SATKER DIREKTORAT PENGEMBANGAN KAWASAN …kotaku.pu.go.id/files/Media/Laporan/Contract...

32
Nomor & Periode Invoice : No. 10 Periode (Maret s/d April 2020) Realisasi Invoice : 28 Juli 2020 Nomor Loan : Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID, : NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN Nama Konsultan : PT. Kogas Driyap Konsultan Paket Pekerjaan : TECHNICAL MANAGEMENT CONSULTANT (TMC) PACKAGE - 6 Nomor & Tanggal Kontrak : HK.02.03/TMC-6/IBRD & AIIB/SATKER-PKPBM/25/2018, Tanggal 18 Desember 2018 Periode Kontrak : 18 Desember 2018 sd 17 Desember 2020 I. REMUNERASI 27,615,500,000 11,247,955,387 997,900,000 12,245,855,387 15,369,644,613 1.1. PROFESIONAL STAFF 24,857,000,000 10,144,684,767 824,900,000 10,969,584,767 13,887,415,233 1.2. SUPPORTING STAFF 2,758,500,000 1,103,270,620 173,000,000 1,276,270,620 1,482,229,380 II. DIRECT REIMBURSABLE COST 12,335,450,000 2,866,557,959 161,129,734 3,027,687,693 9,307,762,307 2.1. MOBILIZATION / DEMOBILIZATION 324,200,000 3,966,940 0 3,966,940 320,233,060 2.2. HOUSING ALLOWANCE 482,250,000 107,280,815 24,750,000 132,030,815 350,219,185 2.3. DUTY TRAVEL EXPENSES 1,426,170,000 229,608,981 41,758,000 271,366,981 1,154,803,019 A. SOUTH SULAWESI PROVINCE 248,450,000 71,638,615 0 71,638,615 176,811,385 B. NORTH SULAWESI PROVINCE 92,200,000 21,807,400 2,272,000 24,079,400 68,120,600 C. CENTRAL SULAWESI PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300 D. GORONTALO PROVINCE 93,000,000 11,683,200 300,000 11,983,200 81,016,800 E. SOUTH EAST SULAWESI PROVINCE 132,520,000 28,000,666 2,794,300 30,794,966 101,725,034 F. MALUKU PROVINCE 217,500,000 20,455,100 17,492,200 37,947,300 179,552,700 G. NORTH MALUKU PROVINCE 114,300,000 17,525,900 2,429,500 19,955,400 94,344,600 H. PAPUA PROVINCE 138,000,000 15,800,000 9,823,700 25,623,700 112,376,300 I. WEST PAPUA PROVINCE 145,200,000 30,798,400 6,646,300 37,444,700 107,755,300 2.4. OFFICE OPERATIONAL EXPENSES 1,050,000,000 158,506,223 94,621,734 253,127,957 796,872,043 2.5. OFFICE EQUIPMENT EXPENSES 592,700,000 447,500,000 0 447,500,000 145,200,000 2.6. RENTAL EXPENSES 5,880,470,000 1,884,040,000 0 1,884,040,000 3,996,430,000 2.7. REPORT EXPENSES 182,035,000 29,655,000 0 29,655,000 152,380,000 2.8. SURVEY EXPENSES 2,397,625,000 6,000,000 0 6,000,000 2,391,625,000 III. COORDINATION MEETING AT PROVINCE 133,300,000 28,000,000 10,400,000 38,400,000 94,900,000 3.1. WITH CITY TEAM 133,300,000 28,000,000 10,400,000 38,400,000 94,900,000 IV. TOTAL [I + II + III ] 40,084,250,000 14,142,513,346 1,169,429,734 15,311,943,080 24,772,306,920 V. TAX 10% 4,008,425,000 1,414,251,335 116,942,973 1,531,194,308 2,477,230,692 VI. GRAND TOTAL 44,092,675,000 15,556,764,681 1,286,372,707 16,843,137,388 27,249,537,612 VII. ADVANCE PAYMENT 2,602,189,500 2,602,189,500 0 2,602,189,500 0 VIII. REPAYMENT ADVANCE PAYMENT 2,602,189,500 1,517,943,878 216,849,126 1,734,793,004 867,396,496 IX. TOTAL INVOICE 44,092,675,000 15,226,758,968 952,580,608 16,179,339,576 27,913,335,424 NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2019 KOTA TANPA KUMUH "KOTAKU" SATKER DIREKTORAT PENGEMBANGAN KAWASAN PERMUKIMAN (PKP) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT NO KOMPOSISI BIAYA CONTRACT AMANDEMENT -02 SSIA KONTRAK INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Transcript of SATKER DIREKTORAT PENGEMBANGAN KAWASAN …kotaku.pu.go.id/files/Media/Laporan/Contract...

  • Nomor & Periode Invoice : No. 10 Periode (Maret s/d April 2020)

    Realisasi Invoice : 28 Juli 2020

    Nomor Loan : Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID,

    : NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN

    Nama Konsultan : PT. Kogas Driyap Konsultan

    Paket Pekerjaan : TECHNICAL MANAGEMENT CONSULTANT (TMC) PACKAGE - 6

    Nomor & Tanggal Kontrak : HK.02.03/TMC-6/IBRD & AIIB/SATKER-PKPBM/25/2018, Tanggal 18 Desember 2018

    Periode Kontrak : 18 Desember 2018 sd 17 Desember 2020

    I. REMUNERASI 27,615,500,000 11,247,955,387 997,900,000 12,245,855,387 15,369,644,613

    1.1. PROFESIONAL STAFF 24,857,000,000 10,144,684,767 824,900,000 10,969,584,767 13,887,415,233

    1.2. SUPPORTING STAFF 2,758,500,000 1,103,270,620 173,000,000 1,276,270,620 1,482,229,380

    II. DIRECT REIMBURSABLE COST 12,335,450,000 2,866,557,959 161,129,734 3,027,687,693 9,307,762,307

    2.1. MOBILIZATION / DEMOBILIZATION 324,200,000 3,966,940 0 3,966,940 320,233,060

    2.2. HOUSING ALLOWANCE 482,250,000 107,280,815 24,750,000 132,030,815 350,219,185

    2.3. DUTY TRAVEL EXPENSES 1,426,170,000 229,608,981 41,758,000 271,366,981 1,154,803,019

    A. SOUTH SULAWESI PROVINCE 248,450,000 71,638,615 0 71,638,615 176,811,385

    B. NORTH SULAWESI PROVINCE 92,200,000 21,807,400 2,272,000 24,079,400 68,120,600

    C. CENTRAL SULAWESI PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300

    D. GORONTALO PROVINCE 93,000,000 11,683,200 300,000 11,983,200 81,016,800

    E. SOUTH EAST SULAWESI PROVINCE 132,520,000 28,000,666 2,794,300 30,794,966 101,725,034

    F. MALUKU PROVINCE 217,500,000 20,455,100 17,492,200 37,947,300 179,552,700

    G. NORTH MALUKU PROVINCE 114,300,000 17,525,900 2,429,500 19,955,400 94,344,600

    H. PAPUA PROVINCE 138,000,000 15,800,000 9,823,700 25,623,700 112,376,300

    I. WEST PAPUA PROVINCE 145,200,000 30,798,400 6,646,300 37,444,700 107,755,300

    2.4. OFFICE OPERATIONAL EXPENSES 1,050,000,000 158,506,223 94,621,734 253,127,957 796,872,043

    2.5. OFFICE EQUIPMENT EXPENSES 592,700,000 447,500,000 0 447,500,000 145,200,000

    2.6. RENTAL EXPENSES 5,880,470,000 1,884,040,000 0 1,884,040,000 3,996,430,000

    2.7. REPORT EXPENSES 182,035,000 29,655,000 0 29,655,000 152,380,000

    2.8. SURVEY EXPENSES 2,397,625,000 6,000,000 0 6,000,000 2,391,625,000

    III. COORDINATION MEETING AT PROVINCE 133,300,000 28,000,000 10,400,000 38,400,000 94,900,000

    3.1. WITH CITY TEAM 133,300,000 28,000,000 10,400,000 38,400,000 94,900,000

    IV. TOTAL [I + II + III ] 40,084,250,000 14,142,513,346 1,169,429,734 15,311,943,080 24,772,306,920

    V. TAX 10% 4,008,425,000 1,414,251,335 116,942,973 1,531,194,308 2,477,230,692

    VI. GRAND TOTAL 44,092,675,000 15,556,764,681 1,286,372,707 16,843,137,388 27,249,537,612

    VII. ADVANCE PAYMENT 2,602,189,500 2,602,189,500 0 2,602,189,500 0

    VIII. REPAYMENT ADVANCE PAYMENT 2,602,189,500 1,517,943,878 216,849,126 1,734,793,004 867,396,496

    IX. TOTAL INVOICE 44,092,675,000 15,226,758,968 952,580,608 16,179,339,576 27,913,335,424

    NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2019

    KOTA TANPA KUMUH "KOTAKU"

    SATKER DIREKTORAT PENGEMBANGAN KAWASAN PERMUKIMAN (PKP)

    KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

    NO KOMPOSISI BIAYACONTRACT

    AMANDEMENT -02SSIA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • I. REMUNERASI

    NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    1.1. PROFESIONAL STAFF 24,857,000,000 10,144,684,767 824,900,000 10,969,584,767 13,887,415,233

    A. REGIONAL LEVEL 2,380,000,000 1,230,748,485 172,000,000 1,402,748,485 977,251,515

    Province South Sulawesi (Makassar) - Regional Level

    A-1 Andi Amar Team Leader 24.00 29,000,000 696,000,000 14.35 416,150,000 2.00 29,000,000 58,000,000 16.35 474,150,000 7.65 221,850,000

    A-2 Yeni Iriani Infrastructure Specialist 20.00 25,000,000 500,000,000 8.21 205,340,909 0.00 25,000,000 0 8.21 205,340,909 11.79 294,659,091

    A-3 Andi Bachtiar Dharma Architect 24.00 25,000,000 600,000,000 13.77 344,318,182 2.00 25,000,000 50,000,000 15.77 394,318,182 8.23 205,681,818

    A-4 Sitti / Luciana Apriani Safeguard Specialist 22.00 20,000,000 440,000,000 12.65 252,939,394 2.00 20,000,000 40,000,000 14.65 292,939,394 7.35 147,060,606

    A-5 Tobe Name Additional Expert as Needed 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    A-6 Hasriana Team Assistant 12.00 12,000,000 144,000,000 1.00 12,000,000 2.00 12,000,000 24,000,000 3.00 36,000,000 9.00 108,000,000

    B. CITY LEVEL (14 Priority City) 6,730,000,000 3,525,924,926 508,000,000 4,033,924,926 2,696,075,074

    Civil Engineering

    B-1 Nusbih/Stevie Oike Manoppo Civil Engineering (Lead) Kota Manado 21.50 22,000,000 473,000,000 11.21 246,576,441 0.00 22,000,000 0 11.21 246,576,441 10.29 226,423,559

    B-2 Andi Sikki Civil Engineering (Lead) Kota Gorontalo 23.50 22,000,000 517,000,000 13.77 302,923,077 2.00 22,000,000 44,000,000 15.77 346,923,077 7.73 170,076,923

    B-3 Moh. Arief Civil Engineering (Lead) Kota Palu 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    B-4 Andi Amran / Nur Senab Civil Engineering (Lead) Kota Makasar 18.00 22,000,000 396,000,000 9.14 201,000,000 0.00 22,000,000 0 9.14 201,000,000 8.86 195,000,000

    B-5 Asia Sabarudin Civil Engineering (Lead) Kabupten Gowa 23.50 22,000,000 517,000,000 13.12 288,538,462 2.00 22,000,000 44,000,000 15.12 332,538,462 8.38 184,461,538

    B-6 Rahmi Habir Civil Engineering (Lead) Kota Palopo 23.50 22,000,000 517,000,000 13.23 291,000,000 2.00 22,000,000 44,000,000 15.23 335,000,000 8.27 182,000,000

    B-7 Ulfa Tajudin Civil Engineering (Lead) Kota Pare-Pare 23.50 22,000,000 517,000,000 13.77 303,000,000 2.00 22,000,000 44,000,000 15.77 347,000,000 7.73 170,000,000

    B-8 Adiputera Civil Engineering (Lead) Kota Kendari 23.50 22,000,000 517,000,000 13.77 303,000,000 2.00 22,000,000 44,000,000 15.77 347,000,000 7.73 170,000,000

    B-9 Muhammad Saleh Civil Engineering (Lead) Kabupaten Kolaka 23.50 22,000,000 517,000,000 13.73 302,076,923 2.00 22,000,000 44,000,000 15.73 346,076,923 7.77 170,923,077

    B-10 Arif Ali / Jacub A. / M. Tafri Civil Engineering (Lead) Kota Tual 22.00 22,000,000 484,000,000 7.14 157,000,000 2.00 22,000,000 44,000,000 9.14 201,000,000 12.86 283,000,000

    B-11 Marzuki / Jembris Salawane Civil Engineering (Lead) Kota Ambon 22.00 25,000,000 550,000,000 9.12 227,884,615 2.00 25,000,000 50,000,000 11.12 277,884,615 10.88 272,115,385

    B-12 Aidin Jafar Civil Engineering (Lead) Kota Ternate 22.00 25,000,000 550,000,000 11.50 287,500,000 2.00 25,000,000 50,000,000 13.50 337,500,000 8.50 212,500,000

    B-13 Rahman Civil Engineering (Lead) Kota Sorong 23.50 25,000,000 587,500,000 13.23 330,681,818 2.00 25,000,000 50,000,000 15.23 380,681,818 8.27 206,818,182

    B-14 Baharuddin Civil Engineering (Lead) Kota Jayapura 23.50 25,000,000 587,500,000 11.39 284,743,590 2.00 25,000,000 50,000,000 13.39 334,743,590 10.11 252,756,410

    TEAM FOR CERC ACTIVITIES 8,037,000,000 3,284,200,000 0 3,284,200,000 4,752,800,000

    I. 4,281,000,000 3,284,200,000 0 3,284,200,000 996,800,000

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Karel Sri P Deputy Team Leader 5.00 25,000,000 125,000,000 5.00 125,000,000 0.00 25,000,000 0 5.00 125,000,000 0.00 0

    Ikwan syamsudin 14.00 25,000,000 350,000,000 0.00 0 0.00 25,000,000 0 0.00 0 14.00 350,000,000

    2 Washa Nasution / Procurement Specialist 2.63 22,000,000 57,933,333 2.63 57,933,333 0.00 22,000,000 0 2.63 57,933,333 0.00 0

    Teuku Lila Arga 15.37 22,000,000 338,066,667 0.00 22,000,000 0 0.00 0 15.37 338,066,667

    3 Dian Agus Widiarso Geologist 3.00 22,000,000 66,000,000 1.50 33,000,000 0.00 22,000,000 0 1.50 33,000,000 1.50 33,000,000

    4 Moh. Arief Civil Engineering - 1 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    5 Belyn Bimbo Petherson Civil Engineering - 2 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    6 Eko Setyo Nugroho Civil Engineering - 3 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    7 Suyono Suratman Civil Engineering - 4 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    8 Hartanto Civil Engineering - 5 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    9 Arifianto Civil Engineering - 6 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    10 Andri Civil Engineering - 7 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    11 Naharuddin Civil Engineering - 8 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    12 Naftali Pali Civil Engineering - 9 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    13 Dedi Civil Engineering - 10 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    14 Marwan B Nawer Civil Engineering - 11 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    16 Ramlan Civil Engineering - 13 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    17 Abd. Gafur Civil Engineering - 14 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    18 Bambang Setyono Civil Engineering - 15 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    19 Rachmat Saleh Architect - 1 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    20 Made Ardi Sasmita Architect - 2 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    21 Syamsul Darwis Architect - 3 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    22 Viqran Architect - 4 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    23 Anastiti Gita Rini Architect - 5 5.00 22,000,000 110,000,000 4.87 107,066,667 0.00 22,000,000 0 4.87 107,066,667 0.13 2,933,333

    24 Moh. Rachmat Syahrullah Architect - 6 5.00 22,000,000 110,000,000 4.87 107,066,667 0.00 22,000,000 0 4.87 107,066,667 0.13 2,933,333

    25 Ilham Halim Architect - 7 5.00 22,000,000 110,000,000 4.87 107,066,667 0.00 22,000,000 0 4.87 107,066,667 0.13 2,933,333

    26 Akbar Architect - 8 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    27 Sunardi Architect - 9 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI TENGAH

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    28 Budiarton Saada Environmental Specialist - 1 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    29 Warsidi Environmental Specialist - 2 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    30 Nasikhah Imamah Environmental Specialist - 3 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    31 Arif Riyadi Environmental Specialist - 4 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    32 Silviani Darwin Environmental Specialist - 5 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    33 Jaka Purwanta Environmental Specialist - 6 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    34 Arief Setianto MEP Specialist - 1 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    35 Muhamad Habibi MEP Specialist - 2 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    36 Agus Suprajitno MEP Specialist - 3 5.00 22,000,000 110,000,000 4.87 107,066,667 0.00 22,000,000 0 4.87 107,066,667 0.13 2,933,333

    37 Budi Sukoco MEP Specialist - 4 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    38 Dedi Nugroho MEP Specialist - 5 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    39 Luqman Assaffat MEP Specialist - 6 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    40 Mochamad Subchan Mauludin MEP Specialist - 7 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    41 Muh. Amin MEP Specialist - 8 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    42 Victor Anggita Pratama MEP Specialist - 9 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    43 Riyanto Ampulembang MEP Specialist - 10 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    44 Andi Purnomo MEP Specialist - 11 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    45 Hendri Sukma MEP Specialist - 12 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    46 Judi Sujanto Safeguard Specialist - 1 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    47 Indra Kurniawan Safeguard Specialist - 2 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    48 Edy Sulistyanto Safeguard Specialist - 3 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    49 Budhiarto Safeguard Assitant - 1 0.00 12,000,000 0 0.00 0 0.00 12,000,000 0 0.00 0 0.00 0

    50 Wisnu Safeguard Assitant - 2 0.00 12,000,000 0 0.00 0 0.00 12,000,000 0 0.00 0 0.00 0

    51 Ibnu Hamka Safeguard Assitant - 3 0.00 12,000,000 0 0.00 0 0.00 12,000,000 0 0.00 0 0.00 0

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Ali Abdullah Civil Engineering - 1 7.00 22,000,000 154,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 2.00 44,000,000

    2 Totok Haricahyono Civil Engineering - 2 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    3 Helmi Undju Civil Engineering - 3 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    4 Estiwo Kusumaningtyas Environmental Specialist - 1 7.00 22,000,000 154,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 2.00 44,000,000

    5 Soejanti Environmental Specialist - 2 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    6 Julistyorini Environmental Specialist - 3 5.00 22,000,000 110,000,000 5.00 110,000,000 0.00 22,000,000 0 5.00 110,000,000 0.00 0

    7 Rizal Ibra MEP Specialist - 1 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    8 Arif Utama MEP Specialist - 2 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    9 Sarifudin MEP Specialist - 3 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 804,000,000 0 0 0 804,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    1 Miranti Sani / Totok D.Kuryanto Koordinator 4.00 25,000,000 100,000,000 0.00 0 0.00 25,000,000 0 0.00 0 4.00 100,000,000

    2 Ansar Infrastructure Specialist 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Akbar Nooriyan Civil Engineering/Architect - 1 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    4 Agus Riyanto Civil Engineering/Architect - 2 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    5 Djazuli Hasyim MEP 0.00 22,000,000 0 0.00 0 0.00 22,000,000 0 0.00 0 0.00 0

    b. Planning for Rehabilitation of UNDATA Hospital (Phase 1b)

    1 Ahwar Infrastructure Specialist 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    2 Fahri Civil Engineering / Architect - 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Anhar Civil Engineering / Architect - 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    4 Ketut Julianto MEP - 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    5 To Be Name MEP - 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    c. Planning for Rehabilitation of ANUTAPURA Hospital (Phase 1b)

    1 Iswan Saba Infrastructure Specialist 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    2 Farid N. Pettajama Civil Engineering / Architect - 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Fandi Rahmat Civil Engineering / Architect - 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    4 Muhammad Rifat MEP - 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    5 To Be Name MEP - 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    III. 1,300,000,000 0 0 0 1,300,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO

    UNIVERSITY

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    1 Archie Ariando Coordinator 5.00 25,000,000 125,000,000 0.00 0 0.00 25,000,000 0 0.00 0 5.00 125,000,000

    2 Muh. Zulkarnain / Irwan Fajriar Infrastructure Specialist 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Okto Sofyan / Dion Madyananta Civil Engineering/Architect -1 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    4 Sonya Sonitha Civil Engineering/Architect -2 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    5 Sunardi Civil Engineering/Architect -3 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    6 Roni G. S. / Subagio Waluyo MEP 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 Irwan Fajriar Infrastructure Specialist - 1 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    2 Dion Madyananta Civil Engineering/Architect - 1 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Subagiyo Civil Engineering/Architect - 2 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    4 Anugerah Perdana Civil Engineering/Architect - 3 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    5 Subagio Waluyo MEP 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 Akhmad Dofir Infrastructure Spcialist 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    2 Atiek Untarti Civil Engineer/Architect - 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Harry Mufrizon Civil Engineer/Architect - 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    4 Dwianto Rasisto Civil Engineer/Architect - 3 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    5 Hendri Sukma MEP 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    d. Planning for Multifunction Building of Tadulako University

    1 Sony Hartaman Coordinator 3.00 25,000,000 75,000,000 0.00 0 0.00 25,000,000 0 0.00 0 3.00 75,000,000

    2 Tobe Name Structure Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Tobe Name Architecture Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    4 Tobe Name MEP Engineer 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    5 Tobe Name MEP Engineer 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    6 Tobe Name Quality Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    IV. PLANNING FOR CONSTRUCTION OF 1600 UNITS HUNTAP IN DUYU AND POMBEWE 182,000,000 0 0 0 182,000,000

    a. Planning for Construction of 1600 units Huntap in Duyu and Pombewe

    1 Evita Sekarsari Coordinator 2.00 25,000,000 50,000,000 0.00 0 0.00 25,000,000 0 0.00 0 2.00 50,000,000

    2 Taufik Hidayat L Civil Engineer/Architect - 1 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Lukas Kompos MEP 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    4 Joko Sudirman NS Geodetic Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    V. PLANNING FOR CONSTRUCTION OF Kejati Building 471,000,000 0 0 0 471,000,000

    1 Tobe Name Coordinator 3.00 25,000,000 75,000,000 0.00 0 0.00 25,000,000 0 0.00 0 3.00 75,000,000

    2 Tobe Name BIM Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Tobe Name Civil Engineering 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    4 Tobe Name Architect Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    5 Tobe Name MEP Engineer 1 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    6 Tobe Name MEP Engineer 2 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    7 Tobe Name Quality Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    VI. PLANNING FOR LANDSCAPE OF BPKP BUILDING 88,000,000 0 0 0 88,000,000

    1 Tobe Name Civil Engineer 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    2 Tobe Name Landscape Engineering 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    3 Tobe Name Architecture Engineer 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    4 Tobe Name MEP Engineer 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    VII. 176,000,000 0 0 0 176,000,000

    1 Ali Abdullah Civil Engineer -1 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    2 Arief Widoseno Civil Engineer -2 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Tobe Name Environmental Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    4 Tobe Name MEP Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    VIII. PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 132,000,000 0 0 0 132,000,000

    1 Tobe Name Civil Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    2 Tobe Name Environmental Specialist 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Tobe Name MEP Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    PLANNING FOR CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE (SPAM

    POMBEWE)

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    IX. PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE 132,000,000 0 0 0 132,000,000

    1 Alamsyah Civil Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    2 Asrullah Environmental Specialist 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    3 Ramadhan MEP Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    X. 88,000,000 0 0 0 88,000,000

    1 Muzakkir Civil Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    2 Sarloca Environmental Engineer 2.00 22,000,000 44,000,000 0.00 0 0.00 22,000,000 0 0.00 0 2.00 44,000,000

    XI. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha) 207,000,000 0 0 0 207,000,000

    1 Tobe Name Koordinator 3.00 25,000,000 75,000,000 0.00 0 0.00 25,000,000 0 0.00 0 3.00 75,000,000

    2 Hamka M. Noer Civil Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    3 Ashudi Architecture Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    XII. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise (46 Ha) 132,000,000 0 0 0 132,000,000

    1 Arfan Karim Civil Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    2 Alwarham Zakaria Architecture Engineer 3.00 22,000,000 66,000,000 0.00 0 0.00 22,000,000 0 0.00 0 3.00 66,000,000

    XIII. PLANNING OF LAND DEVELOPMENT FOR POMBEWE (41,86 Ha) 44,000,000 0 0 0 44,000,000

    1 Tobe Name Civil Engineer 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    2 Tobe Name Architecture Engineer 1.00 22,000,000 22,000,000 0.00 0 0.00 22,000,000 0 0.00 0 1.00 22,000,000

    C. COST ESTIMATOR 2,850,000,000 903,879,972 20,000,000 923,879,972 1,926,120,028

    C-1 Felix Y. Bogar Cost Estimator Kota Manado 8.00 10,000,000 80,000,000 5.19 51,904,762 0.00 10,000,000 0 5.19 51,904,762 2.81 28,095,238

    C-2 Tobe Name Cost Estimator Kota Gorontalo 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-3 Tobe Name Cost Estimator Kota Palu 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    C-4 Tobe Name Cost Estimator Kota Makasar 6.00 10,000,000 60,000,000 0.00 0 0.00 10,000,000 0 0.00 0 6.00 60,000,000

    C-5 Ummu Kalsum Cost Estimator Kabupten Gowa 10.00 10,000,000 100,000,000 9.60 96,000,000 0.00 10,000,000 0 9.60 96,000,000 0.40 4,000,000

    C-6 Muhammad Basri Cost Estimator Kota Palopo 14.00 10,000,000 140,000,000 4.00 40,000,000 2.00 10,000,000 20,000,000 6.00 60,000,000 8.00 80,000,000

    C-7 Tobe Name Cost Estimator Kota Pare-Pare 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-8 Rijal Ansaputra Cost Estimator Kota Kendari 10.00 10,000,000 100,000,000 7.63 76,315,789 0.00 10,000,000 0 7.63 76,315,789 2.37 23,684,211

    C-9 Tobe Name Cost Estimator Kabupaten Kolaka 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-10 Tobe Name Cost Estimator Kota Tual 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-11 Tobe Name Cost Estimator Kota Ambon 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-12 Tobe Name Cost Estimator Kota Ternate 10.00 10,000,000 100,000,000 0.00 0 0.00 10,000,000 0 0.00 0 10.00 100,000,000

    C-13 Murdasal, ST Cost Estimator Kota Sorong 10.00 10,000,000 100,000,000 5.78 57,826,087 0.00 10,000,000 0 5.78 57,826,087 4.22 42,173,913

    C-14 Laorens Michell Ngutra Cost Estimator Kota Jayapura 10.00 10,000,000 100,000,000 4.65 46,500,000 0.00 10,000,000 0 4.65 46,500,000 5.35 53,500,000

    I 670,000,000 535,333,333 0 535,333,333 134,666,667

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Muhammad Mirza Cost Estimator - 1 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    2 Arif Rahman Cost Estimator - 2 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    3 Muhammad Afandy Radjab Cost Estimator - 3 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    4 Irfan Cost Estimator - 4 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    5 Dwi Wahyuningsih Cost Estimator - 5 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    6 Puswanto Cost Estimator - 6 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    7 Sulfiani S. Pangeja Cost Estimator - 7 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    8 Imam Bohari Cost Estimator - 8 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    9 Ardhy Budi W Cost Estimator - 9 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    10 Haryanti Cost Estimator - 10 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    11 Dian Nugrah Cost Estimator - 11 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    12 Andre Pamuji Wilantolo Cost Estimator - 12 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    13 Andi Ismanto Cost Estimator - 13 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    14 Sugiyarto Cost Estimator - 14 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    15 Ari Dirgantara Cost Estimator - 15 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    16 Panji Agus Purwantono Cost Estimator - 16 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    17 Saiful Afifudin Cost Estimator - 17 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI TENGAH

    PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    18 Nurhcholis Laminula Cost Estimator - 18 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    19 Muhamad Syarif Cost Estimator - 19 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    20 Datumuseng Sabdullah Cost Estimator - 20 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    21 Puguh C. Nugroho Cost Estimator - 21 0.00 10,000,000 0 0.00 0 0.00 10,000,000 0 0.00 0 0.00 0

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Aprianto M. Alwi Cost Estimator - 1 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    2 Andre Pamuji Wilantomo Cost Estimator - 2 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    3 Muh. Gunawan Cost Estimator - 3 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    4 M. Afandy Radjab Cost Estimator - 4 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    5 Andi Ismanto Cost Estimator - 5 5.00 10,000,000 50,000,000 4.87 48,666,667 0.00 10,000,000 0 4.87 48,666,667 0.13 1,333,333

    6 Arief Widoseno Cost Estimator - 6 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    7 Tobe Name Cost Estimator - 7 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    II PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 120,000,000 0 0 0 120,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    1 Fenny Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 To be name Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Arief Romansyah Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 To be name Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    III 450,000,000 0 0 0 450,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 To be name Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 To be name Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    3 To be name Cost Estimator - 3 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    4 To be name Cost Estimator - 4 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    5 To be name Cost Estimator - 5 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    6 To be name Cost Estimator - 6 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 To be name Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 To be name Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    3 To be name Cost Estimator - 3 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    4 To be name Cost Estimator - 4 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    5 To be name Cost Estimator - 5 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    6 To be name Cost Estimator - 6 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    d. Planning for Multifunction Building of Tadulako University

    1 Cucu Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 Iman Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    3 Shandy Cost Estimator - 3 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    IV 40,000,000 0 0 0 40,000,000

    a. Planning for Construction of 1.600 units Huntap in Duyu, Pombewe and Satelit

    1 Eko Hardiono Cost Estimator - 1 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    2 Tobe Name Cost Estimator - 2 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    V. PLANNING FOR CONSTRUCTION OF KEJATI BUILDING 60,000,000 0 0 0 60,000,000

    1 Shandy Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 To be name Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO UNIVERSITY

    PLANNING FOR CONSTRUCTION OF 1.600 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    V. PLANNING FOR LANDSCAPE OF BPKP BUILDING 10,000,000 0 0 0 10,000,000

    1 Cucu Cost Estimator 1.00 10,000,000 10,000,000 0.00 0 0.00 10,000,000 0 0.00 0 1.00 10,000,000

    VI 20,000,000 0 0 0 20,000,000

    1 To be name Cost Estimator 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    VII. PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha 20,000,000 0 0 0 20,000,000

    1 To be name Cost Estimator 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    VIII. PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE 20,000,000 0 0 0 20,000,000

    1 Imam Bohari Cost Estimator 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    IX 20,000,000 0 0 0 20,000,000

    1 Andi Faried M. Cost Estimator 2.00 10,000,000 20,000,000 0.00 0 0.00 10,000,000 0 0.00 0 2.00 20,000,000

    X. 60,000,000 0 0 0 60,000,000

    1 Ahmad Fandhi Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 Aulia Annisa Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    XI. 60,000,000 0 0 0 60,000,000

    1 Nuralim Hartih Cost Estimator - 1 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    2 Atik Verawaty Cost Estimator - 2 3.00 10,000,000 30,000,000 0.00 0 0.00 10,000,000 0 0.00 0 3.00 30,000,000

    XII. 20,000,000 0 0 0 20,000,000

    1 Aulia Annisa Cost Estimator - 1 1.00 10,000,000 10,000,000 0.00 0 0.00 10,000,000 0 0.00 0 1.00 10,000,000

    2 Atik Verawaty Cost Estimator - 2 1.00 10,000,000 10,000,000 0.00 0 0.00 10,000,000 0 0.00 0 1.00 10,000,000

    D. INSPECTOR 1,440,000,000 162,600,000 66,900,000 229,500,000 1,210,500,000

    D-1 Tobe Name Inspector Kota Manado 10.00 9,000,000 90,000,000 0.00 0 0.00 9,000,000 0 0.00 0 10.00 90,000,000

    D-2 Muis Manyoe Inspector Kota Gorontalo 12.00 9,000,000 108,000,000 4.33 39,000,000 2.00 9,000,000 18,000,000 6.33 57,000,000 5.67 51,000,000

    D-3 Tobe Name Inspector Kota Palu 0.00 9,000,000 0 0.00 0 0.00 9,000,000 0 0.00 0 0.00 0

    D-4 Tobe Name Inspector Kota Makasar 6.00 9,000,000 54,000,000 0.00 0 0.00 9,000,000 0 0.00 0 6.00 54,000,000

    D-5 Tobe Name Inspector Kabupten Gowa 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-6 Tobe Name Inspector Kota Palopo 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-7 Tobe Name Inspector Kota Pare-Pare 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-8 Rijalansa Putra Inspector Kota Kendari -1 12.00 9,000,000 108,000,000 5.00 45,000,000 1.43 9,000,000 12,900,000 6.43 57,900,000 5.57 50,100,000

    Rijalansa Putra Inspector Kota Kendari -2 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-9 M. Ramli Ngguro Inspector Kabupaten Kolaka 12.00 9,000,000 108,000,000 6.00 54,000,000 2.00 9,000,000 18,000,000 8.00 72,000,000 4.00 36,000,000

    D-10 Tobe Name Inspector Kota Tual 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-11 Tobe Name Inspector Kota Ambon 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-12 Tobe Name Inspector Kota Ternate 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-13 Tobe Name Inspector Kota Sorong 12.00 9,000,000 108,000,000 0.00 0 0.00 9,000,000 0 0.00 0 12.00 108,000,000

    D-14 M. Iqbal, AMD Inspector Kota Jayapura 12.00 9,000,000 108,000,000 2.73 24,600,000 2.00 9,000,000 18,000,000 4.73 42,600,000 7.27 65,400,000

    E. SURVEYOR 2,000,000,000 419,066,666 48,000,000 467,066,666 1,532,933,334

    E-1 Tobe Name Surveyor Kota Manado 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    E-2 Judin Lahab Surveyor Kota Gorontalo 10.00 8,000,000 80,000,000 4.33 34,666,667 2.00 8,000,000 16,000,000 6.33 50,666,667 3.67 29,333,333

    E-3 Tobe Name Surveyor Kota Palu 0.00 8,000,000 0 0.00 0 0.00 8,000,000 0 0.00 0 0.00 0

    E-4 Tobe Name Surveyor Kota Makasar 6.00 8,000,000 48,000,000 0.00 0 0.00 8,000,000 0 0.00 0 6.00 48,000,000

    E-5 Taufan Mahyudin Surveyor Kabupten Gowa 10.00 8,000,000 80,000,000 1.60 12,800,000 0.00 8,000,000 0 1.60 12,800,000 8.40 67,200,000

    E-6 Tobe Name Surveyor Kota Palopo 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-7 Tobe Name Surveyor Kota Pare-Pare 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-8 Ading Suryanto Surveyor Kota Kendari -1 10.00 8,000,000 80,000,000 10.00 80,000,000 0.00 8,000,000 0 10.00 80,000,000 0.00 0

    Ading Suryanto Surveyor Kota Kendari -2 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-9 Rabbul Izzat H. Surveyor Kabupaten Kolaka 12.00 8,000,000 96,000,000 6.00 48,000,000 2.00 8,000,000 16,000,000 8.00 64,000,000 4.00 32,000,000

    E-10 Agustinus C. Lutlutur Surveyor Kota Tual 8.00 8,000,000 64,000,000 3.80 30,400,000 0.00 8,000,000 0 3.80 30,400,000 4.20 33,600,000

    E-11 Tobe Name Surveyor Kota Ambon 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-12 Tobe Name Surveyor Kota Ternate 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-13 Tobe Name Surveyor Kota Sorong 10.00 8,000,000 80,000,000 0.00 0 0.00 8,000,000 0 0.00 0 10.00 80,000,000

    E-14 Muh. Iqbal / Jean Alan Bayao Surveyor Kota Jayapura 10.00 8,000,000 80,000,000 6.65 53,200,000 2.00 8,000,000 16,000,000 8.65 69,200,000 1.35 10,800,000

    I. 224,000,000 160,000,000 0 160,000,000 64,000,000MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI TENGAH

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TALISE

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR POMEWE (54 Ha)

    PLANNING FOR CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Herman Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Muh. Wahyullah Tahir Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Muh. Aksan Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Muh. Fajrin Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    17 Bekti Astuti Surveyor - 17 5.00 8,000,000 40,000,000 5.00 40,000,000 0.00 8,000,000 0 5.00 40,000,000 0.00 0

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Darma Noldi Mariso Surveyor - 1 5.00 8,000,000 40,000,000 5.00 40,000,000 0.00 8,000,000 0 5.00 40,000,000 0.00 0

    2 Amiruddin Surveyor - 2 5.00 8,000,000 40,000,000 5.00 40,000,000 0.00 8,000,000 0 5.00 40,000,000 0.00 0

    3 M. Hadi Virgianto Akbar Surveyor - 3 5.00 8,000,000 40,000,000 5.00 40,000,000 0.00 8,000,000 0 5.00 40,000,000 0.00 0

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 192,000,000 0 0 0 192,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    1 Tobe Name Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Tobe Name Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Tobe Name Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Tobe Name Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    1 Sugeng Mulyono Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Tri Sucipta Adi K Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Tobe Name Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Tobe Name Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Muhammad Rahmad Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Try Sutrasol Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Tobe Name Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Tobe Name Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    III. 368,000,000 0 0 0 368,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    1 Trisno Yuwono Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Rendi Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Andi Toto Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Anggihtyar Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    5 Ardiansah Badja Surveyor - 5 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    6 Ayub Surveyor - 6 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    7 Candra Nugraha Surveyor - 7 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    8 Irwan Wungguli Surveyor - 8 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    9 M Yusuf Amd Surveyor - 9 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    10 Ketrin Surveyor - 10 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    11 Sasmito YP ST Surveyor - 11 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    12 Isra Asri Surveyor - 12 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    13 Kamrus Ah T Surveyor - 13 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    14 Ahmad Abdul Haq Surveyor - 14 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    15 Fardi ST Surveyor - 15 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 Tobe Name Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Tobe Name Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    3 Tobe Name Surveyor - 3 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    4 Tobe Name Surveyor - 4 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    5 Tobe Name Surveyor - 5 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO UNIVERSITY

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    6 Tobe Name Surveyor - 6 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    d. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Tobe Name Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Tobe Name Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    3 Tobe Name Surveyor - 3 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    4 Tobe Name Surveyor - 4 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    IV. 32,000,000 0 0 0 32,000,000

    a. Planning for Construction of 630 units Huntap in Duyu, Pombewe and Satelit

    1 Tobe Name Surveyor - 1 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    2 Tobe Name Surveyor - 2 2.00 8,000,000 16,000,000 0.00 0 0.00 8,000,000 0 0.00 0 2.00 16,000,000

    V. 32,000,000 0 0 0 32,000,000

    1 Tobe Name Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Tobe Name Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    3 Tobe Name Surveyor - 3 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    4 Tobe Name Surveyor - 4 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    VI. 8,000,000 0 0 0 8,000,000

    1 Tobe Name Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    VII. 24,000,000 0 0 0 24,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Herman Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    3 Tobe Name Surveyor - 3 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    VIII. 16,000,000 0 0 0 16,000,000

    1 Tobe Name Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Tobe Name Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    IX. 16,000,000 0 0 0 16,000,000

    1 Muh. Wahyullah Taher Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Muh. Aksan Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    X. 16,000,000 0 0 0 16,000,000

    1 Tobe Name Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Tobe Name Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    XI. 16,000,000 0 0 0 16,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Herman Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    XII. 16,000,000 0 0 0 16,000,000

    1 Muh. Wahyullah Taher Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Muh. Aksan Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    XIII. 16,000,000 0 0 0 16,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    2 Herman Surveyor - 2 1.00 8,000,000 8,000,000 0.00 0 0.00 8,000,000 0 0.00 0 1.00 8,000,000

    F. DRAFTER 1,420,000,000 618,264,718 10,000,000 628,264,718 791,735,282

    F-1 Abd. Rafli Rifai G. Drafter Kota Manado 10.00 5,000,000 50,000,000 6.00 30,000,000 2.00 5,000,000 10,000,000 8.00 40,000,000 2.00 10,000,000

    F-2 Tobe Name Drafter Kota Gorontalo 8.00 5,000,000 40,000,000 0.00 0 0.00 5,000,000 0 0.00 0 8.00 40,000,000

    F-3 Tobe Name Drafter Kota Palu 0.00 5,000,000 0 0.00 0 0.00 5,000,000 0 0.00 0 0.00 0

    F-4 Ardie Adyana Yusuf Drafter Kota Makasar 10.00 5,000,000 50,000,000 1.45 7,272,727 0.00 5,000,000 0 1.45 7,272,727 8.55 42,727,273

    F-5 Agus Syahnuarto Drafter Kabupten Gowa 10.00 5,000,000 50,000,000 9.60 48,000,000 0.00 5,000,000 0 9.60 48,000,000 0.40 2,000,000

    F-6 Muh. Natsir / Muh. Zulfahmi Amril Drafter Kota Palopo 10.00 5,000,000 50,000,000 9.90 49,500,000 0.00 5,000,000 0 9.90 49,500,000 0.10 500,000

    F-7Rusman Jamaluddin /

    M. Zulfahmi AmrilDrafter Kota Pare-Pare 10.00 5,000,000 50,000,000 9.03 45,171,053 0.00 5,000,000 0 9.03 45,171,053 0.97 4,828,947

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR POMBEWE (54 Ha)

    PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE

    PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise

    PLANNING FOR CONSTRUCTION OF KEJATI Building

    PLANNING FOR LANDSCAPE OF BPKP Building

    PLANNING OF CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE

    PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha

    PLANNING FOR CONSTRUCTION OF 1600 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    F-8 Ardan Fitra Wardana Drafter Kota Kendari 10.00 5,000,000 50,000,000 8.63 43,157,895 0.00 5,000,000 0 8.63 43,157,895 1.37 6,842,105

    F-9 Gunawansyah Drafter Kabupaten Kolaka 10.00 5,000,000 50,000,000 10.00 50,000,000 0.00 5,000,000 0 10.00 50,000,000 0.00 0

    F-10 Rio Dafcar Efruan Drafter Kota Tual 10.00 5,000,000 50,000,000 3.80 19,000,000 0.00 5,000,000 0 3.80 19,000,000 6.20 31,000,000

    F-11 Tobe Name Drafter Kota Ambon 10.00 5,000,000 50,000,000 0.00 0 0.00 5,000,000 0 0.00 0 10.00 50,000,000

    F-12 Ibnu Ashar Ganda Drafter Kota Ternate 12.00 5,000,000 60,000,000 10.00 50,000,000 0.00 5,000,000 0 10.00 50,000,000 2.00 10,000,000

    F-13 Surianti, ST Drafter Kota Sorong 10.00 5,000,000 50,000,000 5.78 28,913,043 0.00 5,000,000 0 5.78 28,913,043 4.22 21,086,957

    F-14 Muhammad Rifai Drafter Kota Jayapura 10.00 5,000,000 50,000,000 5.65 28,250,000 0.00 5,000,000 0 5.65 28,250,000 4.35 21,750,000

    I. 285,000,000 219,000,000 0 219,000,000 66,000,000

    a. Penyusunan Master Plan dan DED Infrastuktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Aulia Annisa Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 Arief Hidayat Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    3 Junaedi Drafter - 3 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    4 Fitri Dwi Indarti Drafter - 4 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    5 Wafa Maulana Akmal Drafter - 16 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    6 Arfan Hasanudin Drafter - 21 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    7 Rini Rizky Drafter - 22 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    8 Igma Ade Drafter - 23 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    9 Agus Prawito Drafter - 24 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    10 Hastomo Drafter - 25 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Moh. Affandi Drafter - 2 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    2 Afandi Didik Nur Ichsan Drafter - 3 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    3 Akhmad Fajri Syahfitra Drafter - 4 5.00 5,000,000 25,000,000 4.87 24,333,333 0.00 5,000,000 0 4.87 24,333,333 0.13 666,667

    4 Paramudita Yudha Pratama Drafter - 5 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    5 Kurniawan Krisna Afandi Drafter - 6 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 60,000,000 0 0 0 60,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    Najamuddin Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    Ahmad Raditya Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    Rizky Arif Rahman Ilyas Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    Muhardin Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    III. 195,000,000 0 0 0 195,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 To be name Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 To be name Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    3 To be name Drafter - 3 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    4 To be name Drafter - 4 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    5 To be name Drafter - 5 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    6 To be name Drafter - 6 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 To Be Name Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    2 To Be Name Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    3 To Be Name Drafter - 3 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    4 To Be Name Drafter - 4 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    5 To Be Name Drafter - 5 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    6 To Be Name Drafter - 6 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO UNIVERSITY

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI TENGAH

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    d. Planning for Multifunction Building of Tadulako University

    1 To Be Name Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    2 To Be Name Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    3 To Be Name Drafter - 3 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    IV. 30,000,000 0 0 0 30,000,000

    a. Planning for Construction of 630 units Huntap in Duyu, Pombewe and Satelit

    1 Gina Agustina Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 Dian Trisnadi Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    3 Tri Munawan Drafter - 3 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    V. 45,000,000 0 0 0 45,000,000

    1 Tobe Name Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    2 Tobe Name Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    3 Tobe Name Drafter - 3 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    VI. 5,000,000 0 0 0 5,000,000

    1 Tobe Name Drafter - 1 1.00 5,000,000 5,000,000 0.00 0 0.00 5,000,000 0 0.00 0 1.00 5,000,000

    VII. 20,000,000 0 0 0 20,000,000

    1 Tobe Name Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 Tobe Name Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    VIII. 20,000,000 0 0 0 20,000,000

    1 Tobe Name Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 Tobe Name Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    IX. 20,000,000 0 0 0 20,000,000

    1 Budiman Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 M. Adrian Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    X. PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1 20,000,000 0 0 0 20,000,000

    1 Adriansyah Drafter - 1 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    2 Tobe Name Drafter - 2 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    XI. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha) 30,000,000 0 0 0 30,000,000

    1 Junaedi Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    2 Muh Aswin Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    XII. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise (42,51 Ha) 30,000,000 0 0 0 30,000,000

    1 Haryanti Drafter - 1 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    2 Dian Nugrah Putra Drafter - 2 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    XIII. 10,000,000 0 0 0 10,000,000

    1 Tobe Name Drafter - 1 1.00 5,000,000 5,000,000 0.00 0 0.00 5,000,000 0 0.00 0 1.00 5,000,000

    2 Tobe Name Drafter - 2 1.00 5,000,000 5,000,000 0.00 0 0.00 5,000,000 0 0.00 0 1.00 5,000,000

    24,857,000,000 10,144,684,767 824,900,000 10,969,584,767 13,887,415,233

    1.2. SUPPORTING STAFF

    NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    1.2. SUPPORTING STAFF 2,758,500,000 1,103,270,620 173,000,000 1,276,270,620 1,482,229,380

    a. Regional Team South Sulawesi Province 756,000,000 436,833,333 63,000,000 499,833,333 256,166,667

    1 Ashar Office Manager 24.00 9,000,000 216,000,000 14.00 126,000,000 2.00 9,000,000 18,000,000 16.00 144,000,000 8.00 72,000,000

    2 Muhammad Sasli Tabrani Secretary 24.00 5,000,000 120,000,000 14.00 70,000,000 2.00 5,000,000 10,000,000 16.00 80,000,000 8.00 40,000,000

    3 Nurmiati Computer Operator-1 24.00 5,000,000 120,000,000 14.00 70,000,000 2.00 5,000,000 10,000,000 16.00 80,000,000 8.00 40,000,000

    4 Rahmat Kurniawan / Riswan Computer Operator-2 24.00 5,000,000 120,000,000 13.67 68,333,333 2.00 5,000,000 10,000,000 15.67 78,333,333 8.33 41,666,667

    PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Pombewe (54 Ha)

    PLANNING FOR CONSTRUCTION OF KEJATI Building

    PLANNING FOR LANSEKAP OF BPKP Building

    PLANNING OF CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE

    PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha

    Sub Total 1.1

    CONTRACT AMANDEMENT -03 INVOICE LALU

    PLANNING FOR CONSTRUCTION OF 630 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

    INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    5 Asriyanti/ Iriyanie Office Girl 24.00 2,500,000 60,000,000 14.00 35,000,000 2.00 2,500,000 5,000,000 16.00 40,000,000 8.00 20,000,000

    6 M. Rilwan/ J.B. Nuhung DG. Sila Security 24.00 2,500,000 60,000,000 13.00 32,500,000 2.00 2,500,000 5,000,000 15.00 37,500,000 9.00 22,500,000

    7 Nurfadianzah / Maskur Security 24.00 2,500,000 60,000,000 14.00 35,000,000 2.00 2,500,000 5,000,000 16.00 40,000,000 8.00 20,000,000

    b. City Level Office at 14 Kota/Kab 1,260,000,000 466,437,286 110,000,000 576,437,286 683,562,714

    1 Feybi I Batubuaja Secretary/Operator Computer Kota Manado 20.00 5,000,000 100,000,000 7.10 35,500,000 2.00 5,000,000 10,000,000 9.10 45,500,000 10.90 54,500,000

    2 Darmawaty Secretary/Operator Computer Kota Gorontalo 20.00 5,000,000 100,000,000 6.00 30,000,000 2.00 5,000,000 10,000,000 8.00 40,000,000 12.00 60,000,000

    3 To be name Secretary/Operator Computer Kota Palu 0.00 5,000,000 0 0.00 0 0.00 5,000,000 0 0.00 0 0.00 0

    4 Indah A. Purbani Secretary/Operator Computer Kota Makasar 12.00 5,000,000 60,000,000 1.50 7,500,000 0.00 5,000,000 0 1.50 7,500,000 10.50 52,500,000

    5 Magrifah Burhan Secretary/Operator Computer Kabupten Gowa 20.00 5,000,000 100,000,000 12.00 60,000,000 2.00 5,000,000 10,000,000 14.00 70,000,000 6.00 30,000,000

    6 Hatriansyah Harbi Secretary/Operator Computer Kota Palopo 20.00 5,000,000 100,000,000 12.00 60,000,000 2.00 5,000,000 10,000,000 14.00 70,000,000 6.00 30,000,000

    7 Andi DianTenrigangka Secretary/Operator Computer Kota Pare-Pare 20.00 5,000,000 100,000,000 12.00 60,000,000 2.00 5,000,000 10,000,000 14.00 70,000,000 6.00 30,000,000

    8 Suhardan Secretary/Operator Computer Kota Kendari 20.00 5,000,000 100,000,000 4.77 23,833,333 2.00 5,000,000 10,000,000 6.77 33,833,333 13.23 66,166,667

    9 Nursyamsu, SE Secretary/Operator Computer Kab. Kolaka 20.00 5,000,000 100,000,000 6.82 34,090,909 2.00 5,000,000 10,000,000 8.82 44,090,909 11.18 55,909,091

    10 Ester K. R. / Martina Sandra S. Secretary/Operator Computer Kota Tual 20.00 5,000,000 100,000,000 3.80 19,000,000 2.00 5,000,000 10,000,000 5.80 29,000,000 14.20 71,000,000

    11 Rino Papilaya Secretary/Operator Computer Kota Ambon 20.00 5,000,000 100,000,000 5.52 27,600,000 2.00 5,000,000 10,000,000 7.52 37,600,000 12.48 62,400,000

    12 Nur Daniah M. Said Secretary/Operator Computer Kota Ternate 20.00 5,000,000 100,000,000 7.00 35,000,000 2.00 5,000,000 10,000,000 9.00 45,000,000 11.00 55,000,000

    13 M. Akshar, S.Pg Secretary/Operator Computer Kota Sorong 20.00 5,000,000 100,000,000 7.78 38,913,044 2.00 5,000,000 10,000,000 9.78 48,913,044 10.22 51,086,956

    14 Fahri Egha Randang Secretary/Operator Computer Kota Jayapura 20.00 5,000,000 100,000,000 7.00 35,000,000 0.00 5,000,000 0 7.00 35,000,000 13.00 65,000,000

    c. CERC Activities 742,500,000 200,000,000 0 200,000,000 542,500,000

    1 Ana Wardhiyah/ Sugiono Secretary - 1 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    2 Andi Farint Octaviani Secretary - 2 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    3 Sugiono Secretary - 3 16.00 5,000,000 80,000,000 0.00 0 0.00 5,000,000 0 0.00 0 16.00 80,000,000

    4 Fadel Muhammad Secretary for Planning for Rehab of Hospital

    and Health Facilities 4.00 5,000,000 20,000,000 0.00 0 0.00 5,000,000 0 0.00 0 4.00 20,000,000

    5 Ketrin Secretary for Planning for Rehab of Elementary

    Education Facilities and Tadulako University 5.00 5,000,000 25,000,000 0.00 0 0.00 5,000,000 0 0.00 0 5.00 25,000,000

    6 Handoyo Secretary for Planning for Construction 630 units

    huntap in duyu, Pombewe and Satelit 2.00 5,000,000 10,000,000 0.00 0 0.00 5,000,000 0 0.00 0 2.00 10,000,000

    7 To be name Secretary for Multifunction Building of Tadulako

    University 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    8 To be name Secretary for Construction of Kejati Building 3.00 5,000,000 15,000,000 0.00 0 0.00 5,000,000 0 0.00 0 3.00 15,000,000

    9 To be name Secretary for Landscape of BPKP Building 1.00 5,000,000 5,000,000 0.00 0 0.00 5,000,000 0 0.00 0 1.00 5,000,000

    10 To be name Secretary for Urgent Activity 6.00 5,000,000 30,000,000 0.00 0 0.00 5,000,000 0 0.00 0 6.00 30,000,000

    11 Susi Sutianah Computer Operator - 1 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    12 Totok Widarto Computer Operator - 2 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    13 Rahmi Mispun Computer Operator - 3 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    14 Jamal Ismail Computer Operator - 4 5.00 5,000,000 25,000,000 5.00 25,000,000 0.00 5,000,000 0 5.00 25,000,000 0.00 0

    15 To be name Computer Operator - 5 0.00 5,000,000 0 0.00 0 0.00 5,000,000 0 0.00 0 0.00 0

    16 To be name Computer Operator - 6 0.00 5,000,000 0 0.00 0 0.00 5,000,000 0 0.00 0 0.00 0

    17 Aldilla Computer Operator for Planning for Rehab of

    Hospital and Health Facilities 4.00 5,000,000 20,000,000 0.00 0 0.00 0 4.00 20,000,000

    18 Neni Purwanti Computer Operator for Planning for Rehab of

    Hospital and Health Facilities 4.00 5,000,000 20,000,000 0.00 0 0.00 0 4.00 20,000,000

    19 Ferra

    Computer Operator for Planning for Rehab of

    Elementary Education Facilities and Tadulako

    University

    5.00 5,000,000 25,000,000 0.00 0 0.00 0 5.00 25,000,000

    20 Ahmed

    Computer Operator for Planning for Rehab of

    Elementary Education Facilities and Tadulako

    University

    5.00 5,000,000 25,000,000 0.00 0 0.00 0 5.00 25,000,000

    21 To be name Computer Operator for Planning for Construction

    630 units huntap in duyu, Pombewe and Satelit 2.00 5,000,000 10,000,000 0.00 0 0.00 0 2.00 10,000,000

    22 To be name Computer Operator for Planning for Construction

    630 units huntap in duyu, Pombewe and Satelit 2.00 5,000,000 10,000,000 0.00 0 0.00 0 2.00 10,000,000

    23 To be name Computer Operator for Multifunction Building of

    Tadulako University 3.00 5,000,000 15,000,000 0.00 0 0.00 0 3.00 15,000,000

    24 To be name Computer Operator for Construction of Kejati

    Building 3.00 5,000,000 15,000,000 0.00 0 0.00 0 3.00 15,000,000

    25 To be name Computer Operator for Landscape of BPKP Building 1.00 5,000,000 5,000,000 0.00 0 0.00 0 1.00 5,000,000

    26 To be name Computer Operator for Urgent Activity 6.00 5,000,000 30,000,000 0.00 0 0.00 0 6.00 30,000,000

    27 Hasan/Misna Office Boy - 1 21.00 2,500,000 52,500,000 5.00 12,500,000 0.00 2,500,000 0 5.00 12,500,000 16.00 40,000,000

    28 Husein Office Boy - 2 5.00 2,500,000 12,500,000 5.00 12,500,000 0.00 2,500,000 0 5.00 12,500,000 0.00 0

    29 Siswadi Office Boy for Planning for Rehab of Hospital and

    Health Facilities 4.00 2,500,000 10,000,000 0.00 0 0.00 2,500,000 0 0.00 0 4.00 10,000,000

    30 Misna Office Boy for Planning for Rehab of Elementary

    Education Facilities and Tadulako University 5.00 2,500,000 12,500,000 0.00 0 0.00 2,500,000 0 0.00 0 5.00 12,500,000

  • NO NAMA POSISI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    SISA KONTRAKCONTRACT

    AMANDEMENT -03INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

    31 To be name Office Boy for Planning for Construction 630 units

    huntap in duyu, Pombewe and Satelit 2.00 2,500,000 5,000,000 0.00 0 0.00 2,500,000 0 0.00 0 2.00 5,000,000

    32 To be name Office Boy for Multifunction Building of Tadulako

    University 3.00 2,500,000 7,500,000 0.00 0 0.00 2,500,000 0 0.00 0 3.00 7,500,000

    33 To be name Office Boy for Construction of Kejati Building 3.00 2,500,000 7,500,000 0.00 0 0.00 2,500,000 0 0.00 0 3.00 7,500,000

    34 To be name Office Boy for Landscape of BPKP Building 1.00 2,500,000 2,500,000 0.00 0 0.00 2,500,000 0 0.00 0 1.00 2,500,000

    35 To be name Office Boy for Urgent Activity 6.00 2,500,000 15,000,000 0.00 0 0.00 2,500,000 0 0.00 0 6.00 15,000,000

    36 Slamet Security - 1 21.00 2,500,000 52,500,000 5.00 12,500,000 0.00 2,500,000 0 5.00 12,500,000 16.00 40,000,000

    37 Asmari Security - 2 5.00 2,500,000 12,500,000 5.00 12,500,000 0.00 2,500,000 0 5.00 12,500,000 0.00 0

    38 Roni Setiawan Security for Planning for Rehab of Hospital and

    Health Facilities 4.00 2,500,000 10,000,000 0.00 0 0.00 2,500,000 0 0.00 0 4.00 10,000,000

    39 To be name Security for Planning for Rehab of Elementary

    Education Facilities and Tadulako University 5.00 2,500,000 12,500,000 0.00 0 0.00 2,500,000 0 0.00 0 5.00 12,500,000

    40 To be name Security for Planning for Construction 630 units

    huntap in duyu, Pombewe and Satelit 2.00 2,500,000 5,000,000 0.00 0 0.00 2,500,000 0 0.00 0 2.00 5,000,000

    2,758,500,000 1,103,270,620 173,000,000 1,276,270,620 1,482,229,380

    27,615,500,000 11,247,955,387 997,900,000 12,245,855,387 15,369,644,613TOTAL REMUNERASI

    Sub Total 1.2

  • II. DIRECT REIMBURSABLE COST

    2.1. MOBILIZATION / DEMOBILIZATION

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.1.1. Reguler Team 92,200,000 3,966,940 0 3,966,940 88,233,060

    a Jakarta - Makasar ( Return ) 13 Trip 6 3,100,000 18,600,000 0 0 0.00 3,100,000 0 0 0 6 18,600,000

    b Jakarta - Manado ( Return ) 2 Trip 2 4,300,000 8,600,000 1 1,339,840 0.00 4,300,000 0 1 1,339,840 2 7,260,160

    c Jakarta - Palu ( Return ) 1 Trip 1 4,000,000 4,000,000 0 0 0.00 4,000,000 0 0 0 1 4,000,000

    d Jakarta - Gorontalo ( Return ) 2 Trip 2 4,200,000 8,400,000 0 0 0.00 4,200,000 0 0 0 2 8,400,000

    e Jakarta - Kendari ( Return ) 4 Trip 2 3,800,000 7,600,000 1 984,100 0.00 3,800,000 0 1 984,100 2 6,615,900

    f Jakarta - Ambon ( Return ) 4 Trip 2 5,000,000 10,000,000 0 0 0.00 5,000,000 0 0 0 2 10,000,000

    g Jakarta - Ternate ( Return ) 2 Trip 2 4,500,000 9,000,000 0 0 0.00 4,500,000 0 0 0 2 9,000,000

    h Jakarta - Jayapura ( Return ) 2 Trip 2 7,000,000 14,000,000 0 0 0.00 7,000,000 0 0 0 2 14,000,000

    i Jakarta - Manokwari ( Return ) 2 Trip 2 6,000,000 12,000,000 1 1,643,000 0.00 6,000,000 0 1 1,643,000 2 10,357,000

    2.1.2. For CERC Team 232,000,000 0 0 0 232,000,000

    a 5 4,000,000 20,000,000 0 0 0.00 4,000,000 0 0 0 5 20,000,000

    b 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    c 12 4,000,000 48,000,000 0 0 0.00 4,000,000 0 0 0 12 48,000,000

    d 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    e 6 4,000,000 24,000,000 0 0 0.00 4,000,000 0 0 0 6 24,000,000

    f 7 4,000,000 28,000,000 0 0 0.00 4,000,000 0 0 0 7 28,000,000

    g 4 4,000,000 16,000,000 0 0 0.00 4,000,000 0 0 0 4 16,000,000

    h 4 4,000,000 16,000,000 0 0 0.00 4,000,000 0 0 0 4 16,000,000

    i 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    j 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    k 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    l 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    m 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    n 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    324,200,000 3,966,940 0 3,966,940 320,233,060TOTAL MOBILIZATION / DEMOBILIZATION

    NO KOMPOSISI BIAYASSIA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INICONTRACT AMANDEMENT -03

    Jakarta - Palu ( Return ) for Construction 1600 units Huntap

    in Duyu and Pombewe

    Jakarta - Palu ( Return ) for Rehab of Elementary Education

    Facilities and Tadulako University

    Jakarta - Palu ( Return ) for Rehab of Hospital and Health

    Facilities

    Jakarta - Palu ( Return ) for Huntap Specialist

    Jakarta - Palu ( Return ) for Multifunction Building of

    Tadulako University

    Jakarta - Palu ( Return ) for Construction of Kejati Building

    Jakarta - Palu ( Return ) for Landscape of BPKP Building

    Jakarta - Palu ( Return ) of SPAM for Huntap PombewE

    (1.500 units) 104 Ha

    Jakarta - Palu ( Return ) of Land Development for Pombewe

    (54 Ha)

    Jakarta - Palu ( Return ) of SPAM for Huntap Duyu (230

    units) 14,1 Ha

    Jakarta - Palu ( Return ) of SPAM for Huntap Balaroa

    Satelite

    Jakarta - Palu ( Return ) of House Water Connection (SR) for

    1.800 units Houses in Tondo-1

    Jakarta - Palu ( Return ) of Land Clearing and Land

    Development for Tondo 2 (65.31 Ha)

    Jakarta - Palu ( Return ) of Land Clearing and Land

    Development for Talise(42.51 Ha)

  • 2.2. HOUSING ALLOWANCE

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.2.1. Regional Team 85,500,000 19,704,545 9,000,000 28,704,545 56,795,455

    a Team Leader Andi Amar 24.00 750,000 18,000,000 12.00 9,000,000 4.00 750,000 3,000,000 16.00 12,000,000 8.00 6,000,000

    b Infrastructure Specialist Yeni Iriani 20.00 750,000 15,000,000 0.00 0 0.00 750,000 0 0.00 0 20.00 15,000,000

    c Architect Andi Bachtiar D. 24.00 750,000 18,000,000 11.77 8,829,545 4.00 750,000 3,000,000 15.77 11,829,545 8.23 6,170,455

    d Safeguard Specialist Sitti / Luciana Apriani 22.00 750,000 16,500,000 2.50 1,875,000 4.00 750,000 3,000,000 6.50 4,875,000 15.50 11,625,000

    e Additional Expert as Needed Tobe Name 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    2.2.2. Civil Level Team 234,000,000 53,401,270 15,750,000 69,151,271 164,848,729

    a Civil Engineering (Lead) Kota Manado Nusbih Ismail 24.00 750,000 18,000,000 6.68 5,013,158 0.00 750,000 0 6.68 5,013,158 17.32 12,986,842

    b Civil Engineering (Lead) Kota Gorontalo Andi Sikki 24.00 750,000 18,000,000 11.77 8,826,923 4.00 750,000 3,000,000 15.77 11,826,923 8.23 6,173,077

    c Civil Engineering (Lead) Kota Palu Moh. Arief 0.00 750,000 0 0.00 0 0.00 750,000 0 0.00 0 0.00 0

    d Civil Engineering (Lead) Kota Makasar Andi Amran 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    e Civil Engineering (Lead) Kabupten Gowa Asia Sabarudin 24.00 750,000 18,000,000 11.12 8,336,538 4.00 750,000 3,000,000 15.12 11,336,538 8.88 6,663,462

    f Civil Engineering (Lead) Kota Palopo Rahmi Habir 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    g Civil Engineering (Lead) Kota Pare-Pare Ulfah Tajudin 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    h Civil Engineering (Lead) Kota Kendari Adiputera 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    i Civil Engineering (Lead) Kabupaten Kolaka Muhammad Saleh 24.00 750,000 18,000,000 11.73 8,798,077 4.00 750,000 3,000,000 15.73 11,798,077 8.27 6,201,923

    j Civil Engineering (Lead) Kota Tual Jacob Abraham L.R 24.00 750,000 18,000,000 6.14 4,602,273 1.00 750,000 750,000 7.14 5,352,273 16.86 12,647,727

    k Civil Engineering (Lead) Kota Ambon Marzuki 24.00 750,000 18,000,000 3.12 2,336,538 0.00 750,000 0 3.12 2,336,538 20.88 15,663,462

    l Civil Engineering (Lead) Kota Ternate Aidin Jafar 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    m Civil Engineering (Lead) Kota Sorong Rahman 24.00 750,000 18,000,000 11.23 8,420,455 4.00 750,000 3,000,000 15.23 11,420,455 8.77 6,579,545

    n Civil Engineering (Lead) Kota Jayapura Baharuddin 24.00 750,000 18,000,000 9.42 7,067,308 4.00 750,000 3,000,000 13.42 10,067,308 10.58 7,932,692

    2.2.3. For CERC Team 162,750,000 34,175,000 0 34,175,000 128,575,000

    a 82.00 750,000 61,500,000 45.57 34,175,000 0.00 750,000 0 45.57 34,175,000 36.43 27,325,000

    b 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    c 35.00 750,000 26,250,000 0.00 0 0.00 750,000 0 0.00 0 35.00 26,250,000

    d 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    e 18.00 750,000 13,500,000 0.00 0 0.00 750,000 0 0.00 0 18.00 13,500,000

    f 21.00 750,000 15,750,000 0.00 0 0.00 750,000 0 0.00 0 21.00 15,750,000

    g 4.00 750,000 3,000,000 0.00 0 0.00 750,000 0 0.00 0 4.00 3,000,000

    h 8.00 750,000 6,000,000 0.00 0 0.00 750,000 0 0.00 0 8.00 6,000,000

    i 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    j 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    k 4.00 750,000 3,000,000 0.00 0 0.00 750,000 0 0.00 0 4.00 3,000,000

    l 9.00 750,000 6,750,000 0.00 0 0.00 750,000 0 0.00 0 9.00 6,750,000

    m 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    n 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    482,250,000 107,280,815 24,750,000 132,030,816 350,219,184TOTAL 2.2.

    SSIA KONTRAKNO URAIAN

    CONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

    Professional Staff for Huntap

    Professional Staff for Rehab of Hospital and Health Facilities

    Professional Staff for Rehab of Elementary Education Facilities and

    Tadulako University

    Professional Staff for Construction 1600 units Huntap in Duyu and

    Pombewe

    Professional Staff for Multifunction Building of Tadulako University

    Professional Staff for Construction of Kejati Building

    Professional Staff for Landscape of BPKP Building

    Professional Staff of SPAM for Huntap Pombewe (1.500 units) 104 Ha

    Jakarta - Palu ( Return ) of Land Clearing and Land Development for

    Pombewe (54 Ha)

    Professional Staff of SPAM for Huntap Duyu (230 units) 14,1 Ha

    Professional Staff of SPAM for Huntap Balaroa Satelite

    Professional Staff of House Water Connection (SR) for 1.800 units

    Houses in Tondo-1

    Professional Staff of Land Clearing and Land Development for

    Tondo 2 (65.31 Ha)

    Professional Staff of Land Clearing and Land Development for

    Talise (42.51 Ha)

  • 2.3. DUTY TRAVEL EXPENSES

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 248,450,000 71,638,615 0 71,638,615 176,811,385

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS SOUTH SULAWESI PROVINCE 23,100,000 6,850,000 0 6,850,000 16,250,000

    1 From Kota Makasar to Kab. Gowa 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 6 150,000 900,000 3 450,000 0 150,000 0 3 450,000 3 450,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 5 500,000 0 100,000 0 5 500,000 7 700,000

    2 From Kota Makasar to Kota Pare pare 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 6 200,000 1,200,000 6 1,200,000 0 200,000 0 6 1,200,000 0 0

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 3 900,000 0 300,000 0 3 900,000 3 900,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 10 1,000,000 0 100,000 0 10 1,000,000 2 200,000

    3 From Kota Makasar to Kota Palopo 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 6 2,000,000 12,000,000 3 900,000 0 2,000,000 0 3 900,000 3 11,100,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 4 1,200,000 0 300,000 0 4 1,200,000 2 600,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 7 700,000 0 100,000 0 7 700,000 5 500,000

    2.3.2. FROM KAB/KOTA TO PROVINCE/SATKER PKP FOR COORDINATION MEETING 49,850,000 4,000,000 0 4,000,000 45,850,000

    1 From Kab. Gowa to Kota Makasar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 13 150,000 1,950,000 4 600,000 0 150,000 0 4 600,000 9 1,350,000

    OSA 10 1 2 m/d 26 100,000 2,600,000 6 600,000 0 100,000 0 6 600,000 20 2,000,000

    Accomodation 13 300,000 3,900,000 0 0 0 300,000 0 0 0 13 3,900,000

    2 From Kota Pare pare to Kota Makasar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 12 200,000 2,400,000 3 600,000 0 200,000 0 3 600,000 9 1,800,000

    OSA 10 1 2 m/d 34 100,000 3,400,000 6 600,000 0 100,000 0 6 600,000 28 2,800,000

    Accomodation 22 300,000 6,600,000 0 0 0 300,000 0 0 0 22 6,600,000

    3 From Kota Palopo to Kota Makassar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 2,000,000 20,000,000 3 900,000 0 2,000,000 0 3 900,000 7 19,100,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 7 700,000 0 100,000 0 7 700,000 23 2,300,000

    Accomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2.3.2.A FROM REGIONAL TO KAB/KOTA FOR COORDINATION MEETING 50,500,000 2,950,000 0 2,950,000 47,550,000

    1 From Kota Makasar to Kab. Gowa 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 150,000 1,500,000 7 1,050,000 0 150,000 0 7 1,050,000 3 450,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 7 700,000 0 100,000 0 7 700,000 23 2,300,000

    Acomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2 From Kota Makasar to Kota Pare-Pare 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 200,000 2,000,000 0 0 0 200,000 0 0 0 10 2,000,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 0 0 0 100,000 0 0 0 30 3,000,000

    Acomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    3 From Kota Makasar to Kota Palopo 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 2,000,000 20,000,000 1 300,000 0 2,000,000 0 1 300,000 9 19,700,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 3 300,000 0 100,000 0 3 300,000 27 2,700,000

    Acomodation 20 300,000 6,000,000 2 600,000 0 300,000 0 2 600,000 18 5,400,000

    2.3.3. TO JAKARTA 125,000,000 57,838,615 0 57,838,615 67,161,385

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 25 3,100,000 77,500,000 16 47,238,615 0 3,100,000 0 16 47,238,615 9 30,261,385

    Inland travel in Jakarta 4 2 1 Trip 25 300,000 7,500,000 16 4,800,000 0 300,000 0 16 4,800,000 9 2,700,000

    Hotel Accomodation 4 2 3 Trip 75 400,000 30,000,000 0 0 0 400,000 0 0 0 75 30,000,000

    OSA 4 2 4 Trip 100 100,000 10,000,000 58 5,800,000 0 100,000 0 58 5,800,000 42 4,200,000

    248,450,000 71,638,615 0 71,638,615 176,811,385TOTAL OF DUTY TRAVEL SOUTH SULAWESI PROVINCE

    SSIA KONTRAKNO URAIAN

    CONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 92,200,000 21,807,400 2,272,000 24,079,400 68,120,600

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS NORTH SULAWESI PROVINCE 22,200,000 9,041,600 0 9,041,600 13,158,400

    1 From Kota Makasar to Kota Manado 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 2,800,000 16,800,000 3 6,941,600 0 2,800,000 0 3 6,941,600 3 9,858,400

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 4 1,200,000 0 300,000 0 4 1,200,000 8 2,400,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 9 900,000 0 100,000 0 9 900,000 9 900,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 37,000,000 3,603,100 0 3,603,100 33,396,900

    1 From Kota Makasar to Kota Manado 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 10 2,800,000 28,000,000 1 2,303,100 0 2,800,000 0 1 2,303,100 9 25,696,900

    OSA 10 1 2 m/d 30 100,000 3,000,000 4 400,000 0 100,000 0 4 400,000 26 2,600,000

    Accomodation 20 300,000 6,000,000 3 900,000 0 300,000 0 3 900,000 17 5,100,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 8,200,000 0 2,272,000 2,272,000 5,928,000

    1 From Kota Manado to Makasar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 2 2,800,000 5,600,000 0 0 1 2,800,000 1,972,000 1 1,972,000 1 3,628,000

    OSA 10 1 2 m/d 8 100,000 800,000 0 0 3 100,000 300,000 3 300,000 5 500,000

    Acomodation 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    2.3.3. TO JAKARTA 24,800,000 9,162,700 0 9,162,700 15,637,300

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 4,300,000 17,200,000 2 7,962,700 0 4,300,000 0 2 7,962,700 2 9,237,300

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 2 600,000 0 300,000 0 2 600,000 2 600,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 6 600,000 0 100,000 0 6 600,000 10 1,000,000

    92,200,000 21,807,400 2,272,000 24,079,400 68,120,600

    INVOICE S/D SAAT INI SSIA KONTRAK

    TOTAL OF DUTY TRAVEL NORTH SULAWESI PROVINCE

    NO URAIANCONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS CENTRAL SULAWESI PROVINCE 21,000,000 11,899,700 0 11,899,700 9,100,300

    1 From Kota Makasar to Kota Palu 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 2,400,000 14,400,000 5 9,699,700 0 2,400,000 0 5 9,699,700 1 4,700,300

    Transport 1 1 1 2 1 Trip 6 200,000 1,200,000 5 1,000,000 0 200,000 0 5 1,000,000 1 200,000

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 0 0 0 300,000 0 0 0 12 3,600,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 12 1,200,000 0 100,000 0 12 1,200,000 6 600,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 17,500,000 0 0 0 17,500,000

    1 From Kota Makasar to Kota Palu 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 5 2,400,000 12,000,000 0 0 0 2,400,000 0 0 0 5 12,000,000

    OSA 10 1 2 m/d 10 100,000 1,000,000 0 0 0 100,000 0 0 0 10 1,000,000

    Accomodation 15 300,000 4,500,000 0 0 0 300,000 0 0 0 15 4,500,000

    2.3.3. TO JAKARTA 206,500,000 0 0 0 206,500,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY RE