API SPEC Q2 FOR AUDITING STANDARDIZATION OF INDUSTRY EXPECTATIONS FOR OIL AND GAS Stacey W. Hagen ExxonMobil Development Company Drilling Services & Systems Team Lead API Sub-Committee 18 Chairman - Quality Bo Creek Orion Drilling Company Quality Assurance / Quality Control Manager

Transcript of Hs14 s-hagen

Page 1: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

STANDARDIZATION OF INDUSTRY EXPECTATIONS FOR OIL AND GAS

Stacey W. Hagen ExxonMobil Development Company Drilling Services & Systems Team Lead API Sub-Committee 18 Chairman - Quality

Bo Creek Orion Drilling Company Quality Assurance / Quality Control Manager

Page 2: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

AGENDA

Objective – Provide History and Industry Expectations on API Q2

Outline – Brief History of API – Business Drivers for New Industry Standard – API Q2 – API Q2 Overview – Benefits

Page 3: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

BRIEF HISTORY API SPEC Q1

Page 4: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

History of API and Spec Q1 • July 28, 1914 – November 11, 1918 • National Petroleum War Services Committee • Pooling Program • 1919 – American Petroleum Institute • Program was transitioned into a third party audit

program in the mid 1980’s under the Specification of Quality Programs, API Spec Q1 that is now in its 9th Edition

• Just as there were drivers for the Monogram Program, one now exists for the certification of services

Page 5: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

BUSINESS DRIVERS FOR API SPEC Q2

Page 6: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Absence of a Corporate Management System

Inconsistency in Risk Mitigation

Lack of Implementation

Lack of Oversight

BUSINESS DRIVERS

Page 7: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

BUSINESS DRIVERS

Increasing complexity of wells • Need for improved service technology and

equipment / tool reliability Increasing spread rates on rigs • Need for systems to ensure uninterrupted

operations

Page 8: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

BUSINESS DRIVERS

Service centers have more than one customer • Additional requirements typically

specified by one or two customers • A customer may only be 10% of total

business • Implementation / compliance of

requirements only 10% of the time is next to impossible

Page 9: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

BUSINESS DRIVERS - Perception The incident killed 11 workers and spewed more than 200 million gallons of crude in what is touted as the country’s worst oil spill ever. Subsequently, a moratorium was imposed on offshore drilling.

Page 10: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

ROOT CAUSES OF NPT LACK OF:

Service execution planning

Personnel Competency

Lack of or not Following

procedures

Lack of using history logs

Contingency planning

Quality Checks, Inspection and Test

Preventive Maintenance, Inspection, Test Programs (PMITP)

Page 11: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

INDUSTRY RESPONSE

Page 12: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

INDUSTRY RESPONSE

• Realization that ISO 9001 , ISO TS29001 and API Spec Q1 apply to manufacturing

• API Task Group (TG) 5 developed under API SC18

• Specification for QMS Requirements for Service Supply Organizations

• Identify the expectations for execution of upstream services including well construction, intervention, production and abandonment

• Published December 15, 2011

Page 13: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

API SUBCOMMITTEE 18

Life Cycle Management

API Spec Q2

API Spec Q1

Auditor Effectiveness

Min. Mfg. Requirements

Welding Monogram Program

TG2 TG1 TG3 TG4 TG5 TG6 TG7

SC18

CSOEM

Page 14: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

API TG5 MEMBERS

Page 15: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

API SPEC Q2 HOW IS IT DIFFERENT?

Page 16: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

PROCESS-BASED QMS (ISO 9001, 29001 & API Q1)

Page 17: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

CUSTOMER REQUIREMENTS CUSTOMER

SATISFACTION

INPUT OUTPUT

CONTINUAL IMPROVEMENT

PROCESS- AND RISK-BASED QMS (API Q2)

Page 18: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

OVERLAP - API SPEC Q1 VS. API SPEC Q2

General Requirements

Quality Manual

Control of Documents & Records

Quality Policy

Quality Objectives

Planning

Management Review

Control of Monitoring and Measurement Equipment

Measurement, Analysis and Improvement

Training

Corrective and Preventive Action

Page 19: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

SERVICE-SPECIFIC Additions - API SPEC Q2

No Claims to Exclusions

Competency of Personnel

Risk Management

Detection Equipment

Service Design

Contingency Planning

Control over Critical Suppliers

Service Quality Plan

Preventive Maintenance, Inspection and Test

Service Performance Validation

Management of Change

Corrective and Preventive Action resulting in a change of controls

Customer Notification

Traceability of Critical Services and SRP

Page 20: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Elements Requiring Procedures

• Personnel Competency / Training • Document Control • Control of Records • Risk Assessment • Service Design • Contingency Planning • Purchasing • Verification of Purchased Services &Service

Related Product • Execution of Service • Identification & Traceability • Service Related Product Status

• Customer Property • Preservation of Service Related Product • PMIT • TMMDE • Service Performance Validation • Nonconformities • Management of Change • Monitoring, Measuring & Improvement • Internal Audit • Analysis of Data • Improvement • Corrective Action • Preventative Action

Page 21: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

1.2 EXCLUSIONS “When an organization performs activities addressed by this document, including the provision of service-related product, all requirements shall be performed and no claims to exclusion of those requirements shall be permitted.” Service-related products (SRP): Materials, equipment, and software used in the execution of a service.

Page 22: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

COMPETENT

4.3.2 PERSONNEL COMPETENCE

NEW • Risk Based • Problem Solving

Competency = • Education • Training • Skills (OJT) • Experience

Page 23: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

4.3.2 PERSONNEL COMPETENCE THE FOUR LEVELS OF LEARNING

Novice

Not expected to be able to perform

Competent

Expected to perform to

basic standards

Expert

Creates knowledge

and teaches others

Experienced

Beyond understanding of what must

be done

Page 24: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.3 RISKS Management

Immediately

1 years 5 years

10 years

Page 25: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.3 RISK MANAGEMENT

Maintain Procedures to controls Risk throughout Service Execution • Identify service related risk • Implement controls • Notify customer of remaining risk

Page 26: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.4 Design & Development

Every Service includes Design and Development

Planning Inputs Outputs Review Verification Changes API Q1 Products

Validation

Planning Inputs Outputs Verification Changes API Q2 Services

Final Review

Failing to understand what is and is not critical will impact the service design which will result in increased risks, lack of controls and potential for loss.

Page 27: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.5 CONTINGENCY PLAN

Contingency planning shall be integrated into services and supporting processes between the organization, its suppliers and the customer”.

Page 28: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.5 CONTINGENCY PLAN

• Actions required for significant risk

• Assignment of responsibility & authority

• Internal and external communications

Outputs

Integration

Disruption Prevention

Mitigation Measures

Spares

History Risk

Reliability

Contingency Planning

Page 29: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.6 PURCHASING & CONTROL OF SUPPLIERS

• Determine criticality of the services and SRP

• Evaluation & Onsite audits for critical suppliers.

Critical – That deemed by the organization or customer as indispensable or essential, needed for a stated purpose or task, and requiring specific action

Page 30: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.7.2 SERVICE QUALITY PLAN

Customer Specific for the Service being performed Takes into account Environmental & Operational Conditions

Design and

Development

Personnel

Competence

Contract Requirements Identification of

Equipment

Risk Assessment

Contingency Planning

Page 31: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.7.3 IDENTIFICATION AND TRACEABILITY

• Identification controls must be put into place to clearly identify all stages of delivery, installation, repair (maintenance), and redress

• Service-related product shall be identified.

• Critical service-related product shall be identified and traceable.

Page 32: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.7.8 PMITP Is applicable to Service Related Product (SRP)

Equipment Maintenance is handled under Work Environment.

Corrective Preventive

Predictive • Expensive

• Results in NPT

• Minimizes Corrective Maintenance

• Focus of API Spec Q2

• SRP Integrity and Reliability

Page 33: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.7.8 PMITP

Corrective Preventive

Predictive • Expensive

• Results in NPT

• Minimizes Corrective Maintenance

• Focus of API Spec Q2

• SRO Integrity and Reliability

• Reports that document history use, repairs, modifications, remanufacturing, inspection and test activities that all direct verification for reuse of product;

• List of critical spare parts requirements by the customer and/or technical requirements including those by the OEM

• Controls that ensure equipment integrity to original performance requirements and design acceptance criteria are maintained

• Original performance requirements that cannot be met shall undergo the MOC process

Page 34: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.7.8 PMITP

• OEM • Application, use, environments • PMIT = OEM Recommendations + Owner

of the equipment

Page 35: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.9 SERVICE PERFORMANCE VALIDATION

Validation must be:

• Differs from Validation for manufactured product

• Validations occur during and after execution of service(s)

• Carried out in accordance with Design (5.4), SQP (5.7.2) and acceptance criteria

Page 36: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

5.10.4 CUSTOMER NOTIFICATION

• Customers shall be notified:

– When service execution, does not conform to requirements

– When SRP does not conform which has been delivered or used in the execution of a service

Page 37: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Management of Change

Process Execution Changes

Management System

Changes

SRP & Design Changes

Risk Assessment

Customer Notification

No

Yes

No

Customer Accepts?

Higher Risk? End of Process

End of Process

Change in Personnel &

Suppliers

Yes

5.11 Management of Change

Page 38: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Impact on Drilling Operations

Reso

urce

s

-90+ 0 40 10 20 160+ 80

Risk Assessment

Drilling Operations

Design of Service

PM Programs

Contingency Planning

Maintenance & Critical Spares

• Assembly Insp / Test

QA/QC

• Service Performance Validation

•BHA Inspections

•MOC

Critical Suppliers

Time ( rig days) (AFE) Spud

Operations Support

• Well Integrity Reduction of NPT

Contractor Influence

API S

pec

Q2

• Tool Insp @ delivery

Competency

Service Quality Plans

Page 39: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

SUMMARY & BENEFITS

Page 40: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

INDUSTRY IMPACT

Operators Service Providers

Suppliers Regulators and other Interested

Parties

Page 41: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

It is not a template that you fill in and claim

compliance.

It is not a cross

reference between your management system and your customer’s.

It is not a manual with new buzz words that you present to your

customers.

WHAT API SPEC Q2 IS NOT

Page 42: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

It is about service quality and risk mitigation supported by validation and actual service provider performance.

WHAT API SPEC Q2 IS

Page 43: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Benefits of Standardization

• Improves service related product reliability

• Minimizes risk through identification, planning & controls

• Identifies critical tasks that impact quality, safety and the environment

• Minimizes service related risk and improves efficiencies

• Improves communication between service providers and their suppliers and operators.

Page 44: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

INDUSTRY COLLABORATION

Page 45: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Industry Collaboration Beta Test Site Assessments: • Gaps, hurdles and milestones for auditing to Q2 • Identify competencies / training for API Staff / Auditors • Identify needed resources • Types of certifications needed to meet industry needs

• Baker - Completed • Schlumberger – Completed • Weatherford – Completed • Halliburton – Completed • Orion Drilling – Completed

Page 46: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Industry Collaboration

API Spec Q2 Mock Audit: • Halliburton – Bakersfield, CA • July 29th – August 2nd 2013 PSL Covered • Drilling Fluids & Solids • Cementing • Completion Tools • Production Enhancement • Directional Drilling / MWD / LWD • Wireline and Perforating

Page 47: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

Industry Collaboration API Spec Q2 Reviews: •Orion Drilling •Maersk Drilling •Akita Drilling •Parker Drilling •Transocean •MI Swaco

Page 48: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

EVOLUTION OF API SPEC Q2

DEVELOPED PUBLISHED BETA TESTING COMPLIANCE CERTIFICATION

API Spec Q2 was developed in 2010

through 2011.

API Spec Q2 was published in

December 2011.

A combination of operators and service providers participated

in the beta test.

Service providers start getting their

QMSs in compliance with API Spec Q2.

Service providers become certified in

API Spec Q2.

EXPECTATION

Service providers shall be in compliance in order to bid on jobs

requiring API Spec Q2.

Page 49: Hs14 s-hagen

API SPEC Q2 FOR AUDITING

QUESTIONS ?