038BSN PAPP 25.4.2013

download 038BSN  PAPP 25.4.2013

of 14

Transcript of 038BSN PAPP 25.4.2013

  • 7/28/2019 038BSN PAPP 25.4.2013

    1/14

    PART NAME:

    PART NO:

    CUSTOMER

    SUPPLIER NAME:

    Cover plate 2KN M MS

    038BSN

    M/s Cooper Bussmann India Pvt. Ltd.,Pondicherry

    M/s .ACE ELECTRICAL EQUIPMENTS (I) PVT. LTD.,HOSUR .

  • 7/28/2019 038BSN PAPP 25.4.2013

    2/14

    Submission Level(Please Type 1-5) 3

    Cooper Part Number Part Description Cover plate 2KN M MS Supplier Name M/s.ACE Electrical Equipments India Pvt Ltd

    Revision Level Cooper Purchasing Rep. Mr.Jagan Submission Date 04.03.2013

    Primary Manufacturing Site Purchasing Rep Phone # 9442521823 PPAP Due Date

    Element

    Order

    PPAP RequirementsAIAG PPAP Fourth Edit ion

    Important: Submit your

    documents in this order.Level1

    Level2

    Level3

    Level4

    Level5

    Required Documents Assigned to Internal Due Date Comments/Concerns/Questions Included

    1 Part Submission Warrant (PSW) AR Cooper PSW Required

    2 Design Records & Bubbled part print(s). AR Two Cooper Divisional PartsPrints

    3 Approved Engineering Change Documentation AR ARVarious engineering

    documentation

    4 Customer Engineering ApprovalsNot Required for Cooper

    Submissions

    5 Design FMEA, AR AR ARCan be Cooper FMEA Format or

    an AIAG compliant DFMEA.

    6 Process Flow Diagrams AR Any standard flowchart format.

    7 Process FMEA ARCan be Cooper PFMEA Format

    or an AIAH compliant PFMEA.

    8 Control Plan ARCan be Cooper supplied format

    or AIAG compliant format.

    9 Measurement System Analysis Studies AR ARCooper GRR format or any

    statistical package format for

    gage R&R.

    10 Dimensional Results AR Must be on Cooper Dimensionalreport format

    11 Material, Performance Test Results AR ARIndustry Standard reports or test

    result formats designated by

    Cooper Industries.

    12Initial Process Study (Cpk)

    Capabi l i ty StudiesAR AR

    Process Capability Study using

    any statistical package or

    Cooper Capability Data Forms.

    13 Qualified Laboratory Documentation ARLab Scope and outside lab proof

    of accreditation.

    14 Appearance Approval Report AR AR AR AR AR AIAG format AAR

    15 Sample Product Parts ARParts tagged in accordance with

    Cooper PPAP reference manual

    16 Master Samples Required only for level 5

    17 Checking aids ARChecking aid design prints and

    GRR for checking fixtures.

    18 Customer Specific RequirementsDocuments as specified by

    Cooper Industries

    a Tooling Information Form ARSpecific document required by

    Cooper Industries.

    b Packaging Form ARSpecific document required by

    Cooper Industries.

    c Inspection Plan(ASC Suppliers only)

    IA IA IA IA Specific ASC Format

    d Specification Deviation Form IA IA IA IASpecific document required by

    Cooper Industries.

    e Supplier PPAP Checklist ARSpecific document required by

    Cooper Industries.

    Required for PPAP submission r Documents on a case by case basis are marked AR for "As Requested" IF ApplicableNot required

    PPAP

    Product io n Part Appr oval Process

    038BSN

    G

    Submission Requirements

    Suppl ier Checkl is t

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    AR IA

    YES

    b

    r

    b

    b

    r

    r

    bbbbbbbbbbbb

    r

    r

    r

    r

    r

    b

  • 7/28/2019 038BSN PAPP 25.4.2013

    3/14

    ACE Electrical Equipments India Pvt Ltd - Hosur Part Submission Warrant

    Part Name

    Dated 7/18/2011

    Additional Engineering Changes Dated 7/18/2011

    Shown on Drawing Number Purchase Order No. Weight (kg) 51.3500g

    SUPPLIER MANUFACTURING INFORMATION SUBMISSION INFORMATION

    Supplier Company Name Customer Name:

    Additional Manufacturing Sites Cooper Manufacturing Locations using the part (list all)

    PONDICHERRY

    Street Address Purchasing Representative Purchasing Office

    106/2A-1 BEHIND ESI HOSPITAL,OUTER RING ROAD HOSUR

    City-HOSUR State TAMIL Zip 635126 PPAP Due Date: SOP Date

    Does this part utilize Cooper owned tooling? Is it properly identified? If yes, P.O. #

    Does this part contain any restricted substances or require IMDS submission? Substance(s)?

    Are plastic or polymeric parts identified with appropriate ISO marking codes?

    REASON FOR SUBMISSIONInitial submission (New Parts and Part Number Changes) New Supplier, New material or new source for existing material

    Engineering Change: New/Revised drawing or other specification Change of supplier, material or non-equivalent materials/services

    Tooling: transfer, replacement (new), refurbishment, modified or additional New process or a change in production process or method

    Correction of Non-conformance or discrepancy Change of manufacturing location, sub-supplier or additional location

    Change to optional construction, material or component Other - please specify

    REQUESTED SUBMISSION LEVEL (Check one)

    Level 2 - Warrant with product samples amd limiting supporting data. (Applied to critical bulk product and simple changes)

    Level 3 - Warrant with product samples and complete supporting data. (Applied to new parts on Cooper programs) DEFAULT COOPER SUBM ISSION LEVEL

    Level 4 - Warrant and other requirements as defined by Cooper.(Applied only with prior approval from Cooperspecial situations only!)

    Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location. (Applied to parts requiring onsite review )

    SUBMISSION RESULTS

    The results for dimensional measurements material and functional tests appearance criteria statistical process package

    These results meet all drawing and specification requirements: (If "NO" - Explanation Required in Explanation/comments section below )

    Is this a multicavity tool? How many Cavities/Spindle (for molds or dies) ? Number of parts submitted by cavity/spindle

    DECLARATION

    I affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable Production Part Approval Process Manual 4th Edition

    requirements. I further warrant these samples were produced with the specified materials on regular production tooling with no operations other then the regular production

    process. The data and samples were produced at the production rate of in on Any deviations to this warrant submission

    are noted below in the explanation/comments section.#parts # hours date

    EXPLANATION/COMMENTS:

    Print Name: Job Title Fax No. 274942

    Supplier Authorized Signature Date Email

    Quality/Supplier Quality SABAREESWARAN.M Date 18.05.2013Initial Part Warrant Disposition:

    Quality/Supplier Quality Management KALYANASUNDARAM.E Date 18.05.2013

    Final Part Warrant Disposition:

    Quality or Supplier Quality Date

    Print Approver Name: 016/2013

    Cover plate 2KN M MS

    Safety and/or

    Government Regulation Engineering Drawing Revision Level G

    Cooper Part Number 038BSN

    Set in missing dimensions on holes around slot

    038BSN

    Cooper B ussmann

    COOPER BUSSMAN-PONDY

    Mr.Jagan

    Level 1 - Warrant only submitted to the customer (Applied to non-critical parts and raw bulk material)

    IMDS Number

    Vinothkumwr NPD Phone No. 04344-274943

    Cooper PPAP Tracking Number:

    Supplier Vendor Number

    ACE Electrical Equipments Indi 609318

    Expires:

    5/17/2013 [email protected]

    FOR COOPER INDUSTRIES USE ONLY

    YES NO

    Yes No

    Yes No

    Yes No

    Approved Rejected

    Interim

    Yes No

    YES NO

    mailto:[email protected]:[email protected]
  • 7/28/2019 038BSN PAPP 25.4.2013

    4/14

    Date (Orig.)

    4-Mar-13

    Supplier Name

    NO. PRODUCT PROCESSSIZE

    FREQ

    10.1 mater ial

    Brass(Cu Zn37) to

    CW508L:BS EN 1652:1998

    Temp : R350

    test ceritifcate 100%

    10.2 Thickness 2.0 0.10 micro meter 100%

    10.3 Width 62 0.20 veriner caliper 100%

    10.4 Length 1220 2.0 measuring tap 100%

    10.5 Damage Not allowed visual 100%

    10.6 Hardness HV Min 120-Max 155

    20.1 Length 58 0.8 Vernier 5

    20.2 Width 58 0.8 Vernier 5

    20.3 Hole Pitch 43.8 0.5 Vernier 5

    20.4 Hole Pitch 43.8 0.5 Vernier 5

    20.5 4 Holes Dia 6.0 0.2 Pin Gauge 5

    20.6 2 Holes Dia 5.5 0.2 Pin Gauge 5

    20.7 Hole Pitch 140.2 Height Gauge 5

    20.8 Slot width 90.2 Vernier 5

    20.9 Slot Length 280.2 Vernier 5

    21 Dimension 18.00.2 Height Gauge 5

    21.1 Flatness 0.20 Height Gauge 5

    21.2 Radius R8 Radius Gauge 5

    21.3 Flatness 0.1 Height Gauge 5

    21.4 Dimension 2.0 visual 5

    21.5 Holes Dia * 3.8 0.05 Pin Gauge 5

    30.1 Hole Pitch 180.1 Vernier 5

    30.2 Hole Dia 5.30.1 Pin Gauge 5

    40.1 Hole Pitch * 6.40.2 Height Gauge 540.2 Height 10.00.2 Height Gauge 5

    40.3 Dimension 7.00.2 Vernier 5

    50.1 Plating Thickness Tin plated 3-5 P.T. gauge

    50.2 Peel off Not allowed Orange peel of test

    50.3 Dull finish Not allowed visual

    50.4 Plating tarish Not allowed visual

    50.5 Blisters Not allowed visual

    If not ok , Stop the proces

    the same , segereate t

    produced qty

    If Not Ok Quarantine and R

    Supplier

    100% incoming inspection

    done&reciving test

    certificate by supplier

    as per Sample plan50 Plating

    Hardness Will Check External Laboratory as per plan

    As per the

    Sample

    Plan

    Setup Approvel and

    inprocess inspection as

    per Sample Plan

    40T _ _

    40 Bending 40Ton _

    _ _

    10 Raw material out sourcing

    30 Piercing

    _

    _

    SAMPLE

    REACTION PLA

    _ If Not Ok Quarantine and RSupplier

    609318

    Quality Department Approval

    ACE Electrical Equipments India Pvt Ltd

    Supplier Plant Approval

    100% incoming inspection

    done&reciving test

    certificate by supplier

    CHARACTERISTICSMETHODS

    July 18, 2011

    Supplier Code

    imuthu(prodn) Thangaraj (Qc) Vinothkumar (Designer)

    ore Team

    Press Shop8BSN Cover plate 2KN M MS

    ontrol Plan Number

    PROCESS

    NUMBER

    PROCESS NAME /

    OPERATION

    DESCRIPTION

    SPECIAL

    CHAR.

    CLASS

    Part Description

    G

    PRODUCT / PROCESS

    / SPECIFICATION / TOLERANCE

    EVALUATION/

    MEASUREMENT

    TECHNIQUE CONTROL METHOD

    Control Plan

    rt Number/ Latest Change (Rev) Level Plant Location

    kalimuthu(prodn) Thangaraj (Qc) Vinothkumar (Designer)

    Current Release Date

    CE-COOP/CP/077

    Key Contact / Phone Current Release Level

    20 Blanking & Piercing 55 ton _

    ustomer Engineering Approval / Date (If Req'd) Other Approval / Date (If Req'd)

    .07.2011

    MACHINE DEVICES / JIG /

    TOOLS FOR

    MANUFACTURING

    Note: All part print CTQ's must be clearly identified on this control plan. P

  • 7/28/2019 038BSN PAPP 25.4.2013

    5/14

    Date (Orig.)

    4-Mar-13

    Supplier Name

    NO. PRODUCT PROCESSSIZE

    FREQ

    SAMPLE

    REACTION P

    609318

    Quality Department Approval

    ACE Electrical Equipments India Pvt Ltd

    Supplier Plant Approval

    CHARACTERISTICSMETHODS

    July 18, 2011

    Supplier Code

    limuthu(prodn) Thangaraj (Qc) Vinothkumar (Designer)

    ore Team

    Press Shop8BSN Cover plate 2KN M MS

    ontrol Plan Number

    PROCESS

    NUMBER

    PROCESS NAME /

    OPERATION

    DESCRIPTION

    SPECIAL

    CHAR.

    CLASS

    Part Description

    G

    PRODUCT / PROCESS

    / SPECIFICATION / TOLERANCE

    EVALUATION/

    MEASUREMENT

    TECHNIQUE CONTROL METHOD

    Control Plan

    art Number/ Latest Change (Rev) Level Plant Location

    kalimuthu(prodn) Thangaraj (Qc) Vinothkumar (Designer)

    Current Release Date

    CE-COOP/CP/077

    Key Contact / Phone Current Release Level

    ustomer Engineering Approval / Date (If Req'd) Other Approval / Date (If Req'd)

    .07.2011

    MACHINE DEVICES / JIG /

    TOOLS FOR

    MANUFACTURING

    60.1 Thickness 2.0 0.10 micro meter

    60.2 Width 58 0.20 veriner caliper

    60.3 Slot Length 280.2 veriner caliper60.4 Slot width 90.2 veriner caliper

    60.5 Hole to hole center 43.80.5 veriner caliper

    60.6 4 Holes Dia 60.2 Pin Gauge

    60.7 Flatness 0.2max veriner height gauge

    60.8 Damage Not allowed visual

    60.9 Burr Not allowed visual

    70.1Part Name : Cover plate

    2KN M MS

    70.2 Part No : 038bSN

    If not ok Rework / Rejecti

    70 packing&despacth Despatch Register

    _ _

    as per packing standards visual 100%

    60 Finel inspection As per sampling plan

    Note: All part print CTQ's must be clearly identified on this control plan.

  • 7/28/2019 038BSN PAPP 25.4.2013

    6/14

    Date (Orig.)

    3/4/2013

    Supplier Name

    Customer Engineering Approval / Date (If ReqSupplier Plant Approval Other Approval / Date (If Req'd)

    Revision No : F

    FLOW CHART

    Control Plan Number Key Contact / Phone Current Release Level Current Release Dat

    ACE-COOP/CP/054 kalimuthu(prodn) Thangaraj (Qc) Vinothkumar (Designer)

    038BSN Cover plate 2BK M MS 609318

    18/07/2011

    Part Number/ Latest Change (Rev) Part Description

    Quality Department Approval

    kalimuthu(prodn)k.Thangaraj (Qc) Vinothkumar

    (Designer)

    ACE Electrical Equipments India Pvt Ltd

    Supplier Code Plant Location

    Core Team

    Part Name : Cover plate 2KN M Revision Date :18/7/2011

    Prepared By : Approved By :

    ACE ELECTRICAL EQUIPMENTS (I) PVT LTD

    PROCESS FLOW DIAGRAM

    COSTOMOR:COOPER BUSSMANN

    Part no : 038BSN

    RM-SUPPLIER

    M/S USHA ENTER

    INCOMING INSPECTION

    BLANKING

    PIERCING

    INPROCESS INSPECTION

    Bending

    INPROCESS

    INSPECTION

    PLATTING

    SUPPLIER

    CHEMTRECT

    INCOMING/FINAL INSPECTION

    PACKING-AS PERSTANDARD

    DESPATCH

    REWORK

    REJECTION

    RETURN BACK TO SUPPLIER

    RETURN BACK TO

    SUPPLIER

    REPLACINGPROCEDURE

    RETURN BACK TO

    SUPPLIER

    PART PROCESS NO

    10

    PART PROCESS NO

    20

    PART PROCESS NO 40

    PART PROCESS NO

    50

    PART PROCESS NO

    60

    PART PROCESS NO70

    OK

    OK

    OK

    OK

    NOT OK

    NOT OK

    NOT OK

    OK

    NOT OK

    OK

    NOT OK

    OK

    OK

    OK

    Storage Inspection OK ProcessK Movement K

    REWORK

    REJECTION

    NOT OK

    Piercing

    INPROCESS INSPECTIONNOT OK REWORK

    REJECTION

    PART PROCESS NO

    30

    OK

    OK

  • 7/28/2019 038BSN PAPP 25.4.2013

    7/14

    Design Responsibility

    Key Date

    Customer Manufacturing Site

    Prevention Detection Actions Taken

    S

    E

    V

    O

    C

    C

    D

    E

    T

    R

    P

    N

    9

    Contact Number

    C

    l

    a

    s

    s

    Potential Cause(s)/

    Failure Mechanisms

    FMEA Date

    D

    E

    T

    FMEA Date (Orig.)

    Responsibility

    and

    Completion

    Date

    FMEA Number

    Prepared By

    Potential Failure Modes and Effects Analysis

    Design FMEA

    Please indicate EITHER:

    1.) A designated RPN threshold for this process

    2.) A target percentage of steps to be addressed.

    Check One

    ItemNumber

    Print #

    Item Name

    Rev #

    Core Team

    RequirementsItem/

    Function

    Potential Effects

    of Failure

    Action Results

    NOT APPLICABLE

    S

    E

    V

    Potential

    Failure Mode

    Recommended

    Action(s)

    Current Product Controls

    O

    C

    C

    R

    P

    N

  • 7/28/2019 038BSN PAPP 25.4.2013

    8/14

    Page

    Key Date

    Prevention Detection Actions Taken

    S

    E

    V

    O

    C

    C

    D

    E

    T

    R

    P

    N

    2.0 0.2mmUnder Size/Over

    Size thickFitment Problem 8 material mixup 3

    Each

    Bundlewe

    have to check

    minium 10

    Points

    3 72

    Brass to CW508L,BS

    EN1652 Hardness Min

    120Max 155

    Hardness problemProcess Rejection

    Will More8 material mixup 3

    Hardness Will

    Check

    External

    Laboratory asper plan

    3 72

    visual Peelup,Damage

    unable to use

    production

    (Damaged

    material)

    8 Proper handling & Storage 3

    Check the

    condition of

    the packing &

    contents

    before moving

    it to storage

    area

    3 72

    As per Drawing

    Specification

    Out of

    SpecificationFitment Problem 8

    Wrong Tool Holded in the

    Machine3

    inprocess

    inspection3 72

    With out Burr

    Burr and share

    edge

    Fitment

    Problem/Safety

    Problem

    6Tool Allayment varition ,Punch

    worn out3

    Periodically

    Cuttung Edge

    has to Grind

    3 54

    visual Damage,Dent Fitment Problem 6Handling Problem,proper Clean

    the before holding the Tool3

    Periodically

    Cuttung Face

    has to Clean

    3 54

    As per Drawing

    Specification

    Out of

    SpecificationFitment Problem 8

    Wrong Tool Holded in the

    Machine3

    inprocess

    inspection3 72

    visual Damage,Dent Fitment Problem 6Handling Problem,proper Clean

    the before holding the Tool3

    Periodically

    Cuttung Face

    has to Clean3 54

    As per Drawing

    Specification

    Out of

    SpecificationFitment Problem 8

    Wrong Tool Holded in the

    Machine3

    inprocess

    inspection3 72

    visual Damage,Dent Fitment Problem 6Handling Problem,proper Clean

    the before holding the Tool3

    Periodically

    Cuttung Face

    has to Clean

    3 54

    Plating Thickness

    undersize

    Functional

    Problem6

    Timing problem,machine

    Problem3

    incoming

    inspectin3 54

    Plating Thickness

    oversize

    Functional

    Problem6

    Timing problem,machine

    Problem3

    incoming

    inspectin3 54

    Final inspectionAs per Drawing

    Specification

    Qty variation &

    material miss up Line Assy Problem 6

    handling Problem,Process

    Sequence Problem 3

    finel

    inspection 3 54Final Inspection

    report

    store

    department

    Packing & Despacth As per Schedule QtyQty variation &

    material miss up Line Assy Problem 6handling Problem,Process

    Sequence Problem 3finel

    inspection 3 54Final Inspection

    report

    store

    department

    FMEA Number

    Prepared By

    Potential Failure Modes and Effects Analysis

    Process FMEA

    Please indicate EITHER:

    1.) A designated RPN threshold for this process

    2.) A target percentage of steps to be addressed.

    Check One

    ACE-COOP/FEMA/077

    K.ThangarajContact Number

    05.03.2013

    FMEA Date (Orig.)

    Recommended

    Action(s)

    Responsibility

    and

    Completion

    Date

    Action Results

    PRODUCTION

    Kalimuthu - 9442527496

    FMEA Date

    R

    P

    N

    PRESSING

    D

    E

    T

    Current Process Controls

    O

    C

    C

    S

    E

    V

    Requirements

    Process Responsibility

    kalimuthu(prodn)k.Thangaraj (Qc) Vinothkumar

    (Designer) Customer Manufacturing Site

    G

    C

    l

    a

    s

    s

    Potential Cause(s)/

    Failure Mechanisms

    Potential

    Failure Mode

    Cover plate 2KN M MS

    rt No

    m Name

    v #

    re Team

    Raw material

    Process/Step

    Function

    038BSN

    Potential Effects

    of Failure

    100%inspection

    & test certificate

    recived fromsuppiler end

    store

    department

    Blanking & Piecring

    Inprocess

    Inspection

    Report

    Production

    dept

    Piecring

    Inprocess

    Inspection

    Report

    Production

    dept

    Bending

    Inprocess

    Inspection

    Report

    Production

    dept

    Plating Tin plated 3-5

    Supplier

    Inspection

    ReportQuality dept

  • 7/28/2019 038BSN PAPP 25.4.2013

    9/14

    Page #

    Supplier Name:Reason for Data Submission (check all that apply): Supplier Representative: Supplie

    Part Name: Initial submission New/revised item, material or product component Name Title

    Part Number Correction of Non-conformance New Supplier

    Drawing Number: New/Revised drawing or other specification New or significantly modified process or routing Phone Number Email: OK

    Revision Level: Change to optional construction or material Change of location, sub-supplier or material OKNI

    Revision Date: Tooling: Transfer, replacement, refurbishment Other - please specify Date: 01.04.20 NG

    or additional tool.

    1 2 3 4 5 6 7 8 9 10 Supplie

    1 NThickness Vernier 2.00 1.90 2.10 1.98 1.99 2.01 1.98 1.99 2.01 1.98 1.99 1.98 1.99

    1.99 0.03OK

    2 NWidth Vernier 58.00 57.80 58.20 58.01 58.02 58.04 58.04 58.01 58.04 58.04 58.01 58.01 58.02

    58.02 0.030OK

    3 NLength Vernier 58.00 57.80 58.20 58.03 58.01 58.06 58.02 58.03 58.06 58.02 58.03 58.03 58.01

    58.03 0.05OK

    4 N4 Hole Dia Pin Gauge 6.0 5.90 6.10 6.02 6 5.98 5.98 5.96 5.98 5.98 5.96 6.02 6

    5.99 0.06OK

    5 N2 pcs Hole Dia Pin Gauge 5.3 5.20 5.30 5.32 5.32 5.32 5.32 5.32 5.32 5.32 5.32 5.32 5.32

    5.32 0.00OK

    7 NHole Dia Pin Gauge 3.8 3.75 3.85 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82

    3.82 0.00OK

    8 NHole pitch Vernier 43.80 43.60 44.00 43.74 43.7 43.75 43.8 43.78 43.75 43.8 43.78 43.74 43.7

    43.75 0.10OK

    9 YBending distance Vernier 7.00 6.60 7.40 7.05 6.98 7.05 6.98 6.98 7.05 6.98 6.98 7.05 6.98

    7.01 0.07OK

    10 YHole pitch Vernier 18.00 17.90 18.10 18 18.02 18 18.02 17.98 18 18.02 17.98 18 18.02

    18.00 0.04OK

    11 NSlot length Radius Gauge 28.00 27.80 28.20 27.99 28 28.02 28.01 28.01 28.02 28.01 28.01 27.99 28

    28.01 0.03OK

    12 YSlot width Pin Gauge 9.00 8.80 9.20 8.98 8.97 8.98 8.98 8.99 8.98 8.98 8.99 8.98 8.97

    8.98 0.02OK

    13 YSlot distance Height Gauge 13.20 13.00 13.40 13.18 13.2 13.14 13.2 13.14 13.14 13.2 13.14 13.18 13.2

    13.17 0.06OK

    15 NHole pitch Height Gauge 29.00 28.80 29.20 29 28.95 28.99 28.99 28.96 28.99 28.99 28.96 29 28.95

    28.98 0.05OK

    16 NHole pitch Height Gauge 43.80 43.60 44.00 43.7 43.9 43.8 43.85 43.75 43.8 43.85 43.75 43.7 43.9

    43.80 0.20OK

    17 NLeg width Vernier 8.00 7.8 8.2 7.96 7.99 7.98 7.96 7.98 7.98 7.96 7.98 7.96 7.99

    7.97 0.03OK

    18 NRadius Radius Gauge R3 3 3 3 3 3 3 3 3 3 3

    3.00 0.00OK

    21 NHole pitch Height Gauge 14.0 13.85 14.15 13.88 14.0 13.9 14.0 14.0 13.9 14.0 14.0 13.88 14.0

    13.93 0.09OK

    24 NHole pitch Height Gauge 6.4 6.2 6.6 6.42 6.45 6.45 6.42 6.41 6.45 6.45 6.42 6.45 6.42

    6.43 0.04OK

    25Radius Radius Gauge R8 8 8 8 8 8 8 8 8 8 8

    8.00 0.00OK

    26Bending Height Vernier 10.0 9.8 10.2 10.01 10.02 10.01 10.02 10.01 10.03 10.01 10.01 10.02 10.01

    10.02 0.02OK

    27Angle b.projector 90.0 89 91 90 89.3 90 89.45 90 90 89.45 90 90 89.3

    89.75 0.70OK

    30Tin Plated Plating Thickness gauge 3 5 4.1 3.8 4 3.8 4.2 4.6 4 4.2 4.1 4.2

    4.10 0.80OK

    NOTE: Any out of specification data will require corrective action.

    Date of Measu

    Cover plate 2SK M MS 31

    DIMENSIONAL DATA SHEET

    038BSN

    038BSN

    G

    7/18/2011

    ITEM#

    Required

    Cpk(Y/N)

    DataType:

    V=Variable

    A=Attribute

    REQUIREMENT:

    Description of CheckMeasurement Method

    REQUIREMENT:

    Target

    Jud

    Average Range

    ACE Electrical Equipments India Pvt Ltd

    K.Thangaraj Quality incharge

    9524735080 [email protected]

    Supplier Code: 609318

    Bonus

    Applied

    (Y/N)

    Min Max

    Data for Sample Number..

    mailto:[email protected]:[email protected]
  • 7/28/2019 038BSN PAPP 25.4.2013

    10/14

    Date

    Facility

    MachineStation

    Note: This document must be completed for all Cooper owned tool

    Tool Owner : M/s Cooper Bussman

    Tool Drawing No : APRT242,APRT244,APRT247

    Tool No : APRT242 DWG,APRT244DWG,,APRT247DWG

    History Card No : ATHCNO 242,ATHCNO244,ATHCNO247

    Schedule for Maintance : Every 10000 Stocks

    TOOL NO : APRT244

    TOOL NO: APRT247

    Tooling Information FormCooper Tooling reference

    number.

    (if applicable)

    Supplier Name PPAP Submission Level Affected Feature Number(s) Part Description

    ACE ELECTRICAL EQUIPMENTS 3

    PPAP Due Date Part Number Tool Location

    039BSN

    TOOL NO:APRT242 DWG

    New Tooling Modified Tooling Required for PPAP

    Date of Tooling Change Part NameCover plate 2BK M MS

  • 7/28/2019 038BSN PAPP 25.4.2013

    11/14

    CUSTOMER NAME : Cooper Bussman ACE ELECTRICAL EQUIPMENTS(I) PVT LTD-HOSUR

    Comp Name : Cover Plate Tool No : APRT243

    Comp Part No : TOOL HISTORY CARD Operation : Blanking & PiercingFrequency :

    DateProductio

    n Qty

    Cumulativ

    e

    Productio

    n Qty

    Press

    Shop

    Superviso

    r

    Tool

    Maker

    Sign/Date

    1 110 110 kalimuthu Chandru

    2 110 220 kalimuthu Chandru

    3 110 330 kalimuthu Chandru

    CUSTOMER NAME : Cooper Bussman ACE ELECTRICAL EQUIPMENTS(I) PVT LTD-HOSUR

    Comp Name : Cover plate Tool No : APRT252

    Comp Part No :TOOL HISTORY CARD

    Operation

    PIERCING TOOL

    Frequency :

    DateProductio

    n Qty

    Cumulativ

    e

    Productio

    n Qty

    Press

    Shop

    Superviso

    r

    Tool

    Maker

    Sign/Date

    1 110 110 kalimuthu Chandru

    2 110 220 kalimuthu Chandru

    Nature of Defect Action Taken Remark

    Nil Nil 039C

    Nil Nil 038C

    Nil Nil 038D

    Slot Size 28.0& 2

    HOLES PIERCING

    TOOL

    Nature of Defect Action Taken Remark

    Nil Nil 038C

    Nil Nil 038D

  • 7/28/2019 038BSN PAPP 25.4.2013

    12/14

    CUSTOMER NAME : Cooper Bussman ACE ELECTRICAL EQUIPMENTS(I) PVT LTD-HOSURComp Name : Cover plate Tool No : APRT247

    Comp Part No : TOOL HISTORY CARD Operation V Bending ToolFrequency :

    DateProductio

    n Qty

    Cumulativ

    e

    Productio

    n Qty

    Press

    Shop

    Superviso

    r

    Tool

    Maker

    Sign/Date

    1 110 110 kalimuthu Chandru

    2 110 220 kalimuthu Chandru

    3 110 330 kalimuthu Chandru

    Remark

    Nil Nil 039C

    Nature of Defect Action Taken

    038C

    038DNil Nil

    Nil Nil

  • 7/28/2019 038BSN PAPP 25.4.2013

    13/14

  • 7/28/2019 038BSN PAPP 25.4.2013

    14/14

    USL 6.6

    LSL 6.2

    Subgroup Test Value Range LSL= 6.2 Cp=

    1 6.450 USL= 6.6 CpkL=

    2 6.420 0.03 Mean= 6.4460 CpkU=

    3 6.420 0.00 StDev 0.037270227 Cpk=

    4 6.420 0.00 UCLX= 6.557828571 %Cr=

    5 6.450 0.03 LCLX= 6.334171429 Max=

    6 6.500 0.05 UCLR= 0.137347347 Min=

    7 6.410 0.09

    8 6.500 0.09 Spec Frequency

    9 6.480 0.02 1 6.2000 0

    10 6.410 0.07 2 6.2571 0

    11 6.450 0.04 3 6.3143 0

    12 6.420 0.03 4 6.3714 0

    13 6.420 0.00 5 6.4286 25

    14 6.420 0.00 6 6.4857 15

    15 6.450 0.03 7 6.5429 10

    16 6.500 0.05 8 6.6000 0

    17 6.410 0.09

    18 6.500 0.09

    19 6.480 0.02

    20 6.410 0.07

    21 6.450 0.04

    22 6.420 0.03

    23 6.420 0.00

    24 6.420 0.00

    25 6.450 0.03

    26 6.500 0.05

    27 6.410 0.09

    28 6.500 0.0929 6.480 0.02

    30 6.410 0.07

    31 6.450 0.04

    32 6.420 0.03

    33 6.420 0.00

    34 6.420 0.00

    35 6.450 0.03

    36 6.500 0.05

    37 6.410 0.09

    38 6.500 0.09

    39 6.480 0.02

    40 6.410 0.07

    41 6.450 0.04

    42 6.420 0.03

    43 6.420 0.00

    44 6.420 0.00

    45 6.450 0.03

    46 6.500 0.05

    47 6.410 0.09

    48 6.500 0.09

    49 6.480 0.02

    50 6.410 0.07

    Average 6.4460 0.04

    Part Number: Cover plate 2KN M MS Supplier Name: Date

    6.4100

    PCA Summary

    1.788737864

    2.200147573

    1.377328155

    1.377328155

    Process Data Potential Capability

    56%

    6.5000

    Rev. Date: 18/07/2011

    Part Feature: PCA Address:

    Drawing Location:

    VINOTHKUMAR - 9442527494

    20.04.2013Drawing Number:Drawing Rev.:

    038BSN Supplier Address:G Supplier Contact

    PCA Supplier Name:

    Feature Symbol: PCA Contact

    Other Information

    Cpk for Moving RangeUse when: (a) new part, (b) part with revised specifications, (c) part in which the materials, processes, manufacturing location, or production equipment have significantly

    changed, or (d) part in which the material suppliers have changed AND testing is too expensive to be conducted by subgroups.

    ACE Electrical Equipments India Pvt Ltd

    106/2A-1 BEHIND ESI HOSPITAL,OUTER RING ROAD HOSUR

    ACE ENGINEERING

    106/2A-1 BEHIND ESI HOSPITAL,OUTER RING ROAD HOSUR

    GR&R Contact

    6

    6

    6

    6

    6

    6

    7

    7

    7

    1 5 9 13 17 21 25 29 33 37 41 45 49

    TestValue

    Sample Number

    Averages

    X X-Bar Upper Control Limit Lower Control Limit

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1 5 9 13 17 21 25 29 33 37 41 45 49

    Range

    Sample

    Range Chart

    Range UCL Range Average Moving Range Average

    6.2000

    6.2571

    6.3143

    6.3714

    6.4286

    6.4857

    6.5429

    6.6000

    Frequency

    Test Values

    Distribution