONSULTATION
20/04/2018
1718443_01_006_G026
T
A
U
P
A
K
I R
O
A
D
R184 = CATEGORY 3
CH:2108.74m
OP SPEED=80KM/H
R184 = CATEGORY 3CH:2217.32mOP SPEED=80KM/H
R184m
T
A
U
P
A
K
I R
O
A
D
SIGN TO BE RELOCATED / REMOVED
ROADMARKING / KERBLINE TO BE REMOVED
EXISTING SIGN TO REMAIN
LEGEND
EXISTING KERBLINE / ROAD MARKING TO REMAIN
NEW / RELOCATED SIGN
NEW ROAD MARKING
PROPERTY BOUNDARY/ FENCE LINEBEGINNING OF CURVE LINE
GENERAL NOTES1. ALL SIGNS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART1. TRAFFIC SIGNS AND TRAFFIC CONTROL DEVICES MANUAL.2. THE PROPOSED SIGNS SHOWN ON THE DRAWING ARE INDICATIVE ONLY. ACTUAL LOCATIONS TO BE CONFIRMED WITH SITE ENGINEER.3. ALL EDGE MARKER POSTS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART 2 SECTION 5.05.4. WHERE DRIVEWAYS, ACCESSES OR SIDE ROAD LOCATIONS COINCIDES WITH EDGE MARKER POST PLACEMENT, INSTALL EDGE MARKER
POST ON EITHER SIDE OF THESE DRIVEWAYS, ACCESSES AND SIDE ROADS.5. BI-DIRECTIONAL RRPMs TO BE INSTALLED ON CENTRELINE @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.6. RED MONO-DIRECTIONAL RRPMs TO BE INSTALLED @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.06.7. RED MONO-DIRECTIONAL RRPMs TO COMMENCE AND TERMINATE AT TANGENT OF CURVE.8. ALL CENTRELINES AND EDGE LINES ARE TO BE INSTALLED AS PER MOTSAM PART 2: SECTION 2.01 @ 2.03.9. ALL DIMENSIONS SHOWN ARE METRES UNLESS STATED OTHERWISE.
NEW "PW-67" CHEVRONCURVE INDICATOR
NEW "PW-67" CHEVRONCURVE INDICATOR
EXISTING CHEVRON CURVE INDICATOR
NOTE1. CHAINAGE:00.00 NORTHBOUND BEGINS AT INTERSECTION
OF TAUPAKI ROAD AND WAITAKERE ROAD AND ENDS ATINTERSECTION OF TAUPAKI ROAD AND STATE HIGHWAY 16.
NEW "PW-67" CHEVRONCURVE INDICATOR
337
338
324
A1
(A1)
AUCKLAND TRANSPORTRURAL DELINEATION PLANTAUPAKI ROAD
NOT FOR CONSTRUCTION
FOR CONSULTATION
20/04/2018
1718443_01_006_G027
T
A
U
P
A
K
I
R
O
A
D
R121 = CATEGORY 3
CH:3523.66mOP SPEED=80KM/H R121 = CATEGORY 3
CH:3618.33m
OP SPEED=80KM/H
R121m
T
A
U
P
A
K
I
R
O
A
D
SIGN TO BE RELOCATED / REMOVED
ROADMARKING / KERBLINE TO BE REMOVED
EXISTING SIGN TO REMAIN
LEGEND
EXISTING KERBLINE / ROAD MARKING TO REMAIN
NEW / RELOCATED SIGN
NEW ROAD MARKING
PROPERTY BOUNDARY/ FENCE LINEBEGINNING OF CURVE LINE
GENERAL NOTES1. ALL SIGNS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART1. TRAFFIC SIGNS AND TRAFFIC CONTROL DEVICES MANUAL.2. THE PROPOSED SIGNS SHOWN ON THE DRAWING ARE INDICATIVE ONLY. ACTUAL LOCATIONS TO BE CONFIRMED WITH SITE ENGINEER.3. ALL EDGE MARKER POSTS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART 2 SECTION 5.05.4. WHERE DRIVEWAYS, ACCESSES OR SIDE ROAD LOCATIONS COINCIDES WITH EDGE MARKER POST PLACEMENT, INSTALL EDGE MARKER
POST ON EITHER SIDE OF THESE DRIVEWAYS, ACCESSES AND SIDE ROADS.5. BI-DIRECTIONAL RRPMs TO BE INSTALLED ON CENTRELINE @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.6. RED MONO-DIRECTIONAL RRPMs TO BE INSTALLED @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.06.7. RED MONO-DIRECTIONAL RRPMs TO COMMENCE AND TERMINATE AT TANGENT OF CURVE.8. ALL CENTRELINES AND EDGE LINES ARE TO BE INSTALLED AS PER MOTSAM PART 2: SECTION 2.01 @ 2.03.9. ALL DIMENSIONS SHOWN ARE METRES UNLESS STATED OTHERWISE.
EXISTING CHEVRON INDICATOR
N
I
X
O
N
R
O
A
D
NEW "PW-66" HORIZONTALCURVE CHEVRON SIGHT BOARD
NOTE1. CHAINAGE:00.00 NORTHBOUND BEGINS AT INTERSECTION
OF TAUPAKI ROAD AND WAITAKERE ROAD AND ENDS ATINTERSECTION OF TAUPAKI ROAD AND STATE HIGHWAY 16.
NEW "PW-66" HORIZONTALCURVE CHEVRON SIGHT BOARD
REMOVE EXISTING "PW-66"
NEW TRAFFIC ISLAND TOREPLACE EXISTING TRAFFICISLAND
A1
(A1)
AUCKLAND TRANSPORTRURAL DELINEATION PLANTAUPAKI ROADCURVE ADVISORY SIGNS AND LOCATIONS
NOT FOR CONSTRUCTION
FOR CONSULTATION
20/04/2018
1718443_01_006_G101
GENERAL NOTES1. ALL SIGNS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART1. TRAFFIC SIGNS AND TRAFFIC CONTROL DEVICES MANUAL.2. THE PROPOSED SIGNS SHOWN ON THE DRAWING ARE INDICATIVE ONLY. ACTUAL LOCATIONS TO BE CONFIRMED WITH SITE ENGINEER.3. ALL EDGE MARKER POSTS TO BE INSTALLED IN ACCORDANCE WITH MOTSAM PART 2 SECTION 5.05.4. WHERE DRIVEWAYS, ACCESSES OR SIDE ROAD LOCATIONS COINCIDES WITH EDGE MARKER POST PLACEMENT, INSTALL EDGE MARKER
POST ON EITHER SIDE OF THESE DRIVEWAYS, ACCESSES AND SIDE ROADS.5. BI-DIRECTIONAL RRPMs TO BE INSTALLED ON CENTRELINE @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.6. RED MONO-DIRECTIONAL RRPMs TO BE INSTALLED @ 20m SPACING AND AS PER MOTSAM PART2: SECTION 4.06.06.7. RED MONO-DIRECTIONAL RRPMs TO COMMENCE AND TERMINATE AT TANGENT OF CURVE.8. ALL CENTRELINES AND EDGE LINES ARE TO BE INSTALLED AS PER MOTSAM PART 2: SECTION 2.01 @ 2.03.9. ALL DIMENSIONS SHOWN ARE METRES UNLESS STATED OTHERWISE.
NOTE
CURVE ADVISORY SIGNS AND LOCATIONS
NUMBER CHAINAGE FOR DIRECTION OF TRAVEL SIGN TURNING DIRECTION NOTES SIGN IMAGE
1 634 NB PW-17 LT
2 686 NB PW-17 LT REMOVAL
3 1238 SB PW-17 RT MODIFIED TWO INTERSECTIONS AT CURVE
4 1560 NB PW-20
5 1921 SB PW-20
6 2023 NB PW-17 RT
7 2325 SB PW-17 LT
8 4207 NB PW-17 RT
9 4551 SB PW-17 LT
1. CHAINAGE:00.00 NORTHBOUND BEGINS AT INTERSECTIONOF TAUPAKI ROAD AND WAITAKERE ROAD AND ENDS ATINTERSECTION OF TAUPAKI ROAD AND STATE HIGHWAY 16.