Toelichting Europese ERTMS proces Maarten Bartholomeus ERTMS system specification & harmonization in The Netherlands ProRail/Infra Management/Treinbeveiliging ERTMS systeem management [email protected] Infra management, ERTMS system management

Transcript of Toelichting Europese ERTMS proces ERTMS system ...

Toelichting Europese ERTMS proces

Maarten Bartholomeus

ERTMS system specification &harmonization in The NetherlandsMaarten Bartholomeus

ProRail/Infra Management/Treinbeveiliging

ERTMS systeem management

harmonization in The [email protected]

Infra management, ERTMS system management

Agenda

� ERTMS projects

� Lessons Learned

� Specification Signaling� Specification Signaling

� Examples Specification

� Conclusion

HSL Zuid2009, level 2 (Level1), Highspeed , Siemens

ERTMS projects in The Netherlands

Betuweroute (part of Corridor A)2008, level 2 + 1, Cargo, Alstom

Lw

Hr

Emn

Asn

Gn

Hdr Stv

Sk

Hlg

Swd

Rd

Dz

Nsch

Mp

/ 3

Hanzelijn2013, ATB / Level 2 overlay, conv. , Alstom

Amsterdam - Utrecht 2009, ATB / Level 2 overlay, conv. , Bombardier

2009, level 2 (Level1), Highspeed , Siemens

STM-STM transities2008-2009, STM-STM, Alstom/Bombardier

Zl

EkzHn

Dv

Amr

SptnHlm

Gvc

Zvt

Gv

Amf

Ut

Ed

Gd

Rtd

Ht

TbRsd

Ehv

Gs BgnVs

Hm

Wt

Vl

Rm

Std

Mt

Hrl

Nm

Ah

Apd

Zp

Aml

Brn

Odz

Hgl

Es

Kpn Mrb

Rhn Zv

Dtc

Ww

Dld

Tl

WdBkl

Hwd

PmrUtg

Zd

Sdm

Hld

Br

KrdSog

Gr

Hd

Dvd

Btl

Zlw

Lls

AsdAsdm

Bd

Est

Rai

Ledn

Apn

Rtkw

Hvs

Ddr

Rth

Shl

Gdm

ERTMS Objectives / current results� Interoperability

• Operational differences• Start of Mission (SR) - TAF - FS / (SR) - OS- FS• Cabsignalling vs outside signals (overlay principles)• Transitions ATB → L2, ATB → L1 → L2 , ATB→L2/ATB• Shunting, maintenance trains (Level0, SH, UN, STM)• Shunting, maintenance trains (Level0, SH, UN, STM)• Performance (blocks length, use service brake, NV, ..)

• Train – track / testing• Train – track specific testing• Different versions

� Efficiency• Maintenance concepts differ• Supplier dependent solutions

Lessons Learned

� System options/differences• Establish a system specification• Integrated interlocking and RBC requirements• Define engineering rules• Define engineering rules

� Operational differences• Identify overall processes & stakeholders• Describe overall user processes

� Efficiency• Start specification within project• Tender with cost models, SFA, ..

Specification S ignaling (SPES)

� Harmonized specification• Best Practices former projects• To be used in new signaling projects

Specification Signaling

� Life cycle approach• Tendering• Design• Build• Test• Maintain

tim

e

completeness

tim

e

completeness

SPES document structure

ContextSPES

Dispatch

System (VPT)

JR

MSMaintenance

System

external

MDSMonitoring &

Diagnostics System

E_MDS

E_VPT

Adaptor

DispatcherAnalyst Maintenance

operator

trackside

worker

E_VPT

E_Operator

SPES

Power E_Power

LEU

IXL RBC

adjacent

IXL

ETCS

Train

HHT/LCP E_TW

TTI

JRJuridical

Recorder

OCObject Control

E_AI

Train

DriverE_ETCS

E_TTI

E_point E_signalE_track

segmentE_ATP

SPES

pointSignal /

ATB-VV

Track

segmentATP

E_BaliseSRS v230d

SPES structure

Example: User process scenario’s

� Actors / Users• Driver, • Dispatcher• Maintenance Operator, ..

� System� System• All systems as one: Train, track

� Goals/Purpose: • User involvement • Operator manuals, Training, • Safety analyses,• Test scenario’s

User process description (example: Start Of Mission)

Trein rijdt op zicht Trein rijdt volledig technisch beveiligd

Opgestelde trein,positie bekend

Normaal ingestelde rijweg

2312

2224

2203 GP1

User proces (diagram)

Machinist Systeem

3Sein uit stand stop

Treindienstleider

2Opdracht om een

normale rijweg in te stellen

Inkomen rijweg

De machinist schakelt de stuurstroom in

1

Start

6

Sein uit stand stop

4

Inkomen rijweg

7

5

Voorstel rijden op zicht

Bevestiging voorstel

9

8Omschakeling naar rijden op zicht

Rijautorisatie voor ingestelde rijweg beschikbaar.

User proces (example3)

SPES specification requirements

� Requirements: unique/traceable/testable

� Requirements database….

� Example:Req. Id. Requirement Source Original Id.

MA at Start of Route

245 When the train is in mode SR OR the train is in mode SB or PT AND “’start” is

selected, the RBC shall give an MA to a train with OS authorization until the next

signal if: • The next signal is cleared

AND • The train has a valid position

[Uitg L2] 5.021

246 When the train is in mode SB or PT AND “’start” is selected,

the RBC shall give SR authorization to a train if no MA can be issued.

[Uitg L2] 5.022

Engineering ERTMS

� Unified engineering rules• Supplier independent• Support design process• Balance safety and performance• Maintenance aspects• Maintenance aspects

� Examples:• Start of Mission• Balise position rules• Gradient segment optimization • Transitions STM ATB -> Level2 vs• Integrated track design database• …

Status

� (Inter)Operability• Unified Overlay principles• Agreed functional system behavior

� Train – track / testing• ERTMS functions/options limited (less testing)• ERTMS functions/options limited (less testing)• BTI effort coordinated by Inframanager

� Efficiency• Unified ERTMS engineering rules• RAMS,V&V en SFA in contract

� Supplier/project independent

SPES relations

� INESS• Interlocking requirements where used for SPES• Participation in several INESS workgroups

� Operational Harmonization• User process description used in Corridor workgroups• User process description used in Corridor workgroups• Harmonization issue’s for TSI OPE

� Workgroups engineering rules• EIGG WG• ERA engineering workgroup

� TSI CCS (ERTMS Specification)• CR’s (transition, gradients, OS/SR, ..)• Subset-76 (test scenario’s)

Buying, engineering and testing ERTMS systems