NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB...

24
NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPE 1 22nd annual report : Lembaga Letrik Negara. NA TNB 2 23rd annual report 1972 : Lembaga Letrik Negara. NA TNB 3 24th annual report : Lembaga Letrik Negara NA TNB 4 28th annual report : Lembaga Letrik Negara NA TNB 5 29th annual report : Lembaga Letrik Negara. NA TNB 6 2nd technician examination (consumer) Lembaga Letrik Negara. NA TNB 7 300 MW termal plant simulator NA NA TNB 8 300mw thermal plant simulator for Sultan Ahmad Shah Training Institute, National Electricity Board of the States of Malaya : Rediffusion Simulation Limited NA TNB 9 32nd annual report 1981 : Lembaga Letrik Negara NA TNB 10 35 tahun bersama : elektrik membina hidup sempurna = Lembaga Letrik Negara NA TNB 11 35th annual report 1984 : Lembaga Letrik Negara NA TNB 12 36th annual report 1985 : Lembaga Letrik Negara NA TNB 13 37th annual report 1986 : Lembaga Letrik Negara NA TNB 14 A background paper on training in distribution for the reference of the area managers : NA NA TNB 15 A Course for standardisation of medium and low voltage overhead mains practice / Lembaga Letrik Negara NA TNB 16 Achieving planning targets / Lembaga Letrik Negara NA TNB 17 Amalan bengkel / ISAS NA TNB 18 Annual report : Lembaga Letrik Negara. NA TNB 19 Annual report = Laporan tahunan (Bagi tahun berakhir 31 Ogos 1991 - 31 Ogos 1993 ) Tenaga Nasional Berhad. NA TNB 20 Annual report = laporan tahunan 2000 : Tenaga Nasional Berhad NA TNB 21 Annual report 1963 : NA NA TNB 22 Annual report 1965 : NA NA TNB 23 Annual report 1966 : NA NA TNB 24 Annual report 1979 : NA NA TNB 25 Annual Report National Electricity Board of the states of Malaya NA NA TNB

Transcript of NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB...

Page 1: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPE

1 22nd annual report : Lembaga Letrik Negara. NA TNB

2 23rd annual report 1972 : Lembaga Letrik Negara. NA TNB

3 24th annual report : Lembaga Letrik Negara NA TNB

4 28th annual report : Lembaga Letrik Negara NA TNB

5 29th annual report : Lembaga Letrik Negara. NA TNB

6 2nd technician examination (consumer) Lembaga Letrik Negara. NA TNB

7 300 MW termal plant simulator NA NA TNB

8

300mw thermal plant simulator for Sultan Ahmad Shah

Training Institute, National Electricity Board of the

States of Malaya :

Rediffusion Simulation Limited NA TNB

9 32nd annual report 1981 : Lembaga Letrik Negara NA TNB

1035 tahun bersama : elektrik membina hidup sempurna = Lembaga Letrik Negara NA TNB

11 35th annual report 1984 : Lembaga Letrik Negara NA TNB

12 36th annual report 1985 : Lembaga Letrik Negara NA TNB

13 37th annual report 1986 : Lembaga Letrik Negara NA TNB

14

A background paper on training in distribution for the

reference of the area managers :NA NA TNB

15

A Course for standardisation of medium and low voltage

overhead mains practice /Lembaga Letrik Negara NA TNB

16 Achieving planning targets / Lembaga Letrik Negara NA TNB

17 Amalan bengkel / ISAS NA TNB

18 Annual report : Lembaga Letrik Negara. NA TNB

19

Annual report = Laporan tahunan (Bagi tahun berakhir

31 Ogos 1991 - 31 Ogos 1993 )Tenaga Nasional Berhad. NA TNB

20 Annual report = laporan tahunan 2000 : Tenaga Nasional Berhad NA TNB

21 Annual report 1963 : NA NA TNB

22 Annual report 1965 : NA NA TNB

23 Annual report 1966 : NA NA TNB

24 Annual report 1979 : NA NA TNB

25

Annual Report National Electricity Board of the states of

MalayaNA NA TNB

Page 2: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

26 ASEAN electric power statistic 1988r vol.1 : NA NA TNB

27

Asean working group sub committee meeting on

management and supervisory :NA NA TNB

28Atenden mesin bantu (moduil pertama dan kedua) :

compiled by Staff of Institut Latihan Sultan

Ahmad ShahNA TNB

29Automatic motor control for technician ISA/C345112 / ISAS NA TNB

30 Belanjawan hasil tahun 1987/88 / Lembaga Letrik Negara. NA TNB

31 Belanjawan hasil tahun 1988/89 / Lembaga Letrik Negara. NA TNB

32 Belanjawan hasil tahun 1990/91 / Lembaga Letrik Negara. NA TNB

33

Belanjawan modal (ulangkaji) tahun 1987/88 dan

belanjawan modal utama tahun 1988/89 /Malaysia. Lembaga Letrik Negara NA TNB

34

Belanjawan modal (ulangkaji) tahun 1989/90 dan

belanjawan modal utama tahun 1990/91 /Lembaga Letrik Negara NA TNB

35

Bengkel kerja untuk kontraktor-kontraktor binaan

bumiputra :Lembaga Letrik Negara. NA TNB

36Binaan dan senggaraan pencawang 11kv juruteknik :

compiled by Staff of Institut Latihan Sultan

Ahmad ShahNA TNB

37Binaan dan senggaraan pencawang 11kv jurutera :

compiled by Staff of Institut Latihan Sultan

Ahmad ShahNA TNB

38

Binaan dan senggaraan pencawang II KV untuk

juruteknik J51OO36SPOO /ISAS. NA TNB

39 Boiler control system ISA/C347208 / ISAS. NA TNB

40

Boilers and pressure vessels : section 1 : rules for

construction of power boilers :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.1000000923 TNB

41Boilers and pressure vessels code cases (supplement) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

42 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

43 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

44 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

45 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

46 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

47 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

Page 3: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

48 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

49 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

50 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

51 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

52 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

53 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

54 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

55 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

56 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

57 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

58 Buku panduan organisasi : Lembaga Letrik Negara. NA TNB

59

Buku panduan organisasi worksyop pusat (central

workshop) /NA NA TNB

60 Buku panduan perkhidmatan pengguna / Tenaga Nasional Berhad. NA TNB

61

Capabilities and objectives presented to Lembaga Letrik

Negara /Lembaga Letrik Negara. NA TNB

62

Challenges in developing and implementing

environmental management system ISO 14001 :prepared by Jamal b. Alias .. [et al.]. NA TNB

63

Collective agreement between Tenaga Nasional Berhad

and Kesatuan Pegawai-Pegawai Rendah Tenaga Nasional

Berhad 1993 - 1995 /

Tenaga Nasional. NA TNB

64

Collective agreement between Tenaga Nasional Berhad

and Kesatuan Pegawai-Pegawai Rendah Tenaga Nasional

Berhad 1993 - 1995 /

NA NA TNB

65

Conference proceedings of the UNITEN Business

Management Conference held on 13-14 September

1999 at Universiti Tenaga Nasional, Kajang /

NA NA TNB

66

Configuration of a distributed control system (DCS) ISA/

C347211 /NA NA TNB

67 Construction contract claims for TNB executives : James R Knowles (M) Sdn. Bhd. 1000002475 TNB

68 Consumers accounts procedure and records Lembaga Letrik Negara. NA TNB

69 Contract for civil engineering work NA NA TNB

Page 4: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

70 Contract for civil engineering work/ Lembaga Letrik Negara NA TNB

71

Corporate finance lessons from the impact of the Asian

financial crisis on different economic sectors in Malaysia

/

by Leong Kai Hin and Chan Kok Thim NA TNB

72

Course development telecommunication (CODEVTEL)

UNDP :

compiled by Staff of Institut Latihan Sultan

Ahmad ShahNA TNB

73 Current development plans and future prospects. NA NA TNB

74

Current research and applications of information

technology and multimedia :Organized by Universiti Tenaga Nasional. NA TNB

75 Day care centre / Ainol Fadley bin Limin..[et al.] NA TNB

76 Deraf terma dan syarat-syarat perkhidmatan / Lembaga Letrik Negara NA TNB

77

Design and implementation of motor testing procedures

in TNB Research Sdn. Bhd. for direct-current motor /Seo Tze Han ; College of Engineering. NA TNB

78 Digital techniques ISA/C349315 / ISAS. NA TNB

79 Direktori program latihan 1998 / Institut Sultan Ahmad Shah, UNITEN. NA TNB

80

Direktori Program latihan Institut Kejuruteraan

Teknologi Tenaga Nasional (IKATAN) :NA NA TNB

81

Direktori program latihan Institut Kejuruteraan

Teknologi Tenaga Nasional (IKATAN) 1996 :

Institut Kejuruteraan Teknologi Tenaga

Nasional.NA TNB

82 Distributed control system (DCS) ISA/C347210 / ISAS. NA TNB

83

Distributed control system for shift engineers/operators

ISA/C349213 /ISAS. NA TNB

84

Double-flow-type seal-oil unit for hydrogen turbine

generators :

compiled by Staff of Institut Latihan Sultan

Ahmad ShahNA TNB

85

Eksekutif wanita Melayu dan pekerjaan di sektor

korporat :Mohd. Noor Jais. NA TNB

86 Electrical building services : Lembaga Letrik Negara. NA TNB

87

Electrical engoneering department's research

publicationsNA NA TNB

88 Electrical relays : British Standards Institution. NA TNB

89 Engineering technology in LLN : Lembaga Letrik Negara NA TNB

90 Engineering technology in LLN : Lembaga Letrik Negara NA TNB

Page 5: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

91 Engineering technology in LLN : Lembaga Letrik Negara. NA TNB

92Entrepreneurship project :

prepared by Noor Huzaidah bte Husin..[et

al.]NA TNB

93 Evaluation techniques : NA NA TNB

94

Expert services for human resource development

project :contract no. 53/87. NA TNB

95

Exploratory study on the level of satisfaction of TNB's

large power customers (LPCs) within the Klang Velley /

S Palani Samy, Wong Meng Keong and

Kamarul Suzaini bt Hj Busu Piah.NA TNB

96

Factors determining differential impacts of the financial

crisis in Southeast Asia /by Leong Kai Hin and Chow Mun Yuen. NA TNB

97 Figures : Tenaga Nasional BErhad. NA TNB

98 First half year interim financial results 1994 / Tenaga Nasional Berhad. NA TNB

99 FOPS NA NA TNB

100Harmonic study of an electrical distribution system / Saleh A. Al-Amri. NA TNB

101 Highlights 1987/88 / National Electricity Board. NA TNB

102 Hydraulic crane with earth auger / ISAS. NA TNB

103 Identification system for power plants / NA NA TNB

104 Implementing organizational renewal in LLN : Lembaga Letrik Negara. NA TNB

105

Indoor air quality assessment at Malaysia Transformer

Manufacturing Sdn. Bhd. /submitted by Universiti Tenaga Nasional. NA TNB

106

Indoor air quality assessment at Tenaga Switchgear Sdn.

Bhd. /submitted by Universiti Tenaga Nasional NA TNB

107 Information systems strategic plan : Tenaga Nasional Berhad. NA TNB

108

Inspection and maintenance guidelines for hydrogen

inner-cooled generator and brushless exciter :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

109

Installation, operation and maintenance instructions

concerningNA NA TNB

110

Instruction manual two 300 MW turbine-genarators and

ancillary plant for Port Klang Power Station/NA NA TNB

Page 6: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

111 Instruction manuals steam turbine (vol. T-1/4). NA TNB

112 Instrumentation and control systems / Mohd. Shafie bin Abu Hassan. NA TNB

113 Internet / ISAS. NA TNB

114

Jointing manual for medium voltage & 11 k.v.

underground cables.NA NA TNB

115 Juruelektrik jangka dan pengujian / ISAS NA TNB

116Juruelektrik perlindungan - modul kedua :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

117Juruelektrik perlindungan (modul pertama) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

118Juruelektrik perlindungan modiul ketiga :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

119Jurugegas elektrik tingkatan biasa J51OO36SPOO / ISAS. NA TNB

120 Ke arah pengurusan bahan-bahan yang berkesan : Lembaga Letrik Negara. 1000000411 TNB

121 Kebel bawah tanah untuk juruteknik / ISAS. NA TNB

122 Kebel bawah tanah untuk jurutera / Institut Latihan Sultan Ahmad Shah. NA TNB

123 Kejayaan 1982/83 / Lembaga Letrik Negara. NA TNB

124 Kejayaan 1983/84 / Lembaga Letrik Negara. NA TNB

125 Kejayaan 1985/86 / Lembaga Letrik Negara. NA TNB

126 Kejayaan 1985/86 / Lembaga Letrik Negara. NA TNB

127 Kejayaan 1988/89 / Lembaga Letrik Negara. NA TNB

128Kendalian pencawang 11kv juruteknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

129Kendalian pencawang 11kv pembantu teknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

130Kendalian pencawang untuk juruteknik J51OO36KPOO / ISAS. NA TNB

131Kendalian pencawang untuk jurutera J51OO35KPOO / ISAS. NA TNB

132Kertas kerja projek untuk konvensyen QCS-IT TNB 1994. NA NA TNB

Page 7: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

133

Kertas Kerja Seminar Pengswastaan Lembaga Letrik

Negara, Tanah Melayu pada 17-18 April 1987 di Petaling

Jaya /

Lembaga Letrik Negara. NA TNB

134

Keruntuhan akhlak di Institusi Pengajian Tinggi : kajian

kes di Universiti Tenaga Nasional (UNITEN) /

Para penyelidik Haizan bt. Mohd Taha ..[et

al.].NA TNB

135 Keselamatan dan kesihatan pekerja / ISAS. NA TNB

136Keselamatan perindustrian dan memasang peranca :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

137 Konvensyen QCS-IT 1996 peringkat kebangsaan / NA NA TNB

138

Kursus Antaramuka '92 :

diselengarakan oleh Bahagian

Pembangunan Instrumentasi &

kawalan Unit Tenaga Nuklear.

NA TNB

139Kursus attendan papansuis :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

140

Kursus kabel bawah tanah voltan rendah/voltan

sederhana juruteknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

141

Kursus kabel bawah tanah voltan rendah/voltan

sederhana jurutera :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

142Kursus kabel berisi minyak - 33kv :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

143 Kursus khidmat nasihat untuk kedai tenaga / ISAS. NA TNB

144

Kursus komunikasi massa pemeriksa penerbitan (sessi

pertama) 1991NA NA TNB

145

Kursus pemasang talian tingkatan biasa voltan

rendah/voltan sederhana :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

146 Kursus pencantum kabel II KV / UNITEN. NA TNB

147Kursus pencari kerosakan :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

148Kursus pengendali kawalan stesen dan pencawang :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

149Kursus penolong pengendali yunit modiul 1,2,3 :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

Page 8: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

150Kursus penyambung kabel T/Biasa :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

151Kursus perantis modiul 1 - mesin elektrik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

152

Kursus talian atas voltan rendah/voltan sederhana

pembantu teknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

153 Laporan akhir latihan kemahiran di Jepun. NA NA TNB

154

Laporan kursus percetakan umum, 9 April hingga 23 Jun

1990 di Jabatan Percetakan Negara /M. Gopalakrishnan. NA TNB

155

Laporan Persidangan Kerja Pengurusan = Implementing

Organisational Renewal in LLN, 25-27 Jun, 1986, Kuala

Lumpur.

Lembaga Letrik Negara. NA TNB

156 Laporan tahunan = annual report 1993 : NA NA TNB

157 Laporan tahunan = annual report 1994 : Tenaga Nasional Berhad. NA TNB

158 Laporan tahunan = annual report 1995 : Tenaga Nasional Berhad. NA TNB

159 Laporan tahunan = annual report 1995 : Tenaga Nasional Berhad. NA TNB

160 Laporan tahunan = annual report 1996 : Tenaga Nasional Berhad. NA TNB

161 Laporan tahunan = Annual report 1998 : Tenaga Nasional Berhad. NA TNB

162 Laporan tahunan 1992 : Tenaga Nasional Berhad. NA TNB

163 Laporan tahunan 1992 : laporan kewangan = Tenaga Nasional Berhad. NA TNB

164 Laporan tahunan 1993 : Tenaga Nasional Berhad. NA TNB

165Laporan tahunan bagi tahun berakhir 31 Ogos 1990 Lembaga Letrik Negara. NA TNB

166 Laporan tahunan bil.1 hingga bil.3, 1966-1977 : NA NA TNB

167 Laporan tahunan ke 26 : Lembaga Letrik Negara. NA TNB

168 Laporan tahunan ke 27 : Lembaga Letrik Negara. NA TNB

169 Laporan tahunan ke 31 : Lembaga Letrik Negara. NA TNB

170 Laporan tahunan ke 32 : Lembaga Letrik Negara. NA TNB

171 Laporan tahunan ke 34 : Lembaga Letrik Negara. NA TNB

172 Laporan tahunan ke 35 : Lembaga Letrik Negara. NA TNB

173 Laporan tahunan ke 37 : Lembaga Letrik Negara. NA TNB

174 Laporan tahunan ke 37 1987 : NA NA TNB

175 Laporan tahunan ke 38 : Lembaga Letrik Negara. NA TNB

Page 9: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

176 Laporan tahunan ke 39 : Lembaga Letrik Negara. NA TNB

177 Laporan tahunan ke 45, 1995 : Koperatif Tenaga Nasional Berhad. NA TNB

178 Lapuran Persidangan Kerja Pengurusan = Lembaga Letrik Negara. NA TNB

179 Lapuran tahunan 1988 -89 Lembaga Letrik Negara. NA TNB

180 Lapuran tahunan 1997 : NA NA TNB

181 Lapuran tahunan ke 23 : Lembaga Letrik Negara. NA TNB

182 Lapuran tahunan ke 24 : Lembaga Letrik Negara. NA TNB

183 Lapuran tahunan ke 28 : Lembaga Letrik Negara. NA TNB

184 Lapuran tahunan ke 30 : Lembaga Letrik Negara. NA TNB

185

Latihan ulangkaji kendalian pencawang untuk orang

berkebenaran J51OO35KPOO /ISAS. NA TNB

186

Lawatan perpisahan YB Tan Sri Dato Abu Zarim bin Haji

Omar ke Institut Latihan Sultan Ahmad Shah, Lembaga

Letrik Negara. 3 Mac 1984 /

Lembaga Letrik Negara NA TNB

187 Lembaga Letrik Negara : Lembaga Letrik Negara. NA TNB

188

Lembaga Letrik Negara = National electricity Board of

the State of Malaya :Lembaga Letrik Negara. NA TNB

189 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. 1000000418 TNB

190 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

191 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

192 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

193 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

194 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

195 Lembaga Letrik Negara Tanah Melayu : Lembaga Letrik Negara. NA TNB

196 Let there be power / Sumangala Pillai. 9839291025 TNB

197 Liquid penetrant flaw detection / Mohamad Suhaimi Jaafar. NA TNB

198Loji berat mekanik : pam dan pemampat :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

199Loji berat mekanik bering dan pelinciran :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

200Loji berat mekanik transmisyen :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

Page 10: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

201

Magnetic particle inspection technique of pelton wheel

of hydroelectric generator impulse turbine /Mohamad Suhaimi Jaafar. NA TNB

202Majlis taklimat Institut Latihan Sultan Ahmad Shah / Tenaga Nasional Berhad. NA TNB

203

Majlis taklimat Institut Latihan Sultan Ahmad Shah

Tenaga Nasional Berhad kepada pemberita Malaysia /Tenaga Nasional Berhad. NA TNB

204Malaysian favourite : prepared by Amiruddin b Yusof..[et al]. NA TNB

205 Malaysia's investment development path / Bala Ramasamy. NA TNB

206Malaysia's multinationals /

Bala Ramasamy, Lalina Selvamaniam and

Kamariah Othman.NA TNB

207

Management and engineering training for electric power

utilitiesNA NA TNB

208Manusia, tenaga dan keselamatan elektrik /

Tenaga Nasional Reserach and

Development.9679974901 TNB

209 Marketing activities 1988/89 : Lembaga Letrik Negara. NA TNB

210 ME Technical Publication, Vol. 1& 2 NA NA TNB

211 ME Technical Publication, Vol. 4 NA NA TNB

212

Memorandum of understanding between Tenaga

Nasional berhad and B.C. Hydro for Inter Utility

Cooperation.

Tenaga Nasional berhad NA TNB

213Mencari kerosakan kabel bawah tanah juruteknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

214Mencari kerosakan kabel bawah tanah jurutera :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

215

Mencarik kerosakan kebel bawah tanah untuk juruteknik

J51OO36KPOO /ISAS. NA TNB

216

Mencarik kerosakan kebel bawah tanah untuk jurutera

J51OO36KPOO /Institut Latihan Sultan Ahmad shah. NA TNB

217 Microsoft access 7.0 lanjutan / ISAS. NA TNB

Page 11: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

218

Microsoft access seksyen komputer dan informasi

teknologi /ISAS. NA TNB

219 Microsoft office (microsoft word 7) / ISAS. NA TNB

220

Microsoft office (microsoft) excel seksyen komputer dan

informasi /ISAS. NA TNB

221 Microsoft office (windows 95) / ISAS. NA TNB

222 Microsoft powerpoint 95 / ISAS. NA TNB

223 Microsoft project seksyen komputer and IT ISAS / ISAS. NA TNB

224 Multiskilling customer supplies team / UNITEN. NA TNB

225 National electricity Board : National Electricity Board. NA TNB

226National electricity board of the states of Malaya : Lembaga Letrik Negara. NA TNB

227National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

228National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

229National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

230National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

231National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

232National Electricity Board of the States of Malaya : Lembaga Letrik Negara. NA TNB

233 National energy balances : NA NA TNB

234National energy balances Malaysia, 1978-1984 / Kementerian Tenaga, Telekom dan Pos. NA TNB

235National energy balances Malaysia, 1980-1999 / Kementerian Tenaga, Telekom dan Pos. NA TNB

236

National forum on Malaysian Enemy perspectives in the

year 201012-13 February 1990. NA TNB

237

National Forum on Malaysian Energy Perspectives in the

year 2010:12-13 February 1990. NA TNB

Page 12: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

238

National Forum on Malaysian Energy Perspectives in the

year 2010:NA NA TNB

239

New executives training scheme (nets) instrument and

electrical /ISAS. NA TNB

240

New facilities for the manufacture of large steam-

turbine generations at Kobe works :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

241

Non-destructive testing surface method liquid penetrant

testing PT /ISAS. NA TNB

242

Non-destructive testing surface method magnetic

particle testing /ISAS. NA TNB

243 Nota kursus SLKK September 1996. NA TNB

244 Nota kursus SLKK : NA NA TNB

245 Nota kursus SLKK unit kimpalan : Tenaga Nasional Berhad. NA TNB

246

Nota-nota kursus penghantaran dan pembahagian untuk

jurutera ILSAS :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

247Operating & maintenance manual volume 3 of 5 : NA NA TNB

248 Operating & maintenance manuals : Lembaga Letrik Negara. NA TNB

249

Operating and maintenance instructions for automatic

voltage regulators :NA NA TNB

250

Operating and maintenance manuals 6x100mw gas

turbine generator sets and their auxiliaries for Paka

power station phase 1 : CGEE Alsthom :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

251

Operation & maintenance manual for Port Klang

Power Station-phase 1 :contract no. 31/78/20. NA TNB

252 Organization renewal in LLN June 26th, 1986 / Malaysia. Lembaga Letrik Negara NA TNB

253 Organizational renewal in LLN / Lembaga Letrik Negara. NA TNB

254 Paka power station-phase 1 contract no1/81/11 : Lembaga Letrik Negara. NA TNB

255 Panduan keselamatan kebakaran / Lembaga Letrik Negara. NA TNB

256 Panduan ketua jurutera / by Lembaga Letrik Negara. NA TNB

257

Panduan penyenggaraan daftar pekerja mengikut

peraturan-peraturan kerja 1957 :Tenaga Nasional Berhad. NA TNB

258 Pekeliling Pengurus Besar No. 40/1990 : NA NA TNB

Page 13: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

259Pelatih pekerja (modiul pertama dan kedua) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

260Pelatih pekerja :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

261 Pelbagai kemahiran (senggaraan) J51OO36SPOO / ISAS. NA TNB

262 Pemampat : Jawahir bin Hilmi. NA TNB

263 Pemasangan jangka untuk Juruteknik / ISAS. NA TNB

264 Pemasangan jangka untuk kedet juruteknik / ISAS. NA TNB

265Pembaik kerosakan tingkatan biasa J51OO36SPOO / ISAS. NA TNB

266

Pembaik kerosakan tingkatan biasa P&P

J51OO36SPOO /ISAS. NA TNB

267

Pendawaian elektrik untuk juruelektik jangka dan

pengujian /ISAS. NA TNB

268 Pendawaian elektrik untuk SLKK / ISAS. NA TNB

269 Pengenalan analisis getaran / ISAS. NA TNB

270 Penggerak kemajuan negara = Tenaag Nasional Berhad. NA TNB

271 Pengguna dan pemasangan elektrik / ISAS. NA TNB

272

Penjaga jentera elektrik (kategori B O-Pencawang)

J51OO36SPOO /NA NA TNB

273 Penjaga jentera elektrik / ISAS. NA TNB

274Penjanaan dan kendalian sistem : perantis ketukangan :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

275 Penjanaan kendalian sistem / ISAS. NA TNB

276Penubuhan pusat latihan Tenaga Nasional di Bangi /

Institut latihan Sultan Ahmad Shah, Tenaga

Nasioal, Berhad.NA TNB

277Perantis jurugegas (modiul Am - modiul ketiga) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

278Perantis jurugegas elektrik moduil III :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

279

Perantis ketukangan moduil Am, moduil pertama,

moduil kedua dan moduil ketiga :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

Page 14: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

280Perantis kimpalan (modiul Am dan modiul 1) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

281Perantis mesin-memesin (modiul Am dan modiul 1) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

282

Perantis sains mekanik dan amali stesen janaelektrik

(moduil AM dan moduil 1) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

283

Perjalanan program pembangunan pengurusan khjemah

kerja penguasa stn.Institut Latihan Lembaga Letrik Negara. NA TNB

284

Perjanjian kolektif di antara Tenaga Nasional Berhad

dengan Kesatuan Pegawai-Pegawai Rendah Tenaga

NAsional Berhad 1993 - 1995 =

NA NA TNB

285Perlindungan sistem 11kv/33kv juruteknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

286Perlindungan sistem 11kV/33kV jurutera :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

287Perlindungan sistem 11kv/33kv pembantu teknik :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

288

Perlindungan sistem pembahagian 33 KV untuk

juruteknik J51OO36PPOO /ISAS. NA TNB

289

Perlindungan sistem pembahagian 33KV untuk jurutera

J51OO36PPOO /ISAS. NA TNB

290

Persidangan Pegawai-pegawai Latihan dalam Jabatan 23-

25hb Jan 1980:NA NA TNB

291 Perusahaan Otomobil Kedua Sdn Bhd. / Ahmad Fairos Mohd. Rauf ..[et al.]. NA TNB

292

Planning and budgetary control course 9-11, November

1988 /by Lembaga Letrik Negara. NA TNB

293 Planning and controlling module. NA NA TNB

294Port Klang power station phase 1 : instruction manual : Lembaga Letrik Negara,. NA TNB

295Port Klang power station phase 1 : instruction manual : Lembaga Letrik Negara,. NA TNB

296Port Klang power station phase 1 : instruction manual : Lembaga Letrik Negara,. NA TNB

Page 15: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

297Port Klang power station phase 1 : instruction manual : Lembaga Letrik Negara,. NA TNB

298Port Klang power station phase 1 : instruction manual : Lembaga Letrik Negara,. NA TNB

299Power System optimization in Tenaga Nasional Berhad

ILSAS, Bangi (kuala Lumpur) Malaysia 29 July

- 2 August 1991.NA TNB

300 Prantis ketukangan : Institut Latihan Lembaga Letrik Negara. NA TNB

301 Prinsip elektrik / ISAS. NA TNB

302 Proceedings : Lembaga Letrik Negara. NA TNB

303 Proceedings of the management retraet : Lembaga Letrik Negara. NA TNB

304

Proceedings of the working group meeting on energy

planning and programming and of the committee on

natural resources, fifth session /

United Nations. 1000001235 TNB

305

Proceedings seminar penswastaan Lembaga Letrik

Negara /Lembaga Letrik Negara. NA TNB

306 Program latihan : Institut Latihan Sultan Ahmad Shah NA TNB

307 Program latihan : Institut Latihan Sultan Ahmad Shah. NA TNB

308 Program latihan : Institut Latihan Sultan Ahmad Shah. NA TNB

309 Program latihan : Institut Latihan Sultan Ahmad Shah. NA TNB

310 Program latihan : Institut Latihan Sultan Ahmad Shah. NA TNB

311 Program latihan : Institut Latihan Sultan Ahmad Shah. NA TNB

312 Program latihan ILSAS 1992 : Institut Latihan Sultan Ahmad Shah. NA TNB

313 Program latihan ILSAS 1994 : Institut Latihan Sultan Ahmad Shah. NA TNB

314

Program seminar kecekapan penjanaan kuasa di stesen

janaelektrik habaLembaga Letrik Negara. NA TNB

315

Programmable logic controller (electrical) for

technicians ISA/C345110 /ISAS. NA TNB

316

Project for introducing new working practices to the

National Electricity Board of the States of Malaya.Lembaga Letrik Negara Tanah Melayu NA TNB

317Project information Bakun hydroelectric project / Kementerian Tenaga, Telekom dan Pos. NA TNB

318 Project of the Government of Malaysia : Lembaga Letrik Negara Tanah Melayu. NA TNB

Page 16: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

319

Proposal for provision of design manuals and training

courses for transmission line designers at 132kV and

275kV /

State Electricity Commission of Victoria. NA TNB

320

Proposal papers and general information for educational

equipment for electrical and mechanical engineering

education /

ASEA Sdn. Bhd. NA TNB

321

Proposal to provide power utility training for Ceylon

Electricity Board Sri LankaTenaga Nasional Berhad. NA TNB

322

Proposed distribution system for rural electrification for

Pahang Tenggara.NA NA TNB

323 Prosedur tatatertib Tenaga Nasional Berhad. NA TNB

324 Prospectus Tenaga Nasional Berhad : Tenaga Nasional Berhad. NA TNB

325 Protection and control code of practice / Tenaga Nasional Berhad. 9839291068 TNB

326Protection and relays (IB No. W.10.351) :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

327 Pusat sumber ILSAS, Tenaga Nasional Berhad : NA NA TNB

328 Putra Medical Centre : Lau Chee Kin..[et al.]. NA TNB

329 Quality Control procedures manual : Lembaga Letrik Negara. NA TNB

330 Quality month special presentation : Tenaga Nasional Berhad. NA TNB

331 Rancangan Bekalan Elektrik Luar Bandar : Tenaga Nasional Berhad NA TNB

332 Rancangan Bekalan Elektrik Luar Bandar : Tenaga Nasional Malaysia. NA TNB

333 Rancangan operasi dan pembangunan 1988/89 Lembaga Letrik Negara. NA TNB

334 Rancangan operasi dan pembangunan 1989/90 / Lembaga Letrik Negara. NA TNB

335 Ranchangan Letrik-Haidero Batang Padang : Lembaga Letrik Negara Tanah Melayu NA TNB

336 Rate design workshop : NA NA TNB

337

Recent advances and future trends in IT and Multimedia

: proceedings of the International Conference on

Information Technology and Multimedia, 13-15 August

2001, Universiti Tenaga Nasional /

NA 9834086814 TNB

338Recods and procedure for meters and instruments NA NA TNB

Page 17: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

339

Recommendation on system for site, buildings and

equipment maintenance :P.P. Colborne. NA TNB

340

Reconstruction of electricity supply infrastructure of

Afghanistan /Tenaga Nasional Berhad. NA TNB

341 Review of pupillage for new senior officers Lembaga Letrik Negara. NA TNB

342

SEAMEO colloquium on engineering and technology

education /

SEAMEO-Regional Institute for Higher

Education (RIHED).NA TNB

343

Section IEE ISAS UNITEN control valve sizing

ISA/C349207 /ISAS. NA TNB

344Section IEE ISAS UNITEN power electronic ISA/C349320 / ISAS. NA TNB

345

Section IEE ISAS UNITEN process measurement (ATP

status) ISA/C345201 /ISAS. NA TNB

346 Seminar and workshop on Fuzzy logic NA NA TNB

347 Seminar dalam jabatan : Lembaga Letrik Negara. NA TNB

348 Seminar kakitangan instruksional ILSAS : Institut Latihan Sultan Ahmad Shah. NA TNB

349

Seminar kecekapan penjanaan kuasa di stesen

janaelektrik haba :Lembaga Letrik Negara. NA TNB

350Senarai tugas-tugas pegawai-pegawai kanan stesen : Lembaga Letrik Negara. NA TNB

351

Senior Officers Management Training (ILSAS: 30th

Disember 1989)Wahid b. Ali, Jurutera Latihan Kanan. NA TNB

352Skim kemahiran ketukangan 1991/1992 : Seksyen Elektronik dan Jangkawas, ILSAS. NA TNB

353 Skim Kemahiran Ketukangan 1991/1992 : Seksyen Kejueruteraan Mekanikal. NA TNB

354Skim kemahiran ketukangan 1991/1992 :

Seksyen Penghantaran & Pembahagian

ILSAS.NA TNB

355 Specification and quotation : The National Electricity Board. NA TNB

356

Specification for E.H.T. overhead lines for voltages up to

33,000v.National electricity Board. NA TNB

357Standby generator set for technicians ISA/C345111 / ISAS. NA TNB

358 Statistical bulletin : NA NA TNB

Page 18: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

359

Stesen Janaelektrik Sultan Ismail, Paka, Dungun,

Trengganu Darul Iman =Lembaga Letrik Negara. NA TNB

360Sukatan peperiksaan juruteknik rendah :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

361Sultan Salahuddin Abdul Aziz Power Station Phase 1 : Tenaga Nasional Berhad NA TNB

362Sultan Salahuddin Abdul Aziz Power Station Phase 1 : Lembaga Letrik Negara. NA TNB

363

Sultan Salahuddin Abdul Aziz Power Station Phase 1 : on

the job training program :Universiti Tenaga Nasional. NA TNB

364

Sultan Salahuddin Abdul Aziz Power Station Phase 1 : on

the job training program :Universiti Tenaga Nasional. NA TNB

365

Sultan Salahuddin Abdul Aziz Power Station Phase 1 : on

the job training program :Universiti Tenaga Nasional. NA TNB

366

Sultan Salahuddin Abdul Aziz Power Station Phase 1 : on

the job training program :Universiti Tenaga Nasional. NA TNB

367

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

368

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

369

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

370

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

371

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

Page 19: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

372

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

373

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

374

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

375

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

376

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

377

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

378

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

379

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

380

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

381

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

382

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

Page 20: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

383

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

384

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

385

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

386

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

387

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

388

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

389

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

390

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

391

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

392

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

393

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

Page 21: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

394

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

395

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

396

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

397

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

398

Sultan Salahuddin Abdul Aziz Power Station Phase 1 :

system descriptions, operating procedures and OJT

modules :

Universiti Tenaga Nasional. NA TNB

399 Supplement to 25th annual report : Lembaga Letrik Negara NA TNB

400 Supplement to 26th annual report : Lembaga Letrik Negara. NA TNB

401 Supplement to 28th annual report : Lembaga Letrik Negara. NA TNB

402

Supply & installation of hardware & system

software forTenaga Nasional Berhad. NA TNB

403

Symposium technical papers on Information Technology

as an enabler for Tenaga in achieving vision 2020, 26-28

July, 1993 at Subang Merlin, Selangor /

Tenaga Nasional Berhad. NA TNB

404Taklimat latihan dan kursus Jabatan keselamatan : Lembaga Letrik Negara. NA TNB

405

Talian atas voltan tinggi 33KV untuk juruteknik/jurutera

/ISAS. NA TNB

406 Tambahan kepada laporan tahunan ke 22 : Lembaga Letrik Negara. NA TNB

407 Tambahan kepada laporan tahunan ke 27 : Lembaga Letrik Negara. NA TNB

408 Tambahan kepada laporan tahunan ke 28 : Lembaga Letrik Negara. NA TNB

409 Tambahan kepada laporan tahunan ke 29 : Lembaga Letrik Negara. NA TNB

410 Teknologi penjajaran aci / ISAS. NA TNB

Page 22: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

411 Teknologi penjajaran tarbin / ISAS. NA TNB

412 Teknologi senggaraan bering / UNITEN. NA TNB

413 Teknologi senggaraan dandang stim / ISAS. NA TNB

414 Teknologi senggaraan enjin diesel / ISAS. NA TNB

415 Teknologi senggaraan hidro / ISAS. NA TNB

416 Teknologi senggaraan injap / ISAS. NA TNB

417 Teknologi senggaraan pemampat / ISAS. NA TNB

418 Teknologi senggaraan penyaman udara / UNITEN. NA TNB

419 Teknologi senggaraan tarbin gas / ISAS. NA TNB

420 Teknologi senggaraan tarbin pam / ISAS. NA TNB

421 Teknologi senggaraan tarbin stim / ISAS. NA TNB

422 Tenaga Nasional Berhad : Buletin statistik 1992 : Tenaga Nasional Berhad. NA TNB

423 Tenaga Nasional Berhad : Buletin statistik 1993 : Tenaga Nasional Berhad. NA TNB

424

Tenaga penggerak kemajuan /Sumangala Pillai ; penterjemah, Kamsiah

Mohd Ali, Syed Nurul Akla Syed Abdullah983929105X TNB

425

The 300mw thermal plant simulator for Sultan Ahmad

Shah Training Institute, National Electricity Board of the

States of Malaya

Mitsubishi Electric Corporation NA TNB

426

The causality between stock returns and exchange rates

:by Bala Ramasamy and Matthew Yeung. NA TNB

427

The Determinants of transparency for singaporean listed

companies /by Paul Thompson and Matthew Yeung NA TNB

428 The eleventh annual report NA NA TNB

429

The impact of transparency on broker recommedations

and share price volatility :by Paul Thompson and Matthew Yeung. NA TNB

430 The inventory and valuation of fixed assets : Lembaga Letrik Negara. NA TNB

431

The overhead low voltage and high voltage hotline

course at Metropolitan Electricity Authority and

Electricity Generating Authority of Thailand /

Abdul Halim bin Abu Bakar. NA TNB

432The research and development :

Tenaga Nasional Reserach and

Development.NA TNB

Page 23: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

433

The socio-ecenomic determinants of international

football performance

by Robert Hoffmann, Lee Chew Ging and

Bala Ramasamy.NA TNB

434 The technical manager : ISAS. NA TNB

435

Third Apenplan national training course in energy

planning data :Apenplan Secretariat. NA TNB

436Training and technology transfer feasibility study : General Physics Corporation. NA TNB

437Training development guidelines (T.D.G.) by UNDP :

compiled by Staff of Institut Latihan Sultan

Ahmad Shah.NA TNB

438 Training methodology course : INTAN. NA TNB

439 Training programmes directory 2000 / Institut Sultan Ahmad Shah (ISAS). NA TNB

440Transmission and distribution systems and equipment :

Organized by Electricity Generating

Authority of Thailand.NA TNB

441 Ujian tampa musnah radiografi asas / ISAS. NA TNB

442 Ujian tampa musnah teknik ujian ultrasonik / UNITEN. NA TNB

443

Ultrasonic fields and beam shapes of ultrasonic

transducers /Mohamad Suhaimi Jaafar. NA TNB

444 Ultrasonic flaw detection of bearings / Mohamad Suhaimi Jaafar. NA TNB

445 Understand PID control ISA/C347205 / ISAS. NA TNB

446

UNDP/ESCAP REDP workshop on power system

management /

Government of Malaysia, UNDP/ESCAP,

Tenaga Nasional Berhad.1000001232 TNB

447 Welding reference manual / NA NA TNB

448

Woksyop Kemajuan perjangkaan dan pengujian Jabatan

Jangka dan Pengujian :Jabatan Jangka dan Pengujian. NA TNB

449

Woksyop mengenai "Towards Effective District

Management" :19-20 Ogos 1985. NA TNB

450

Woksyop pengurusan daerah khususnya dari segi

perniagaan, perakaunan dan pemerosesan data :Lembaga Letrik Negara. NA TNB

451

Zakat compliance behaviour: a case of zakat on

employment income in IIUM /

Mohd Hisyam bin Ghazali @ Mohd Zain ;

International Islamic University MalaysiaNA TNB

BACK

Page 24: NO. MAIN TITLE (Title) AUTHOR ISBN ITEM TYPEdspace.uniten.edu.my/bitstream/123456789/13634/14/14-TNB (TITLE).p… · Binaan dan senggaraan pencawang 11kv jurutera : compiled by Staff

KOHA Library System: https://vlibadmin.uniten.edu.my

Uniten Library Website: http://lib.uniten.edu.my/ulib/

1) KOHA Report : ID 259 (MYRA Report2: (BIBS)-By Titles)

2) KOHA Report : ID 267 (MYRA Report1 (ITEMS): By Volume)