7/30/2019 CO Marseille Cluster E V1-0 http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 1/52  Cluster Optimisation Report Marseille Cluster E  – v1.0 1 DOCUMENT DESCRIPTION SHEET Project ORF URMed UMTS Optimisation Document Type Cluster optimisation report Document File Name CO_Marseille_cluster_E_V1-0 Document Title Cluster Optimisation report Marseille Cluster E Date Created 19/05/04 Version Number  1.0 Date Last Modified 04/06/04 Author  Luis Rodriguez Approved by: Pierre Cordonnier Confidentiality ORF Project Confidential

Transcript of CO Marseille Cluster E V1-0

Page 1: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 1/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

1

DOCUMENT DESCRIPTION SHEET

Project  ORF URMed UMTS Optimisation

Document Type Cluster optimisation report

Document File Name CO_Marseille_cluster_E_V1-0

Document Title Cluster Optimisation report Marseille Cluster E

Date Created  19/05/04

Version Number   1.0

Date Last Modified  04/06/04

Author   Luis Rodriguez

Approved by:  Pierre Cordonnier 

Confidentiality  ORF Project Confidential

Page 2: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 2/52

 

CLUSTER OPTIMIZATION REPORT

Reference

MARSEILLE CLUSTER E

Start Date:19/4/2004

End Date: 14/5/2004

Reported Date:19/5/2004

Luis RODRIGUEZ Approved by Pierre CORDONNIER 

Page 3: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 3/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

3

INTRODUCTION

1. GENERAL DESCRIPTION

2. EQUIPMENT, TOOLS AND LOGS

3. INITIAL STATUS

4. OPTIMIZATION ACTIONS

5. CS VOICE RESULTS

6. CSD RESULTS

7. SUMMARY

Page 4: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 4/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

4

Light Cluster description

Type of cluster : Urban

This cluster started with some sites down and the Sites Shake Down

not ready, the Preliminary works (Neighbour list Check, Parameters

Check) were not done by WFI Engineering group. The reason to start

the cluster under theses condition was due to the Schedule.

Sites/Sectors:

15 Sites/36 Sectors available for the First Pass.

18 Sites/42 Sectors available for Second Pass.

18 Sites/42 Sectors available for Third Pass.

21 Sites/51 Sectors planned.

Sites Indoor were not taken in to the count : Palais des Congress on

air, and 2 VLA

GENERAL DESCRIPTION

Page 5: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 5/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

5

GENERAL DESCRIPTION

Name of LA sites:

Vaufreges

Endoume

Les Goudes

Number, Name of sites in VLA, PA:

Bonneveine VLA

Marzargues VLA

Prado PA

Stade Velodrome Nord (Indoor)

Stade Velodrome Sud (Indoor)

Page 6: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 6/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

6

GENERAL DESCRIPTION

Global map with Sites

Page 7: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 7/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

7

GENERAL DESCRIPTION

DT Routes

Page 8: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 8/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

8

Tools version

Binning use (Couei): 1 second

Reference log files used for analysis

CS VOICE log files and Drive Test date

EQUIPMENT & TOOLS & LOGS

Tool  Version 

Mobile  Qualcomm  WZ4.3.201PAT 

Mobile Trace  XCAL  1.38 

Scanner    ANRITSU  ML8729B 

Post-Processing  XCAP  1.14 

Planning 

Parcell 

V8 

Page 9: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 9/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

9

Reference log files used for analysis CSD log files and Drive Test date

NORTEL UTRAN load week 10

EQUIPMENT & TOOLS & LOGS

Page 10: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 10/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

10

• The Finger Dominant infoshows the bestFinger from the UE.

• It does not take intoaccount multipathand soft HO gain

• The best Finger Ec/Io gives an ideaof the areas withlack of dominance(low Ec/Io values)or coverageproblems.

• The red circles

show the areaswith low Ec/Iovalues that shouldbe optimized

CLUSTER INITIAL STATUS

MAPS FROM THE FIRST DT

UE Ec/Io Finger Dominant (Unloaded CS Long Call)

Site Down

Areas to Optim.

Weak Cov. Area.

Page 11: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 11/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

11

• Many Drops werecounted due to theroute was extendedto the hilly areaoutside the cluster E (Red Circledarea).

CLUSTER INITIAL STATUS

MAPS FROM THE FIRST DT

Call Events (Unloaded CS Long Call)

Drop due to missing

site

Drop due to Poor Coverage

Drop due to Lack

Of dominance

Page 12: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 12/52

Page 13: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 13/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

13

OPTIMIZATION ACTIONS

NEIGHBORS AND PARAMETERS OPTIMIZATION

Parameters changes : Return to default settings

CR Name  Pass 

Neigh

Added 

Neigh

Deleted 

Parameter 

Changed 

PCR_ClusterE_290404_1stPass_01.xls  1st  26  6 

PCR_ClusterE_290404_1stPass_02.xls  1st  30  2 

PCR_ClusterE_290404_1stPass_03.xls  1st  26  6 

PCR_ClusterE_290404_1stPass_04.xls  1st  26  6 

PCR_ClusterE_290404_1stPass_05.xls  1st  3  2 

PCR_ClusterE_290404_1stPass_06.xls  1st  32 

PCR_ClusterE_290404_1stPass_07.xls  1st  23 

PCR_ClusterE_290404_1stPass_08.xls  1st  11 

PCR_ClusterE_050504_2ndPass_01.xls  2nd  27 

PCR_ClusterE_050504_2ndPass_02.xls  2nd  6  4 

PCR_ClusterE_050504_2ndPass_03.xls  2nd  8  6 

PCR_ClusterE_180504_3rdPass_01.xls  3rd  14 

Total   All  139  32  93 

Page 14: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 14/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

14

OPTIMIZATION ACTIONS

ISSUES LOGS

First Pass 19/4/2004

Cross feeder Le Goudes, Ticket Number 33 of 30/4/2004

SITENAME 

 ALAR

M  DESCRIPTION  OPT TEAM COMMENTS  Ticket 

Ticket

No. 

LA PLAGE  1M  CEM / 6 CCM-CEM link 

Site Down. Impact on the Drive

test  NO 

LES GOUDES  2M  TMA Malfunction  Cross Feeder or Swapped PSC  YES  33 

MARSEILLE

VEYRE  1M 

Site temporary down, only before

10:30  No Impact  NO 

ROI D'ESPAGNE  1C  loss of supervision  No Impact  NO 

MICHELET  1w  power distribution problem  No Impact  NO 

Page 15: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 15/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

15

OPTIMIZATION ACTIONS

ISSUES LOGS

Second Pass 3/5/2004 and 4/5/2004

Third Pass 10/5/2004 and 12/5/2004

SITENAME   ALARM  DESCRIPTION  OPT TEAM COMMENTS  Ticket 

Ticket

No. 

LES GOUDES  2M  TMA Malfunction 

Only one Sector is installed but

FDD Config is 2 Sector   YES  33 

MICHELET  1C 

Processing Error, Configuration

File Inconsistent with the

hardware  No Impact  NO 

MICHELET  1m  power distribution problem  No Impact  NO 

SITENAME   ALARM  DESCRIPTION  OPT TEAM COMMENTS  Ticket 

Ticke

t No. 

LES GOUDES  2M  TMA Malfunction  No Impact  YES  33 

MICHELET  1C Processing Error, Configuration

File Inconsistent with the hardware  No Impact  NO 

MICHELET  1m  power distribution problem  No Impact  NO 

ROI D'ESPAGNE  1C  loss of supervision 

Site did not transmit when CS long

Call was done.  NO 

Page 16: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 16/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

16

OPTIMIZATION ACTIONS

OPTIMIZATION DRIVE TEST Total duration of DT in Cluster Optimization: 31h 5m 54s

Total duration of DT in Cluster Optimization: 5 Days

Page 17: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 17/52

Page 18: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 18/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

18

CS VOICE LONG CALL

MAPS

UE Finger Dominant RSCP (Loaded)

Roi D’espagne 

problems

Circled in black,

areas with poor coverage

Page 19: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 19/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

19

CS VOICE LONG CALL

UE Finger Dominant Ec/Io (Loaded)

Under loaded

conditions one can

see that the radio

environment is

much more

degraded

Roi D’espagne 

problems

Circled in black,areas with poor 

coverage

Page 20: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 20/52

Page 21: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 21/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

21

CS VOICE LONG CALL

Voice Call Event (Loaded)

Drops and fails

related to missinsites and poor 

coverage

Roi D’espagne 

problems

Page 22: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 22/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

22

CS VOICE LONG CALL

UE Active Set Num Cell (Loaded)

This slide shows

that Softer 

Handover 

overhead=46.4%

Page 23: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 23/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

23

CS VOICE LONG CALL

KPIs

NOTE: exclusion zone was defined with RSCP level <-98dBm instead of -94dBm as

insertion loss from attenuation box is close to 4dB. Therefore KPI’s calculated above

are more pessimistic than what they should be.

NOTE: All The blocks and errors counts in Roi D’espagne area were excluded from

the Bler Calculation 

Call Duration during Drive 4h11m44s

Total Drop Calls 34 Drop Calls Reasons

Drop Calls Network 15 1 Release Unspicified

Drop Calls Radio 18 5 Roi D'espagne Fails

Drop Calls other 1 3 Lack of Dominance (by design or site roll over)

3 Missing active set update

1 Nlist Full and Optimized (Le frioul)

2 Missing Reference Cell Update

6 Missing neighbour (OCNS Activated)

4 Over Shooting (Sites without OCNS Activated)

5 Lack of Coverage

3 Lack of Dominance

1 Xcal bug: irrelevant drop

Grey Drops are excluded from KPI calculation

Service CS Voice Long Call

Drop Calls / hour  4.8

BLER (%) 2.87%

Page 24: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 24/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

24

CS VOICE LONG CALL

Drop Calls Explanation

No Result Reason Start Time End Time Comments

1 Drop Missing Neighbour 38:00.0 57:15.5 SC241<->SC125 and SC159<->SC125(Rabata

2 Fail 57:27.0 57:37.0

3 Fail 57:48.5 57:58.5

4 Drop Lack of Dominance 58:10.0 03:52.6 Hilly area, Overshooting from far away s ites

5 Drop Lack of Dominance 04:04.1 04:19.9 Hilly area, Overshooting from far away s ites

6 Fail 04:31.4 04:41.4

7 Fail 04:52.9 05:02.9

8 Drop Lack of Coverage 05:14.4 06:08.8 RSCP from Qualcomm very low, No Scanner  

9 Drop Missing Neighbour 06:20.3 09:06.8 SC117<->56 (Caused by Load Condit ion). Fixe

10 Fail 09:18.3 09:28.3

11 Fail 09:39.8 09:49.8

12 Drop Missing Neighbour 10:01.3 10:24.2 SC28<->39 (Caused by Load Condition).Fixed.

13 Drop Missing Neighbour 10:35.7 10:49.5 SC28<->39 (Caused by Load Condition).Fixed.

14 Fail 11:01.0 11:11.0

15 Drop Missing Neighbour 11:22.5 12:32.0 SC173<->39 (Caused by Load Condit ion).Fixe

16 Fail 12:43.5 12:53.5

17 Drop Active set update 13:05.1 15:29.318 Drop Active set update 15:40.8 19:37.3

19 Drop Lack of Dominance 19:48.8 28:34.1 Missing site: PRADO

20 Drop Lack of Dominance 28:45.6 29:43.4 Missing site: PRADO

Page 25: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 25/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

25

CS VOICE LONG CALL

Drop Calls Explanation

No Result Reason Start Time End Time Comments

21 Fail 29:54.9 30:04.9

22 Fail 30:16.4 30:26.4

23 Drop Release Unspicified 30:37.9 30:45.2

24 Fail 30:56.7 31:06.7

25

Result

Unknown 31:18.2

26

Result

Unknown 12:31.4

27 Drop Lack of Coverage 44:23.4 46:32.3 RSCP from Qualcomm very low, No Scanner  

28 Fail 46:43.8 46:53.8

29 Fail 47:05.3 47:15.3

30 Fail 47:26.8 47:36.8

31 Fail 47:48.3 47:58.3

32 Drop Lack of Coverage 48:09.8 48:14.9 RSCP from Qualcomm very low, No Scanner  

33 Drop Lack of Coverage 48:26.4 49:22.0 RSCP from Qualcomm very low, No Scanner  

34 Fail 49:33.5 49:43.5

35 Fail 49:55.0 50:05.0

36 Drop Lack of Coverage 50:16.5 50:45.1 RSCP from Qualcomm very low, No Scanner  37 Drop Lack of Dominance 50:56.6 52:02.1 Overshoot ing from far away sites, Garibaldi

38 Drop Missing Neighbour 52:13.6 54:09.1 SC316<->SC249 (caused by load condit ion).Fixed.

39 Drop Overshooting 54:20.7 54:57.2 Overshooting SC215 and SC249

40 Fail 55:08.7 55:18.7

Page 26: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 26/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

26

CS VOICE LONG CALL

Drop Calls Explanation

No Result Reason Start Time End Time Comments

41 Fail 55:30.3 55:40.3

42 Drop Overshooting 55:51.8 56:07.3 Overshooting SC249

43 Drop Overshooting 56:18.8 58:00.2 Overshooting SC249

44 Drop Reference Cell 58:11.7 00:36.1

45 Drop Lack of Dominance 00:47.6 32:21.5 Missing site: PRADO

46 Drop Nlist Full 32:33.0 33:23.1 Nlist Full:Le Froiul SC323

47 Drop Active set Update 33:34.6 46:39.5

48ResultUnknown 46:51.0

49 Drop Roi D'espagne 21:51.5 Loss of supervision

50 Fail 22:03.0 22:13.0

51 Fail 22:24.5 22:34.5

52 Fail 22:46.0 22:56.0

53 Fail 23:07.5 23:17.5

54 Fail 23:29.0 23:39.0

55 Fail 23:50.5 24:00.5

56 Fail 24:12.0 24:22.057 Drop Roi D'espagne 24:33.5 25:27.7 site fail

58 Fail 25:39.2 25:49.2

59 Fail 26:00.7 26:10.7

60 Fail 26:22.2 26:32.2

Page 27: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 27/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

27

CS VOICE LONG CALL

Drop Calls Explanation

No Result Reason Start Time End Time Comments

61 Fail 26:43.7 26:53.7

62 Fail 27:05.2 27:15.2

63 Fail 27:26.7 27:36.7

64 Drop Roi D'espagne 27:48.2 41:14.3 Loss of supervision

65 Fail 41:25.8 41:35.8

66 Drop Roi D'espagne 41:47.3 42:21.0 Loss of supervision

67 Drop Roi D'espagne 42:32.5 42:37.0 Loss of supervision

68 Fail 42:48.5 42:58.5

69 Drop Reference Cell 58:35.2

70 Fail 58:46.7 58:56.7

71 Drop Overshooting 59:08.2 59:15.7 Overshooting SC242

72 Fail 59:27.3 59:37.3

73 Drop Xcall 59:48.8 05:20.7

74

Result

Unknown 05:32.2

Page 28: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 28/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

28

CSD LONG CALL

NETWORK STATUS DURING DRIVE-TEST 

The drive test was not affected by any issue.

 All Sites was working under normal conditions (exclude VLA and PA)

DT Duration: 5h 59m 38s

Page 29: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 29/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

29

CSD LONG CALL

MAPS

UE Finger Dominant RSCP (Loaded)

Circled in black,

areas with poor 

coverage

Page 30: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 30/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

30

CSD LONG CALL

Scanner Top 1 RSCP (Loaded)

Page 31: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 31/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

31

CSD LONG CALL

Map with -98 dBm threshold for scanner Top1 measurement (Loaded)

Page 32: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 32/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

32

CSD LONG CALL

Map with -81 dBm threshold for scanner Top1 measurement (Loaded)

Page 33: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 33/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

33

CSD LONG CALL

UE Finger Dominant Ec/Io (Loaded)

Areas with

coverage

problems

Under loaded

conditions one ca

see that the radioenvironment is

much more

degraded

Page 34: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 34/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

34

CSD LONG CALL

Scanner Top 1 Ec/Io (Loaded)

The scanner 

shows almost the

same behavior asthe mobile, even if 

scanner shows

better Ec/Io levels

(Mobile is slightly

more pessimistic).

Page 35: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 35/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

35

CSD LONG CALL

UE TX Power (Loaded)

Areas with

problems

Excluding the

black circled areas,

UE have goodCoverage in all

cluster for CSD

calls

Bad coverage

area for CSD

Calls, it will be

fixed with

Mazargues

Page 36: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 36/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

36

CSD LONG CALL

Voice Call Event (Loaded)

Drops related to

missing sites or 

poor coverage

Page 37: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 37/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

37

CSD LONG CALL

UE Active Set Num Cell (Loaded)

This slide shows

that Softer 

Handover 

overhead=45.7%

Page 38: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 38/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

38

CSD LONG CALL

KPIs

Call Duration during Drive 4h40m46s

Total Drop Calls 27 Drop Calls Reasons

Drop Calls Network 9 2 Excluded by RSCP <-98dBm

Drop Calls Radio 15 5 Realease Unspecified

Drop Calls other 3 1 Lack of Dominance (by design or site roll ove)

1 Missing active set update

4 Missing neighbour (OCNS Activated)

6 Over Shooting (Sites without OCNS Activated)

4 Poor Coverage1 Lack of Dominance

3 Xcal bug: irrelevant drop

Grey Drops are excluded from KPI calculation

Service CSD Long Call

Drop Calls / hour  4.5

BLER (%) 0.57%

NOTE: exclusion zone was defined with RSCP level <-98dBm instead of -94dBm as

insertion loss from attenuation box is close to 4dB. Therefore KPI’s calculated above

are more pessimistic than what they should be.

Page 39: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 39/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

39

CSD LONG CALL

Drop Calls Explanation

No Result Reason

Start

Time

End

Time Comments

1

Result

Unknown 14:55.1

2 Call Drop RSCP<-98dBm 52:16.4 03:17.3

3 Call Drop Missing Neighbour 03:29.0 11:47.6

sc28<->sc39 (Caused by Load Condition).

Fixed

4 Call Drop Missing Neighbour 11:59.2 12:53.6

sc117<->sc39 (Caused by Load

Condition). Fixed

5 Call Drop Poor Coverage 13:05.2 15:37.9 Can't be excluded by TOP1 RSCP

6 Call Drop Lack of Dominance 15:49.5 16:14.6 by Design

7 Call Drop Lack of Dominance 16:26.3 16:39.4 Overshoot ing from sites far away

8 Call Drop Overshooting 16:51.1 17:12.8 SC229

9 Call Fail 17:24.5 18:24.5

10 Call Drop Active set update 18:36.1 23:42.4

11 Call Drop XCAL 23:54.1 27:05.4

12 Call Drop Realease Unspecified 27:17.0 27:21.0 SC316

13 Call Drop Realease Unspecified 27:32.7 27:36.6 SC316

14 Call Drop XCAL 27:48.3 28:12.0

15 Call Drop Realease Unspecified 28:23.6 28:27.5 SC316

16 Call Drop Realease Unspecified 28:39.1 28:43.2 SC316

17 Call Drop Realease Unspecified 28:54.9 28:58.7 SC316

18 Call Fail 29:10.4 30:10.4

19 Call Drop Overshooting 30:22.0 41:07.7 SC229

20 Call Drop Overshooting 41:19.3 41:26.4 SC229

Page 40: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 40/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

40

CSD LONG CALL

Drop Calls Explanation

No Result Reason

Start

Time End Time Comments

21

Result

Unknown 41:38.1

22 Call Drop RSCP<-98dBm 09:47.7 14:39.9

23 Call Fail 14:51.5 15:51.5

24 Call Drop overshooting 16:03.2 16:35.9 SC249 Garibaldi

25 Call Drop overshooting 16:47.6 19:32.3 SC249 Garibaldi

26 Call Drop overshooting 19:44.0 21:49.7 SC249 Garibaldi

27 Call Drop XCAL 22:01.4 22:25.6

28 Cal l Drop Missing Neighbour 22:37.2 38:23.9 sc63<->sc215 (Caused by Load Condition). Fixed.

29 Call Drop Poor Coverage 38:35.5 39:44.9 can't be excluded by TOP1 RSCP but mobile is <-98dBm

30 Call Drop Poor Coverage 39:56.5 40:52.9 can't be excluded by TOP1 RSCP but mobile is <-98dBm

31 Call Drop Poor Coverage 41:04.6 41:18.0 can't be excluded by TOP1 RSCP but mobile is <-98dBm

32 Call Drop Missing Neighbour 41:29.7 44:36.1 sc63<->sc215 (Caused by Load Condition). Fixed

33ResultUnknown 44:47.7

34

Result

Unknown 04:16.2

Page 41: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 41/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

41

CLUSTER OPTIMIZATION SUMMARY 

KPI SUMMARY

BLER % Ncoup BLER % Ncoup BLER % Ncoup BLER % Ncoup

First Pass 3,39% 10,07

Second Pass 2,46% 5,90

Third Pass 2,87% 4.8 0,57% 4.5

Service

CS Long CSD Long Call

Unloaded Loaded Unloaded Loaded

Page 42: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 42/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

42

CLUSTER OPTIMIZATION SUMMARY 

OUTSTANDING ACTIONS AND COMMENTS TO IMPROVE PERFORMANCE

RESULTS

Action Comment

New Sites

integration

Since we have 3 Macro sites as VLA, the Cluster still needs aditional sites

to improve overall coverage and Site dominance. As an example: Marseille

Grande Bastille, Marseille David and Le Cabot.

Nlist Optimization

working on the Neighbour list Optimization is a necessity since it is a trade

off between Overshooting and Coverage reduction

Overshooting

St Loup UMTS (Cluster H), Garibaldi (Cluster D), and Marseille ST Julien

(Cluster B) were overshooting in areas with missing sites or poor coverage.

Re design

Is recommended a special study for the following sites: Le Frioul (Is

overshooting everywhere) and Marseille La Cadenelle (the Configuration

should be changed from 2 sectors with 65 degrees beamwith antennas to

 just one sector of 90 degrees Beamwith antenna.

Page 43: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 43/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

43

CLUSTER OPTIMIZATION SUMMARY 

STATS

UE Dominant Ec/Io Distribution CS long (First Pass)

90% of the values aregreater than -11dB

Page 44: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 44/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

44

CLUSTER OPTIMIZATION SUMMARY 

STATS

UE Dominant Ec/Io Distribution CS long (Second Pass)

90% of the values aregreater than -11dB for 

pass 2

Page 45: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 45/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

45

CLUSTER OPTIMIZATION SUMMARY 

STATS

UE Dominant Ec/Io Distribution CS long(Third Pass)

74% of the values aregreater than -11dB

once network is 60%

loaded

Page 46: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 46/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

46

CLUSTER OPTIMIZATION SUMMARY 

STATS

UE Dominant Ec/Io Distribution CSD long (Final)

75% of the values aregreater than -11dB

once network is 60%

loaded

Page 47: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 47/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

47

CLUSTER OPTIMIZATION SUMMARY  STATS

UE ActiveSet Size Distribution CS Voice long (Final)

This slide shows

that Softer 

Handover overhead=46.4%

Page 48: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 48/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

48

CLUSTER OPTIMIZATION SUMMARY  STATS

UE ActiveSet Size Distribution CSD long (Final)

This slide shows thatSofter Handover 

overhead=45.7%

Page 49: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 49/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

49

CLUSTER OPTIMIZATION SUMMARY  STATS

UE BLER Distribution CS voice long (Final)

Page 50: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 50/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

50

CLUSTER OPTIMIZATION SUMMARY  STATS

UE BLER Distribution CSD long (Final)

Page 51: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 51/52

 Cluster Optimisation Report Marseille Cluster E  – v1.0

51

E Début optim : S10 (19/05/04)

Etat avantoptim

CLUSTER

APRESoptim 1ère

passe

APRESoptim 2e

passe

APRESoptim 3e

passe

APRESoptim 4e

passe

APRESoptim 5e

passe

Surface du cluster (km²) 91.5

Nombre initial de sites

22 dont 1

micro

Nombre de sites et secteurs pris

en compte

21 macro /

51 sect

18 macro /

42 sect

18 macro /

42 sect

Nbre de sites / secteurs modifiés

par rapport à l'état précédent

6 sites /8

secteurs

Nbre total de sites / secteurs

modifiés par rapport à l'état initial  

6 sites /8

secteurs

TCOUV UL >= 85 % 70.07% 70.01%

TCOUV Canal pilote >= 85 % 34.62% 34.58%

zone de macro-diversité utile [10-20]% 12.61% 10.74%

Pollution pilote < 3% 0.56% 0.44%

Indicateur TARP >= 85 % 65.80% 66.01%

Caractéristiques

de

l'environnement

Critères

d'évaluation

CLUSTER OPTIMIZATION SUMMARY 

PARCELL RESULTS TABLE

Page 52: CO Marseille Cluster E V1-0

7/30/2019 CO Marseille Cluster E V1-0

http://slidepdf.com/reader/full/co-marseille-cluster-e-v1-0 52/52

52

TCOUV UL

70.01%

TCOUV PILOTE

34.58%

MACRODIVUTILE

10.74%

POLLUTIONPILOTE

0.44%

TARP

66.01% 

CLUSTER E

TCOUV UL

70.07%

TCOUV PILOTE

34.62%

MACRODIV

UTILE

12.61%

POLLUTION

PILOTE

0.56%

TARP

65.80%

   O   P   T   I   M

    3  r   d 

   P   A   S   S

CLUSTER OPTIMIZATION SUMMARY 

PARCELL MAPS BEFORE AND AFTER OPTIMIZATION