KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64...

16
KJ Baudry, Inc. (c) K.J. Baudry, Inc. www.BaudryPartners.com [email protected] 4045092231

Transcript of KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64...

Page 1: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 2: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 3: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

64 Perimeter Center WestAtlanta, Georgia

Situation:

The subject property is a Class A,325,000sf office building located in a prominent office park and includes a 45,00sf “purpose built” enterprise data center.

The Landlord operates multiple class A office buildings in the area but has little experience operating and managing data center properties and no experience with wholesale colocation.

The Landlord has previously subdivided and leased about half of the premises to multiple tenants. The existing data center leases are “office leases” , denoted in square feet and do not include sufficient definition of power and cooling allowances and usage.

The Landlord would like to lease the remaining data center premises but doesn’t have a clear understanding or accounting of generator, cooling and UPS capacities.

Solution

Review the utility infrastructure and determine the maximum system capacities, the amount encumbered by leases, and the amount actually used by the tenants.

Quantify the gap between available utility capacities and square footage and develop a high level concept to eliminate or reduce the gap, based on physical constraints.

Develop an overall “product definition and pricing concept” that is consistent with current wholesale colocation concepts and pricing.

Conduct a workshop with the Landlord to understand the business opportunity, proposed product definition and pricing strategy.

Identify key players needed to create a full development team.

Develop a “take-to market” strategy.

Take it to market.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 4: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

55 Marietta StreetAtlanta, Georgia

Situation:

The subject property is a 400,000sf office building located in an area that is out-of-favor. The property is outdated and functionally obsolete. It has limited appeal as office space .

The property is 60% vacant and the ownership is struggling to lease up the vacant space.

The property is located across from a major telco hotel and regional IP exchange (Telx).

Solution

Develop an overall concept for repositioning the property as a multi-tenant, dedicated technology center.

Prepare a high level redevelopment program including design concept and specification, pro-forma budgets and schedule.

Conduct a workshop with the Landlord to understand the business opportunity

Identify key players needed to create a full development team

Develop a “take-to market” strategy.

Take it to market.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 5: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

Dawsonville ParkAtlanta Metro Area

Situation:

The subject property is 100 acres of raw land. The Developer intends to create a “Mixed Use Industrial Project” of 22 Pad Sites.

The current plan is to develop retail pads along the road frontage, industrial pads in middle, and make rear pads available for industrial or other use.

There is a 115kV Transmission Line that crosses the property.

There is a publicly funded infrastructure project to deliver dark fiber along the road frontage.

Property is located near an older development with over 20 Fortune 100 data centers.

Solution:

Develop an overall concept for the rear pads as data center sites.

Prepare a high level program including design concept and specification, pro-forma budgets and schedule

Develop a “take-to market” strategy.

Take it to market.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 6: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

1600 Union Hill RoadAtlanta, Georgia

Situation:

The subject property is a 30,000sf building located in office park with a significant number of data centers.

The site is large enough and already graded to add another 30,000sf.

There is significant fiber carriers in area.

Power capacity is immediately available from the power company.

The owner wants to sell the property at or above a market price..

Solution:

Survey and prepare a Feasibility Report

Develop test fits, budgets and schedules for conversion of the property to data center use (i.e. do the prospects homework for them).

Document utilities and fiber routes in area.

Develop marketing program.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 7: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

HigherOneAtlanta, Georgia

Situation:

Growing Company with need for 1) software development office in Atlanta, 2) rack space to support the Atlanta development office and 3) DR facilities to support people and IT systems.

Limited Budget; Client looking to acquire leased space with existing data center,

Limited Schedule; Atlanta data center space required to facilitate a planned corporate headquarters move (office and data center),

CRE and Real Estate Broker have identified four possible facilities.

Process stalled, schedule slowly creeping away, as there are no resources committed to performing due diligence on each opportunity, developing budgets and schedules and making recommendations.

Approach:

Survey each facility to assess compliance with requirements,

Assess condition of existing MEP &FP systems and feasibility of upgrading to meet requirements,

Develop a high level design, upgrade cost, and utility cost for each prospective site.

Compare site on the basis of best fit (ability to meet requirements, ability to meet schedule, lowest total occupancy cost over the lease term and flexibility and potential to meet unknown future requirements).

Option #1 Option #2Option #3

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 8: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

Ahold InternationalGreenville, South Carolina

• Situation

– Ahold occupies 215.000sf corporate campus which includes a modern, up to date data center.

– There is an opportunity to create substation business savings by moving from the existing corporate campus to less expensing lease space.

– Taking advantage of this opportunity requires that the data center be moved and Ahold has identified several options;

– Colocation

– Outsourcing

– Upgrade an existing, underutilized data center facility that was acquired thru an acquisition.

• Approach & Solution

– Develop requirements for each option.

– Price colocation and outsourcing options.

– Survey and identify work required to upgrade existing owned data center (create hi-level design , develop budget and schedule, and operating costs).

– Compare options on a 1) Compliance with Requirements and 2) Total Cost of Ownership basis.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 9: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

J.M. FamilyAlpharetta, Georgia

Situation:

Primary Data Center located on corporate campus in South Florida.

Significant exposure to Hurricanes.

Data Scan Subsidiary located in Atlanta Metro Georgia.

Parent recently purchased an 86,000sf building in the Alpharetta, Georgia to house 1) a new production data center for parent, 2) a disaster recovery facility for parent and 3) offices and data center for Data Scan subsidiary.

Challenge:

Lack of agreement between major stakeholders (Real Estate, Facilities and IT),

Limited Schedule & Budget

Management Approach:

Conduct workshop with all stakeholders to create a common vision among the stakeholders,

Adopt fast track delivery methods.

Bid overhead and general conditions, on open book basis, to a qualified General Contractor.

Commence demolition during design phase.

Order long lead delivery items during the design phase.

Design to a projected ten year requirement - build to a five year requirement.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 10: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

IncommAtlanta, Georgia

Situation

Growing Company with high-availability customer SLA’s .

4,500 sf data center, fifteen years old, part of the corporate headquarters lease.

“N” Redundancy Level.

Strong desire by client to remain in location. The significant number of carriers in building and

location adjacent to a regional IP exchange provides significant bandwidth costs savings, and

Significant cost to migrate to a new location

Solution:

Expand data center to 8,000 sf.

Incorporate risk mitigation efforts into the planning and design processes.

Implement a phased upgrade approach to power upgrades.

Add a “B” path 500kVA UPS

Provide “B” path circuits to every rack

Migrate branch circuit connections from 2xA to A/B

Provide in-rack ATS for IT equipment with single power supplies

Replace “A” path UPS systems with a new 500kVA UPS

Provide two new 500kVA systems in A/B configuration for capacity,

Provide second generator for redundancy.

Provide a cooling system overlay to double cooling capacity

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 11: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

AgilentColorado Springs, Colorado

Situation

Existing data center suffers from poor layout, low ceiling height, short congested floor plenum, inadequate air flow and is generally outdated,

MEP systems are old and experiencing failures

Project to “replace and upgrade in place” has been budgeted and funded but can not be implemented as planned due to the amount of down time required.

Approach & Solution

Develop a minimum of three feasible implementation strategies

Restack and relocate to create clear area then upgrade as each block of space is cleared

Create swing space, restack and relocate to swing space then upgrade as each block of space are cleared

Vacate adjacent office space, create new data center, fully commission, move and demolish existing data center.

Identify planned outages/risks and develop a risk mitigation program, budgets and schedule,

Conduct workshop with management and recommend best approach based on compliance with project requirements, minimization of impact to IT operations, building and budget constraints.

Work with A&E team to design and implement project.

Existing Floor Plan

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 12: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

Confidential ClientUS & South American Operations

Situation:

International company providing (insourcing) IT operations and call center services,

Multiple Data centers and call centers located around the world,

Customer contracts carry Service Level Agreements (SLAs) agreements that differ depending on the type of operation and customer requirements,

Potential mismatch exists between implementation and SLA requirements,

Challenges:

Survey limited to one day per facility,

No single benchmark for comparison,

Solution:

Survey electrical and mechanical systems for single points of failure,

Survey rack arrangement and air conditioning layout for air flow management,

Survey electrical down to each rack, verifying that every item of IT equipment 1) has dual power supplies and is plugged into separate sources, 2) is equipped with an in-rack ATS where equipped with a single power supply,

Document conditions and recommend improvements to meet SLAs.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 13: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

Caddo Parish School SystemShreveport, Louisiana

Situation:

Caddo Parish School System is one of the largest school systems in Louisiana. Their Data center supports both mainframe operations and client/server systems , printers , tape libraries and staff on the raised floor. It is outdated and can’t support additional hardware.

School board funded IT equipment, applications and data center upgrades thru a single line item (i.e. no breakdown or allocation of budget).

General disagreement and lack of leadership concerning direction of computing platforms, where and how to spend the allocated dollars.

Solution:

Explore both a main frame solution and a server solution, defining initial requirements and requirements projected out three, five and ten years.

Layout the data center to accommodate both solutions, space permitting. Overlap futrue space requirements as its not likely that both computing solutions will continue forward and if they do, then growth will be less for both systems.

Move printers and manual tape libraries, along with the operators, into a separate area.

Design to accommodate the 10 year projection, Provision for the three to five year projection.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 14: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

MirantAtlanta, Georgia

Situation:

Plenty of space, not enough power and cooling capacity (17,000sf of rack space)

UPS and cooling capacity of 42w/sf.

Challenge:

Data center is operational. Any upgrades must be done within a live production facility.

Cooling system can not hold temperature on hot days.

Planed IT projects on hold. IT equipment in storage pending availability of power and cooling.

Solution:

Free up UPS capacity and install additional cooling using fast track methods for an interim fix (60 day deliverable).

Provide an additional 500kVA of 2N UPS capacity and an additional 200 Tons of cooling capacity (180 day deliverable – overlapping the interim fix).

Designssystems in a manner that eliminates scheduled downtime,

Implement a risk mitigation program to reduce risk of unplanned downtime during construction, including daily meetings with contractors, review of procedures, etc.

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 15: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

Digital/Compaq - Consulting/Project Management

Cairo, Egypt.

Assisted DEC with their bid response to ARENTO RFP for telecommunications sector support project (USAID Grant). Work included developing preliminary design and budget for a network operations center.

Motorola - Program Management

Beijing China

Managed the interface between The Peoples Republic of China and Motorola, leading to the successful implementation of an Iridium Satellite Communications Gateway.

Motorola - Project Management

International (12 Countries)

Managed the recovery, repair and redeployment of defective satellite communications equipment for twelve Iridium Gateways

Concert - Project Management

International

Managed the split of a international frame relay network into four separate domains.

Managed the deployment of a remote access telecommunications test system across multiple international sites.

Provided ongoing, day to day, preventative maintenance, adds, moves and changes. Work included several data center expansions, chilled water plant upgrades and UPS replacements.

Norfolk Southern – Advisory Services

Atlanta, Georgia

Developed data center requirements and evaluation of real estate alternatives for a new 15,000 square foot data center

Additional Projects

(c) K.J. Baudry, Inc. ‐ www.BaudryPartners.com  ‐ [email protected] ‐ 404‐509‐2231 

Page 16: KJ Baudry, Inc.baudrypartners.com/content-kjbi/kjbiqualifications.pdf · KJ Baudry, Inc. 64 Perimeter Center West Atlanta, Georgia Situation: The subject property is a Class A,325,000sf

KJ Baudry, Inc.

AFLAC – Consulting

Columbus, Georgia

Evaluated AFACs corporate data center operations and developed management processes and a five/ten year upgrade strategy.

ITC^Deltacom – Real Estate Disposition

Suwanee, Georgia

Developed the marketing program and successfully marketed for lease 80,000 square feet of data center collocation space.

E*Trade - Real Estate Disposition

Alpharetta, Georgia

Developed the marketing program and successfully marketed for lease an existing 32,000 square foot data center.

Bell South - Real Estate Disposition

Tucker, Georgia

Developed marketing program and successfully marketed for sale an existing 20,000 square foot data center.

GE Capital – Project Management

Burbank, California

Managed the conversion and renovation of an existing 125,000 square foot office building and data center into a call center.

Monster Worldwide - Real Estate Acquisition

Continental US

Conducted nation wide site search, leading to the identification of an existing 15,000 square foot data center for acquisition. Work included search, due diligence and evaluation, high level planning, preliminary design, and budgeting.