Status

Günther Rosner KHuK, Bad Honnef, 9/12/11 1

Erster Geburtstag

Günther Rosner KHuK, Bad Honnef, 9/12/11 2

Unterzeichung des völkerrechtlichen FAIR-Abkommens am 4.10.2010 in Wiesbaden durch die Gründungsländer

Deutschland, Finnland, Frankreich, Indien, Polen, Rumanien, Russland, Slowenien, Schweden

BFCNilsson

FAIR Council

Vierkorn-Rudolph

ManagementBoard

Sharkov,Rosner

ResearchRosner

APPAF.C., NN

CBMMüller,Eschke

NuSTARGerl, Herlert

PANDA

Schmidt, Schadmand

Expert C‘ttee Experiments

ChairProject Office

Lehmann

TechnicalDivision

Krämer

TechnicalServicesLautenschläge

r

In-Kind Coordination

Jacoby

Technical Follow-up

E.M.

Project OfficeKolb

Site &Buildings

Hehenberger

M&E Eng. Automation, IT

Ludwig

M&E Eng. Power, Mat.

Sommer

M&E Eng. Thermo, Refrig.

Burgstaller

M&E Eng.Liqu., Gases

Jakobi

Constr. Eng.Building, Geo.

NN

ReportingHaus

AssistantNN

M&E AdvisorHildisch

Civil Eng. Advisor

Gooß

AdministrationRosner

Internal Services

E.N.

ControllingWeißbach

FinanceUrbach

PurchasingNN

PersonnelNN

Directors‘Office

Augustin

LegalAdvisor

NN

CouncilIssues

BeierSecretariat

Azzara, Maas

AFCSkeppstedt

Scientific Council

Martino

IKRBWenninger

MACEvans

FAIR GmbH

Günther Rosner 3KHuK, Bad Honnef, 9/12/11

FAIR-Forschungsabteilung

Günther Rosner KHuK, Bad Honnef, 9/12/11 4

FAIR Scientific Council

MartinoBoard of FAIR Collaborations

NilssonResearch Division

Rosner

APPAF.C., NN

CBM

Müller, Eschke

NuSTARGerl, Herlert

PANDASchmidt,

Schadmand

Expert C‘ttee Experiments

3 APPA, 2 CBM,2 NuSTAR, 2 PANDA

Project OfficeLehmann

Liaison OfficeVarentsov

Third Party Issues

Nicmorus

Chair All Accelerators

Board

Project Steering Board

CBM NuSTAR PANDA

AFC

SIS100

Experiment Coordinators

S&B PO

FAIR Council

IKRB

MAC

ACC PO

FAIR Technical Director

CR

FAIR – S&B

PMO

SubprojectSite & Buildings

FAIR Director Site & Buildings

SubprojectExperimentsFAIR Research

Director

SubprojectAccelerators

EXP PO

HESR CommonSystems

GSI GSI

o o o o

FZJ GSI

SC

BFC

APPA

Project Lead

Chair: FAIR Scientific Director

ECE

FAIR-Projektstruktur

Günther Rosner KHuK, Bad Honnef, 9/12/11 5

6

FAIR-Anlage

Günther Rosner KHuK, Bad Honnef, 9/12/11

CBM

PANDA NuSTAR

Super-FRS

APPA

7

Schnelle BeschleunigungFerrit & MA Kavitäten

Großer Gradient, variable Frequenz

Kompakt & kosteneffektivSupraleitende Magnete

dB/dt ~ 4T/s

Hohe StrahlqualitätElektronen & stochastische Kühlung XHV @ Hoher Strahlintensität

Hochvakuum ~10-13 mbar

Beschleuniger

Günther Rosner KHuK, Bad Honnef, 9/12/11

8

Anti-Proton Annihilation @ DA

Günther Rosner KHuK, Bad Honnef, 9/12/11

PANDA

KHuK, Bad Honnef, 9/12/11 9

Compressed Baryonic Matter

Günther Rosner

SIS100/300

NuSTAR

Günther Rosner KHuK, Bad Honnef, 9/12/11 10

APPA: Paritätsverletzung

Günther Rosner KHuK, Bad Honnef, 9/12/11 11

PS

PNWFS

EE

QG

522/

Mixing coefficient for states with opposite parities:

Energy levels of He-like uranium

2E1 (PNC)

To “compete” with spontaneous decay channels one needs to induce a two-

photon PNC transition by polarised light with intensity 1020 W/cm2

NN

ee

Zee

NN

Select case with small splitting!

APPA: Plasmen

Günther Rosner KHuK, Bad Honnef, 9/12/11 12

Particles / cm-3

Tem

pera

ture

[eV

]

Jupiter

LaserHeating

Sun Surface

Magnetic Fusion

solid statedensity

PHELIXSun Core

Inertial Fusion Energy

XFEL

SIS 18

Ion BeamHeating

SIS 100

Strongly coupled

plasmasIdeal plasmas

FLASH

KHuK, Bad Honnef, 9/12/11 13

Stufenweiser Aufbau

Günther Rosner

Start Version Phase A(SIS100) Phase B

(SIS300)

Modularised Start Version

Module 0 Module 1 Module 2 Module 3 Module 4 Module 5

SIS100 Exp. halls for CBM &

APPA

Super-FRS for

NuSTAR

Antiproton Facilityfor PANDA & options for

NuSTAR

LEB, NESR, FLAIR

for NuSTAR & APPA

RESRfor PANDA, NuSTAR &

APPA

2017/18

KHuK, Bad Honnef, 9/12/11 14

Modularisierte Startversion

Günther Rosner

APPA

CBM/HADES

NuSTAR

PANDAExperimente

M1: APPAM1: CBM/HADESM2: NuSTARM3: PANDA

M0

M1

M2M3

M3

Kosten MSV

Günther Rosner KHuK, Bad Honnef, 9/12/11 15

Beschleuniger inkl. Personal, Module 0 – 3 502 M€

Bau, Module 0 - 3 400 M€

FAIR-Anteil an Experimenten (ohne Super-FRS)* 78 M€

FAIR GmbH Personal & laufende Kosten (bis 2018) 47 M€

Summe Module 0 - 3 1027 M€

in 2005 € (Inflation bis 2018 ca. +50%)

* Gesamtkosten Experimente (ausschließlich Super-FRS):ca. 210 M€ (2005) = 315 M€ (2018)

Zeitlicher Ablauf

Günther Rosner KHuK, Bad Honnef, 9/12/11 16

20122011 2013 201620152014

6

BauanträgeBaustelleneinrichtungAusschreibungen BauBau der Beschleuniger- und DetektorkomponentenFertigstellung RohbauInstallation Beschleuniger und DetektorenDatennahme

7 108

2017 2018 2019

12

6789

1112

10

119

KHuK, Bad Honnef, 9/12/11 17

Zeitlicher Ablauf Experimente• Beendigung F&E Phase

– Entscheidungen bzgl. technischer Alternativen– Bau von Prototypen aller wesentlichen Detektorteile

• Einreichung “Technical Design Reports”– Evaluation durch “Expert Committee Experiments”

• Koordination mit– Bau– Beschleunigern

• Identifikation von kritischen Punkten– Meilensteine– Zeitabläufe– Ergebnisse

• Erstellung von Risiko-Management-Plänen• Sicherung der Drittmittelförderung 2012• Einreichung der Konstruktions-MoUs Ende 2012

Günther Rosner

KHuK, Bad Honnef, 9/12/11 18

Zeitlicher Ablauf Experimente• (Europaweite) Ausschreibungen 2013• Bau der Detektoren 2013-16• Einreichung der Betriebs-MoUs 2016• Einfahren der Experimente 2017/18• Erste Periode Datennahme 2018-21

Günther Rosner

Probebohrungen 31.8.11

Günther Rosner KHuK, Bad Honnef, 9/12/11 19

Baufeldfreimachung 6.12.11

Günther Rosner KHuK, Bad Honnef, 9/12/11 20

Freiflächenplanung

Günther Rosner KHuK, Bad Honnef, 9/12/11 2121

Integration in das Landschaftsbild

Fließende Geländeanschlüsse

Park- und Waldelemente

Anlehnung an nahe NaturdenkmälerRetention / Versickerung

Dachbegrünung

Fassadenbegrünung

Vielen Dank!