PRIVATE POWER GENERATION (BUJAGALI) PROJECT · Maziba 1 MW Kisiizi 0.06 MW Paidha 3.5 MW Waki 6 MW...

1
Maziba 1 MW Kisiizi 0.06 MW Paidha 3.5 MW Waki 6 MW Buseruka 9 MW Ishasha 5.5 MW Mobuku I, II & III 28 MW Proposed Bujagali 250 MW Kikagati 10 MW Nalubaale & Kiira 180 MW 200 MW KAMPALA KAMPALA Kilak Kilak Oyam Oyam Dokolo Dokolo Busiki Busiki Bulisa Bulisa Abim Abim Ishaka Ishaka Ibanda Ibanda Rushere Rushere Nkouge Nkouge Kabulasoke Kabulasoke Ntungamo Ntungamo Hoima Hoima Iganga Iganga Busia Busia Sironko Sironko Bugiri Bugiri Kabale Kabale Kamuli Kamuli Kaliro Kaliro Butaleja Butaleja Kayunga Kayunga Kapchorwa Kapchorwa Bukwo Bukwo Nkenda Nkenda Kisoro Kisoro Katuna Katuna Kitgum Kitgum Kumi Kumi Lira Lira Kawanda Kawanda Nakasongola Nakasongola Masaka Masaka Bukoba Bukoba Kalangala Kalangala Entebbe Entebbe Masindi Masindi Mbarara Mbarara Moroto Moroto Nakapiripiriti Nakapiripiriti Katakwi Katakwi Amuria Amuria Moyo Moyo Kakumiro Kakumiro Bukumi Bukumi Pallisa Pallisa Soroti Soroti Fort Fort Portal Portal Arua Arua Jinja Jinja Mbale Mbale Bubulo Bubulo Tororo Tororo Gulu Gulu Nebbi Nebbi Apac Apac Amolatar Amolatar Mubende Mubende Rukungiri Rukungiri Isingiro Isingiro Rakai Rakai Mpigi Mpigi Mukono Mukono Mityana Mityana Kiboga Kiboga Kotido Kotido Kaabong Kaabong Adjumani Adjumani Yumbe Yumbe Koboko Koboko Ishaka Ibanda Rushere Nkouge Kabulasoke Ntungamo Hoima Iganga Busia Sironko Bugiri Kabale Kamuli Kaliro Butaleja Kayunga Kapchorwa Bukwo Nkenda Kisoro Katuna Kitgum Kumi Lira Kawanda Nakasongola Masaka Bukoba Kalangala Entebbe Masindi Mbarara Moroto Nakapiripiriti Katakwi Amuria Moyo Kakumiro Bukumi Pallisa Soroti Fort Portal Arua Jinja Mbale Bubulo Tororo Gulu Nebbi Apac Amolatar Mubende Rukungiri Isingiro Rakai Mpigi Mukono Mityana Kiboga Kotido Kaabong Adjumani Yumbe Koboko Kilak Oyam Dokolo Busiki Bulisa Abim KAMPALA DEM. REP. OF CONGO SUDAN KENYA KENYA TANZANIA TANZANIA RWANDA Lake Victoria Lake Edward Lake George Lake Kwania Lake Kyoga Lake Salisbury Lake Opeta L a k e A l b e r t O r a A l b e rt Nile Achwa V i c t o r i a N i l e O k o k L o ch o m a n S i t i N k u s i K a f u K atonga 30°E 4°N 2°N 2°N 32°E 34°E 32°E 34°E KAWANDA-BUJAGALI KAWANDA-BUJAGALI LINE (2X 132-220kV) LINE (2X 132-220kV) KAWANDA-BUJAGALI LINE (2X 132-220kV) BUJAGALI-NALUBAALE LINE (2X 132kV) BUJAGALI-TORORO LINE (2X 132kV) MAIN HIGHWAY SUBSTATION SUBSTATION SUBSTATION POWERHOUSE POWERHOUSE EXISTING EXISTING SITE ROAD SITE ROAD POWERHOUSE POWERHOUSE ACCESS ROAD ACCESS ROAD WORKSHOP WORKSHOP & STORE & STORE MAIN GATED MAIN GATED SPILLWAY SPILLWAY SIPHON SIPHON SPILLWAY SPILLWAY EMBANKMENT EMBANKMENT DAM DAM POWERHOUSE EXISTING SITE ROAD POWERHOUSE ACCESS ROAD WORKSHOP & STORE MAIN GATED SPILLWAY SIPHON SPILLWAY EMBANKMENT DAM DUMBBELL ISLAND N ile Riv e r To Jinja To Jinja To Kayunga To Kayunga To Jinja To Kayunga INUNDATED LAND EXISTING RIVER AREA NEW HIGH WATER LEVEL WHEN RESERVOIR IS FILLED PERMANENT FENCE LINE TRANSMISSION LINES PERMANENT ROADS PRIVATE POWER GENERATION (BUJAGALI) PROJECT Source: Bujagali Hydropower Social & Environmental Assessment (2006) UGANDA IBRD 35424 APRIL 2007 EXISTING HYDRO POWER STATIONS PLANNED HYDRO POWER STATIONS DIESEL POWER STATIONS 132kV LINES 66kV LINES 33kV LINES MAIN CITIES NATIONAL CAPITAL RIVERS INTERNATIONAL BOUNDARIES This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries. 0 25 50 75 0 25 50 75 Miles 100 Kilometers 0 200 400 METERS UGANDA POWER SECTOR DEVELOPMENT OPERATION

Transcript of PRIVATE POWER GENERATION (BUJAGALI) PROJECT · Maziba 1 MW Kisiizi 0.06 MW Paidha 3.5 MW Waki 6 MW...

Page 1: PRIVATE POWER GENERATION (BUJAGALI) PROJECT · Maziba 1 MW Kisiizi 0.06 MW Paidha 3.5 MW Waki 6 MW Buseruka 9 MW Ishasha 5.5 MW Mobuku I, II & III 28 MW Proposed Bujagali 250 MW Kikagati

Maziba1 MW

Kisiizi0.06 MW

Paidha3.5 MW

Waki6 MWBuseruka

9 MW

Ishasha5.5 MW

Mobuku I, II & III28 MW

ProposedBujagali250 MW

Kikagati10 MW

Nalubaale& Kiira

180 MW200 MW

KAMPALAKAMPALA

KilakKilak

OyamOyam

DokoloDokolo

BusikiBusiki

BulisaBulisa

AbimAbim

IshakaIshaka

IbandaIbanda RushereRushere

NkougeNkouge

KabulasokeKabulasoke

NtungamoNtungamo

HoimaHoima

IgangaIganga

BusiaBusia

SironkoSironko

BugiriBugiri

KabaleKabale

KamuliKamuliKaliroKaliro ButalejaButaleja

KayungaKayunga

KapchorwaKapchorwa

BukwoBukwo

NkendaNkenda

KisoroKisoro

KatunaKatuna

KitgumKitgum

KumiKumi

LiraLira

KawandaKawanda

NakasongolaNakasongola

MasakaMasaka

BukobaBukoba

KalangalaKalangala

EntebbeEntebbe

MasindiMasindi

MbararaMbarara

MorotoMoroto

NakapiripiritiNakapiripiritiKatakwiKatakwiAmuriaAmuria

MoyoMoyo

KakumiroKakumiro BukumiBukumi

PallisaPallisa

SorotiSoroti

FortFortPortalPortal

AruaArua

JinjaJinja

MbaleMbale

BubuloBubulo

TororoTororo

GuluGulu

NebbiNebbi

ApacApac

AmolatarAmolatar

MubendeMubende

RukungiriRukungiri

IsingiroIsingiro RakaiRakai

MpigiMpigi MukonoMukono

MityanaMityana

KibogaKiboga

KotidoKotido

KaabongKaabong

AdjumaniAdjumaniYumbeYumbe

KobokoKoboko

Ishaka

Ibanda Rushere

Nkouge

Kabulasoke

Ntungamo

Hoima

Iganga

Busia

Sironko

Bugiri

Kabale

KamuliKaliro Butaleja

Kayunga

Kapchorwa

Bukwo

Nkenda

Kisoro

Katuna

Kitgum

Kumi

Lira

Kawanda

Nakasongola

Masaka

Bukoba

Kalangala

Entebbe

Masindi

Mbarara

Moroto

NakapiripiritiKatakwiAmuria

Moyo

Kakumiro Bukumi

Pallisa

Soroti

FortPortal

Arua

Jinja

Mbale

Bubulo

Tororo

Gulu

Nebbi

Apac

Amolatar

Mubende

Rukungiri

Isingiro Rakai

Mpigi Mukono

Mityana

Kiboga

Kotido

Kaabong

AdjumaniYumbe

Koboko

Kilak

Oyam

Dokolo

Busiki

Bulisa

Abim

KAMPALA

DEM. REP.OF CONGO

S U D A N

K E N Y A

K E N Y A

TANZANIATANZANIARWANDA

Lake Vic tor ia

LakeEdward

LakeGeorge

LakeKwania

Lake Kyoga

LakeSalisbury Lake

Opeta

Lake

Albe

rt

Ora

Alb

ert

Nile

Achwa

Victoria Nile

Oko

k

Locho

man

Siti

Nkusi

Kafu

Katonga

30°E

4°N

2°N

2°N

32°E 34°E

32°E 34°E KAW

AN

DA

-BU

JAG

ALI

KAW

AN

DA

-BU

JAG

ALI

LINE

(2X

132-

220k

V)

LINE

(2X

132-

220k

V)

KAW

AN

DA

-BU

JAG

ALI

LINE

(2X

132-

220k

V)

BUJAGALI-NALUBAALE LINE (2X 132kV)

BUJAGALI-TORORO LINE (2X 132kV)

MAIN HIGHWAY

SUBSTATIONSUBSTATIONSUBSTATION

POWERHOUSEPOWERHOUSE

EXISTINGEXISTINGSITE ROADSITE ROAD

POWERHOUSEPOWERHOUSEACCESS ROADACCESS ROAD

WORKSHOPWORKSHOP& STORE& STORE

MAIN GATEDMAIN GATEDSPILLWAYSPILLWAY

SIPHONSIPHONSPILLWAYSPILLWAY

EMBANKMENTEMBANKMENTDAMDAM

POWERHOUSE

EXISTINGSITE ROAD

POWERHOUSEACCESS ROAD

WORKSHOP& STORE

MAIN GATEDSPILLWAY

SIPHONSPILLWAY

EMBANKMENTDAM

DUMBBELLISLAND

Nile River

To JinjaTo Jinja

To KayungaTo Kayunga

To Jinja

To Kayunga

INUNDATED LAND

EXISTING RIVER AREA

NEW HIGH WATER LEVELWHEN RESERVOIR IS FILLED

PERMANENT FENCE LINE

TRANSMISSION LINES

PERMANENT ROADS

PRIVATE POWERGENERATION (BUJAGALI) PROJECT

Source: Bujagali Hydropower Social & Environmental Assessment (2006)

UGANDA

IBRD 35424

APRIL 2007

EXISTING HYDRO POWER STATIONS

PLANNED HYDRO POWER STATIONS

DIESEL POWER STATIONS

132kV LINES

66kV LINES

33kV LINES

MAIN CITIES

NATIONAL CAPITAL

RIVERS

INTERNATIONAL BOUNDARIES

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.

0 25 50 75

0 25 50 75 Miles

100 Kilometers

0 200 400

METERS

UGANDAPOWER SECTOR

DEVELOPMENT OPERATION