    Manual for theconstruction of

    ALP System ducts

    la conduzione dell'aria

    UNI EN ISO 9002

    CERT.N9091 ALP0

    ISO 9002

  • 8/12/2019 Manuale Alp Gbr

    2/52

    Introduction

    Practical Manual

    Dear collaborator,

    this manual has been conceived and developed as a basic practical guide for ALP Technicians.

    It is intended to fulfil two main requirements:

    in the first place it shall be an easy practical handbook for those who approach the ALP system

    for the first time and in the second place it shall be a practical manual for technical / operational

    advice for those who actively work with our System.

    We have tried to achieve the best result and to offer an overview - as detailed as possible -

    about construction and assembly features of ALP products.

    We would be pleased if you could give us tips or any kind of material useful for future editions.

    Our sincere thanks to those who have contributed to the creation of this practical manual.

    Technical - Commercial Department

    CONSTRUCTION SYSTEM - 3

  • 8/12/2019 Manuale Alp Gbr

    3/52

  • 8/12/2019 Manuale Alp Gbr

    4/52

    Table of contents

    EQUIPMENT PAG. 6

    THE CONSTRUCTION OF DUCTS 7

    1 - STRAIGHT DUCT 8

    2 - STRAIGHT DUCT - TRANSITION 15

    3 - STRAIGHT DUCT - OFFSET 16

    4 - STANDARD BRANCH 17

    5 - SYMMETRIC ELBOW 18

    6 - ASYMMETRIC ELBOW 23

    7 - TWO-WAY WYE JUNCTION 24

    8 - THREE-WAY WYE JUNCTION 25

    9 - PROFILES 26

    10 - ACCESSORIES 40

    CONSTRUCTION SYSTEM - 5

  • 8/12/2019 Manuale Alp Gbr

    5/52

    HOW TO ORGANIZE THE WORKSHOP

    Here below you will find a list of basic tools, materials and accessories necessary for the

    construction of ALP System ducts.

    Equipment

    - Work table 4000 x 1200 mm Art. 601

    - Multiblock rule 4000 mm Art. 602 / A

    - Multiblock rule 1200 mm Art. 602 / B

    - Square 1200 mm Art. 603 / A

    - Square 700 mm Art. 603 / B

    - Rule 1200 mm Art. 604

    - Compass - Large Art. 605

    - Tool-kit case Art. 607

    - Manual bending machine Art. 608

    - Pneumatic pistol for silicone Art. 609

    - Pneumatic glue spreader Art. 610

    The equipment set may be completed by adding other tools described by the ALP General Catalogue.

    Consumption materials and accessories

    - Aluminium tape Art. 201

    - Special glue Art. 202

    - Silicone Art. 203

    - Adhesive gasket Art. 204

    - Corners in nylon-glass Art. 205

    - Corner plates Art. 206/ A

    - Corner covers Art. 206/ B

    Profiles

    Equipment

    6 - CONSTRUCTION SYSTEM

    art. 301 art. 302 art. 303 art. 304 art. 305 art. 306 art. 307

    art. 308 art. 309 art. 310 art. 311 art. 312 art. 313

  • 8/12/2019 Manuale Alp Gbr

    6/52

    The construction

    of ducts

    For the construction of ALP System ducts keep in mind as follows:

    the measurements of ducts shall always be understood as internal measurements;

    the marking of ducts shall always be based on internal measurements;

    the procedure to be followed for construction is given here below:

    marking - cutting

    gluing

    assemblysilicone application

    aluminium tape application

    profiles application

    CONSTRUCTION SYSTEM - 7

  • 8/12/2019 Manuale Alp Gbr

    7/52

    1 - Straight duct

    STRAIGHT DUCT WITH A 4 M CUTTING SYSTEM

    Use the Double 45 jack-plane (art. 701/ A) and the Multiblock rule (art. 602/ A) for the

    construction of straight ducts.

    8 - CONSTRUCTION SYSTEM

    40 2040 4020

    1200

    art. 602/ A

    art. 701/ A

    4 m duct

    The sum total of 4 sides of the duct is equal or below 1040 mm.

    When the sum total of the sides the duct is composed of is either equal or below 1040 mm, it

    will be possible to build a max. 4 m long duct by making use of a single panel.

  • 8/12/2019 Manuale Alp Gbr

    8/52

  • 8/12/2019 Manuale Alp Gbr

    9/52

    10 - CONSTRUCTION SYSTEM

    b

    h

    b

    40

    40

    h + 90

    56

    4

    20

    b 90

    b + 90

    20 20 50

    20

    FOLLOWING CUTS

    Internal section h

  • 8/12/2019 Manuale Alp Gbr

    10/52

    CONSTRUCTION SYSTEM - 11

    GLUING

    Before spreading the glue, eliminate any dust

    residue which might hinder a perfect gluing.

    The glue shall be spread in a uniform way on

    both surfaces by completely covering the

    foam.

    ASSEMBLY

    When the glue is dry, close the duct. Follow

    the general rules given here below:

    when joining panels, always start from thesame border so as to trim only the duct side

    opposite the starting side;

    always take the internal side of the duct as a

    reference so as to perfectly join corners

    check the perpendicularity of sides.

    Assembly is completed by pressing the corners

    by means of a stiff spatula (art. 704).

    1

    2

    43

    5

  • 8/12/2019 Manuale Alp Gbr

    11/52

    12 - CONSTRUCTION SYSTEM

    SILICONE APPLICATION

    A thin coat of silicone shall be applied in all

    internal corners of the duct for its hermetic

    seal. Prevent the air from coming into contact

    with the insulating foam.

    N.B.

    To make profile application easier, when

    spreading silicone keep it at a distance of

    ab out 4 0 / 5 0 m m from the end of the duct.

    After having applied profiles, apply silicone

    in the remaining parts.

    4050mm

    4050mm

    2 m long pneumatic pistol for silicone (art. 609)

  • 8/12/2019 Manuale Alp Gbr

    12/52

    CONSTRUCTION SYSTEM - 13

    TAPE APPLICATION

    Taping shall perform two functions:

    a technical function since it restores the

    vapour barrier and avoids the formation of

    condensate in the foam;

    an aesthetical function since it hides cut and

    pressed parts from view.

    To apply the aluminium tape in a straight way,

    use the tape marker to mark along the edges

    of the duct (art. 706).

    Press by making use of a soft spatula (art. 705)

    to avoid the formation of any air bubble which

    might cause the tape to come off.

    N.B.

    The tape sha ll be a pplied on clea n surfaces.

    N ever touch the adhesive side of the tape.

    1

    2

    3

  • 8/12/2019 Manuale Alp Gbr

    13/52

  • 8/12/2019 Manuale Alp Gbr

    14/52

    CONSTRUCTION SYSTEM - 15

    20 2040 202040

    2

    3

    1

    Pieghe

    Pieghe

    2 - Straight duct

    Transition

    Bends

    Bends

  • 8/12/2019 Manuale Alp Gbr

    15/52

    16 - CONSTRUCTION SYSTEM

    1 4 3

    2 3

    Mouth 1

    20

    Mouth 2

    8

    8

    7

    5

    6

    7

    Mouth 2Offset

    Mouth 1 Offset

    Offsets are ducts intended to connect two

    ducts placed on different axes.

    Carry out the operations described by the

    figure:

    To mark and cut lateral sides, follow the

    procedure adopted for transitions. Assemble

    and complete as usual.

    3 - Straight duct

    Offset

  • 8/12/2019 Manuale Alp Gbr

    16/52

    1 2 3

    150

    X+150

    150

    50

    X

    600

    HOW TO J OIN BRANCH PROFILES

    CONSTRUCTION SYSTEM - 17

    Standard branches are ducts directly connected

    to the main duct intended to deviate the air flow

    without making use of two-way wye junctions.

    To make assembly easy, their length shall never

    exceed 600 mm. To avoid the formation of

    turbulences as well as the danger of high flow

    resistances, these branches shall have a partinclined at an angle of 45 and intended to let

    the air in more easily. Its dimensions remain

    constant (150 mm) even if the ducts dimensions

    change.

    For the construction, act as follows:

    mark 3 sides (1 - 2 - 3) of the branch at the

    same time;

    cut the panel and leave sharp corners alongoffset;

    make cuts on the cover by means of the

    Double 22.5 jack-plane (art. 701/ B) so as

    to bend the cover at an angle of 45.

    art. 313 art. 304/ B art. 303 art. 206/ A

    art. 701/ B

    4 - Standard branch

    Double 22.5 jack-plane

    art. 206/ B

    art. 204/ B

  • 8/12/2019 Manuale Alp Gbr

    17/52

    18 - CONSTRUCTION SYSTEM

    Symmetric elbows have an entry section which is just the same

    as the exit section.

    To build elbows, use single-blade jack-planes (art. 702/ A -

    702/ B - 702/ C), the compass (art. 707), the squares (art. 603/ A

    - 603/ B) and the manual bending machine (art. 608).

    From a building point of view, elbows are made of sides and

    covers.

    Cover

    Side

    5 - Symmetric

    elbow

    art. 702/ A

    art. 702/ C

    art. 707

    art. 603/ A

    art. 603/ B

    art. 702/ B

    N.B.

    It is impor tant to build elbow s prope rly so a s to avoidthe formation of turbolences and high flow resistance.

    art. 608

  • 8/12/2019 Manuale Alp Gbr

    18/52

    CONSTRUCTION SYSTEM - 19

    5

    20

    4

    2

    1

    1.2

    00

    3

    h

    6

    hb

    hb

    h

    20

    Minimo 100 m

    5 = Internal radius

    6 = External radius

    NOTE:

    If possible, alw a ys use the overall w idth of

    the pa nel for the construction of e lbow s.

    Alwa ys leave a min. 10 0 mm neck betw een

    the end of the rad ius a nd the entry / exit of

    the elbow .

    Internal Radius

    h

    600 mm

    r

    150 mm

    250 mm300 mm

    MARKING

    Carry out the operations described by the figure:

    Minimum

    1 0 0 m m

  • 8/12/2019 Manuale Alp Gbr

    19/52

    20 - CONSTRUCTION SYSTEM

    CUTTING

    The single-blade jack-plane, free-hand used, shall always be pulled.

    The two vertical lines on the front side of the jack-plane indicate the ends of the cut.

    Art.702/A

    Art.702/C

    Art.702/Bart. 702/ A art. 702/ B

    art. 702/ C

    X

    X

    X

    It is recommended to mark both the sides and the covers for a

    perfect connection during assembly.

  • 8/12/2019 Manuale Alp Gbr

    20/52

    CONSTRUCTION SYSTEM - 21

    THE BENDING OF COVERS

    X

    X

    X

    Side curvature

    radius

    300 mm

    20 mm

    35 mm

    50 mm

    35 mm

    50 mm

    70 mm

    Distan ce betw een bend s

    Int. cover Ex t. cover

    External cover Internal cover

    art. 608

    GLUING AND ASSEMBLY

    External cover assembly Internal cover assembly

  • 8/12/2019 Manuale Alp Gbr

    21/52

    22 - CONSTRUCTION SYSTEM

    ELBOW FINISHING

    After having assembled the elbow, finish the duct. Carry out the same operations described for

    the straight duct.

    NOTE:

    The a luminium tap e sha ll be a pplied on clea n surfaces. N ever touch the adhesive side of the tape.

    Pressing M a rk ing

    Ta pe a pplica tion Silicone a pplica tion

  • 8/12/2019 Manuale Alp Gbr

    22/52

    CONSTRUCTION SYSTEM - 23

    20

    4

    2

    1

    5

    h1

    1.2

    00

    3

    7

    6

    h1

    h

    h1

    h

    b

    h b

    20

    6 - Asymmetric

    elbow

    Internal Radius

    h

    600 mm

    r

    150 mm

    250 mm300 mm

    Asymmetric elbows have an entry section

    which is different in size from the exit section.

    MARKING

    Carry out the operations described by the figure:

    How to position the centre to mark the external

    radius:

    Calculate the width of the external radius

    (Ir + h1) (6)

    Start from the larger section (h) to mark the

    external radius (7).

    For the following operations see the previousparagraph: "SYMMETRIC ELBOW".

  • 8/12/2019 Manuale Alp Gbr

    23/52

    Re

    1 2

    3

    40

    Ri

    4040

    1 2 5 4 3

    12

    13

    14

    15Min.

    150m

    m

    1.2

    00

    6 8 9 7 10 11

    16

    24 - CONSTRUCTION SYSTEM

    After having spread the glue, assemble every single element in the following order. It is

    important to cut the base of the damper at an angle of 45 so that the air goes in two different

    directions. Put some aluminium tape to prevent the foam from coming into contact with the air.

    1 - Transition cover/ damper

    2 - External radius cover

    3 - Internal radius cover

    7 - Two-way

    wye junctionTransition

    Asymmetric

    elbowTwo-way wye junctions convey the air in two

    different directions of the plant.

    It is recommended to mark the three sides of the

    duct all together so as to make assembly easier.

    Carry out the operations described by the

    figure:

  • 8/12/2019 Manuale Alp Gbr

    24/52

    CONSTRUCTION SYSTEM - 25

    Min.

    150mm

    111 122

    6

    9 2 10

    8

    5

    7

    16

    15

    14

    13

    344040

    1200

    4

    2

    3

    5

    1

    23

    4

    8 - Three-way

    wye junction

    Three-way wye junctions convey the air in

    three different directions of the plant.

    Carry out the operations described by the

    figure:

    After having properly marked, cut

    and prepare all lateral covers. It is

    no use marking the upper cover of

    the duct; just follow the internal

    borders of the lower cover you have

    already cut to copy it.

    After gluing, assemble the duct in

    the above mentioned order.

    Complete as usual.

    1 - Lower cover

    2 - Transition cover/ damper

    3 - External radius cover

    4 - Internal radius cover

    5 - Upper cover

    Asymmetric elbows

  • 8/12/2019 Manuale Alp Gbr

    25/52

    4

    1

    2

    3

    6

    67

    5

    26 - CONSTRUCTION SYSTEM

    9 - Profiles

    PROFILES APPLICATION

    Apply the corners on the duct to make it stiffer

    and stronger.

    How to glue the profile

    How to glue the part the profile

    will be applied to

    How to assemble the profile by exerting a

    slight pressure through the special hammer

    art. 205

  • 8/12/2019 Manuale Alp Gbr

    26/52

    CONSTRUCTION SYSTEM - 27

    art. 303

    art. 206/ A

    1

    2

    3

    4

    5

    6

    6

    7

    PROFILES APPLICATION

    Invisible flan ge

    How to apply the corner plates

    on the duct corners.

    How to glue the profile

    How to glue the part the profile

    will be applied to

    How the assemble the profile by exertinga slight pressure with the special hammer

  • 8/12/2019 Manuale Alp Gbr

    27/52

    28 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    Flange / slide-in channel joint

    This type of joint occurs by applying an

    adhesive gasket on one of the two flanges for

    its hermetic seal.

    art. 301-302

    art. 304

    art. 204/ A

  • 8/12/2019 Manuale Alp Gbr

    28/52

    CONSTRUCTION SYSTEM - 29

    art. 303

    art. 204/ B

    art. 304/ B

    art. 206/ B

    USE OF PROFILES

    Invisible flange joint

    This type of joint occurs by applying

    an adhesive gasket on one of the two

    flanges for its hermetic seal.

  • 8/12/2019 Manuale Alp Gbr

    29/52

    30 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    "F Profile" joint - Fire Damper

    art. 501

    art. 307

    art. 204/ A

  • 8/12/2019 Manuale Alp Gbr

    30/52

    CONSTRUCTION SYSTEM - 31

    USE OF PROFILES

    "F Profile" joint - Volume Control Damper

    art. 501

    art. 307

    art. 204/ A

  • 8/12/2019 Manuale Alp Gbr

    31/52

    32 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    "F Profile" joint - Rectang ular Silencer

    art. 501

    art. 307

    art. 204/ A

  • 8/12/2019 Manuale Alp Gbr

    32/52

  • 8/12/2019 Manuale Alp Gbr

    33/52

    34 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    "F Profile" joint - A ir Ha ndling Unit

    art. 501

    art. 307

    art. 204/ A

  • 8/12/2019 Manuale Alp Gbr

    34/52

    35 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    "Cha ir Profile" joint - A ir Ha ndling Unit

    art. 205

    art. 308

  • 8/12/2019 Manuale Alp Gbr

    35/52

    36 - CONSTRUCTION SYSTEM

    USE OF PROFILES

    Profiles for Grilles

    Two series of profiles may be used for

    this type of application: "U Profile"

    (art. 309) or "Profile for

    Grille" (art. 310).

    art. 205 art. 309

    art. 309

    art. 205 art. 310

    art. 201

  • 8/12/2019 Manuale Alp Gbr

    36/52

    CONSTRUCTION SYSTEM - 37

    art. 312

    USE OF PROFILES

    Profile for Filter

  • 8/12/2019 Manuale Alp Gbr

    37/52

    When a duct is very large, it is built by joining panels through

    "Double F Profile" (art. 306), instead of using 45 cut.

    To extend the surface, panels are flat-joined by following an

    analogous procedure. In this case the profile used is a "H Profile"

    (art. 305).

    N.B.

    Before cutting profiles, ta ke thelength of the du ct minus 8 0 mm so

    as to be able to apply profiles at

    both ends.

    38 - CONSTRUCTION SYSTEM

    1200

    X

    40

    art. 306

    art. 205art. 301

    art. 305

    USE OF PROFILES

    Construction of a duct by making use of a "Double F Profile"

    and a "H Profi le"

    art. 306

    art. 305

  • 8/12/2019 Manuale Alp Gbr

    38/52

    CONSTRUCTION SYSTEM - 39

    USE OF PROFILES

    Profile for Screen

    NOTE:

    It is recomm ended to use a 2 0 0 / 8 0 m icron panels

    for the construction of gooseneck to be installedoutdoor.

    Cut profiles at an angle of 45.

    art. 311

  • 8/12/2019 Manuale Alp Gbr

    39/52

    40 - CONSTRUCTION SYSTEM

    STIFFENING SYSTEM FOR DUCTS

    Bars shall be cut 4 mm less than the internal

    section of the duct.

    10 - Accessories

    art. 514

    art. 508

    art. 507

    art. 506

  • 8/12/2019 Manuale Alp Gbr

    40/52

    800

    1200

    800

    1200

    4000

    800

    2400

    800

    4000

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    1

    1

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    PA

    0-150

    PA

    310-450

    PA

    460-600

    PA

    610-750

    PA

    960-1000

    PA

    1010-1250

    PA

    1260-1500

    PA

    1760-2000

    PA

    760-950

    PA

    160-300

    PA

    1510-1750

    CONSTRUCTION SYSTEM - 41

    DUCT

    SIDEmm

    PRESSURE

    0 - 400

    410 - 500

    510 - 600

    610 - 700

    710 - 800

    810 - 900

    910 - 1000

    1010 - 1100

    1110 - 1200

    1210 - 1300

    1310 - 1400

    1410 - 1500

    1510 - 1600

    1610 - 1700

    1710 - 1800

    1810 - 1900

    1910 - 2000

    Table for the calculation of stiffening

    Lo ng Pi tch 8 0 0 - 2 4 0 0 - 8 0 0

    Sh o r t Pi tch 8 0 0 - 1 2 0 0 - 1 2 0 0 - 8 0 0

    M e th o d A:

    Method B:

    M e th o d A e x a m p le:Section Pressure

    1000 x 1000 400 PA

    Method B example:Section Pressure

    1300 x 550 1000 PA

  • 8/12/2019 Manuale Alp Gbr

    41/52

    42 - CONSTRUCTION SYSTEM

    art. 510

    art. 509

    L

    Glue the turning vanes on the sides

    Assemble the turning vanes

    Mark the outline of the vane-plate on the

    side of the elbowTURNING VANES

    Legend for Turning vanes

    L m m

    Up to 300

    300 500

    500 1000

    Over 1000

    N o.of vanes

    0

    1

    2

    3

    W IDTH O F ANY AIR FLOW AS A

    FRACTION OF "L"

    (from the inside to the outside)

    L

    1/ 3-2/ 3

    1/ 6-1/ 3-1/ 2

    1/ 12-1/ 6-1/ 4-1/ 2

  • 8/12/2019 Manuale Alp Gbr

    42/52

    50mm

    A

    B

    A

    B

    A+B+A+B+70mm 50 mm

    B

    B

    A

    A

    A-5

    mm

    B-5

    mm

    CONSTRUCTION SYSTEM - 43

    FLEXIBLE DUCT CONNECTOR - QUICK CLUTCH SYSTEM

    art. 505/ B

    art. 505/ Cart. 505/ A

    art. 309art. 205

    1

    2

    34

    5 6

  • 8/12/2019 Manuale Alp Gbr

    43/52

    44 - CONSTRUCTION SYSTEM

    ROUND TUBE FOR DIFFUSER AND FLEXIBLE DUCT

    art. 405

    art. 504

    art. 606

    art. 406

    art. 407

  • 8/12/2019 Manuale Alp Gbr

    44/52

    CONSTRUCTION SYSTEM - 45

    PLATE FOR TEMPERATURE CHECK

    PLATE FOR HUMIDISTAT

    art. 511

    art. 511

  • 8/12/2019 Manuale Alp Gbr

    45/52

    46 - CONSTRUCTION SYSTEM

    INSPECTION DOOR

    art. 308

    art. 512

    art. 309

  • 8/12/2019 Manuale Alp Gbr

    46/52

    CONSTRUCTION SYSTEM - 47

    HANGER SYSTEMS

    MAX 4000

    MAX 4000

    MAX 4000

    Traditional, by means of threaded bars and channels

    By means of self-adhesive duct support

    By means of duct support

    art. 504

    art. 503

  • 8/12/2019 Manuale Alp Gbr

    47/52

  • 8/12/2019 Manuale Alp Gbr

    48/52

    CONSTRUCTION SYSTEM - 49

    ANCHORAGE SYSTEMS FOR OUTDOOR DUCTS

    Anchorage

    to steel beam

    art. 503

    Direct anchorage

    to concrete basement

    art. 503

  • 8/12/2019 Manuale Alp Gbr

    49/52

    100 mm

    100 mm

    N O TE:

    Clean and dry before apply ing the product

    Do not dilute the product with water or other substances Cur ing time: about 48 hours

    50 - CONSTRUCTION SYSTEM

    PROTECTING LINING FOR OUTDOOR DUCTS

    art. 515

  • 8/12/2019 Manuale Alp Gbr

    50/52

    CONSTRUCTION SYSTEM - 51

    HOW TO J OIN PANELS

    If the pressure is not high or ducts are small or medium-sized you may join panel strips from

    waste. Just make cuts at an angle of 45, glue the two parts and then apply the aluminium tape

    on both ends of the panel.

    Glue

    Tape

    1

    2

  • 8/12/2019 Manuale Alp Gbr

    51/52

    52 - CONSTRUCTION SYSTEM

    HOW TO JOIN PANELS

  • 8/12/2019 Manuale Alp Gbr

    52/52