WESTHAFEN TXL HAUPTBAHNHOF Urbane Luftseilbahnen... sicher, komfortabel, barrierefrei, zuverlässig, schnell, störungsfrei, leise, platzsparend, umweltfreundlich, wirtschaftlich, integraler Bestandteil ÖPNV, einzigartiges Fahrerlebnis! Daten Fahrgeschw.: 7m/s 25km/Std. Baukosten: 82 Mio. Euro netto Betriebskosten: 3 Mio. Euro netto Transportkapazität: 5000 Personen pro Stunde pro Richtung Fahrzeuganzahl: Trasse 1 = 72 Fahrzeuge, Trasse 2 = 24 Fahrzeuge Fahrzeuggröße: 35 Personen pro Fahrzeug Anzahl der notwendigen Stützen: Trasse 1 = 4+12 Stützen, Trasse 2 = 6 Stützen Güterladekapazität: 2.800kg Luftbrücke 2.0 ... mit der Seilbahn in Tegel einfliegen! Bus E-Car E - L i m o usine Car- Sharing Sagway Pedelec E-Bik e MOBILITY HUB cooperative workshop: for developing a subsequent use of the airport Berlin Tegel as research and business park location: Berlin area: 460ha client: Senate Department for Urban Development, Tegel Proje GmbH program: strategic masterplan, guidelines, system of rules submission: 2012 design team: Niehüser, Seidel, Richter, Brehm cooperation: JBBUG Landschaſtsarchitekten, Transsolar Klimaengineering The airport Berlin Tegel is going to be closed. TXL will be developed as a high quality research, industry and business park with the profile of ‘urban technologies’. A strategic masterplan builds the foundation for a flexible - and therefore, robust - planning process. Developmental guidelines and a profound system of rules create a struural, programmatic and creative quality of strategical important subareas. Simultaneously, more flexible developmental options are being allocated for other areas. ‚Quarters’ profiles‘ emphasize exisiting potentials of subareas and strengthen the ecific identity. An integrated concept for energy and water supports the sustainable development: biomass, geothermal energy, wind energy and photovoltaics provide regionally generated energy. Gray and rain water is being colleed, refined and reused regionally. An urban aerial railway connes the site with the station and the tram. Here, the aerial railway is not only an efficient, sustainable means of tranort but also represents sustainable mobility in terms of the site’s profile. TXL RESTART. integral systems southeast view of the area alternative tranortation concept

Transcript of TXL RESTART. integral systems · 2018-01-18 · terms of the site’s profile. TXL RESTART....

Page 1: TXL RESTART. integral systems · 2018-01-18 · terms of the site’s profile. TXL RESTART. integral systems southeast view of the area alternative transportation concept. Sieben

Mit der Seilbahn in TXL einfliegen.Eine urbane Luftseilbahn verbindet TXL mit Berlin: Die Seilbahn startet vom Hauptbahnhof, erreicht nach 2km die Zwischenstation Westhafen und landet nach weiteren 4km im Zentrum von TXL. Die Seilbahn ist nicht nur ein effizientes Transportmittel, sondern auch ein Zeichen für zukunftsfähige Mobilität im Sinne des Standortprofils. Das ‚Einfliegen‘ liegt in der Geschichte des Ortes begründet.

WESTHAFEN

TXL

HAUPTBAHNHOF

Urbane Luftseilbahnen...

sicher, komfortabel, barrierefrei, zuverlässig,

schnell, störungsfrei, leise, platzsparend, umweltfreundlich,

wirtschaftlich, integraler Bestandteil ÖPNV,

einzigartiges Fahrerlebnis!

Daten

Fahrgeschw.: 7m/s 25km/Std.Baukosten: 82 Mio. Euro netto

Betriebskosten: 3 Mio. Euro nettoTransportkapazität: 5000 Personen pro Stunde

pro RichtungFahrzeuganzahl:

Trasse 1 = 72 Fahrzeuge, Trasse 2 = 24 FahrzeugeFahrzeuggröße: 35 Personen pro Fahrzeug

Anzahl der notwendigen Stützen:Trasse 1 = 4+12 Stützen, Trasse 2 = 6 Stützen

Güterladekapazität: 2.800kg

Luftbrücke 2.0

... mit der Seilbahn in Tegel einfl iegen!

Bus

E-CarE-Lim

ousine

Car- SharingSagway

PedelecE-Bike

MOBILITY HUB

cooperative workshop: for developing a subsequent use of the airport

Berlin Tegel as research and business park location: Berlin area: 460ha

client: Senate Department for Urban Development, Tegel Project GmbH

program: strategic masterplan, guidelines, system of rules submission:

2012 design team: Niehüser, Seidel, Richter, Brehm cooperation: JBBUG

Landschaftsarchitekten, Transsolar Klimaengineering

The airport Berlin Tegel is going to be closed. TXL will be

developed as a high quality research, industry and business park

with the profile of ‘urban technologies’. A strategic masterplan

builds the foundation for a flexible - and therefore, robust -

planning process. Developmental guidelines and a profound

system of rules create a structural, programmatic and creative

quality of strategical important subareas. Simultaneously, more

flexible developmental options are being allocated for other

areas. ‚Quarters’ profiles‘ emphasize exisiting potentials of

subareas and strengthen the specific identity. An integrated

concept for energy and water supports the sustainable

development: biomass, geothermal energy, wind energy and

photovoltaics provide regionally generated energy. Gray and

rain water is being collected, refined and reused regionally. An

urban aerial railway connects the site with the station and the

tram. Here, the aerial railway is not only an efficient, sustainable

means of transport but also represents sustainable mobility in

terms of the site’s profile.

TXL RESTART. integral systems

southeast view of the area

alternative transportation concept

Page 2: TXL RESTART. integral systems · 2018-01-18 · terms of the site’s profile. TXL RESTART. integral systems southeast view of the area alternative transportation concept. Sieben

Sieben Teilbereiche mit unterschiedlichem Profi l.Das Gebiet ist in sieben ‘Quartiere’ gegliedert, die sich hinsichtlich ihrer Lage und Ausrichtung, Relation zum Freiraum, Adresse und in Bezug auf Merkzeichen oder Landmarks unterscheiden. Die Ausbildung der verschiedenen Teilraumprofi le trägt zur Identitätsbildung und Orientierung im Gesamtgebiet bei.

TXL zentral

TXL Strip

TXL Ost

TXL Rough & Ready TXL Mix

Bigness Nektar Bigness Ost

Die Baufeldsegmentierung ermöglicht das fl exible Zusammenschalten von Baufeldern verschiedener Größen.

Südbereich: ab 3.000m² * (Nektar: mind. 14.000m²)

Nordbereich: ab 7.000m²

Spiralförmige Phasierung Gesamtgebiet. ‘Am Bestand’ + ‘Süd vor Nord’Nord- und Südbereich unterscheiden sich in ihrer Entwicklungsperspektive. Im ‘schnellen’ Süden startet die Entwicklung im Quartier TXL zentral (1) am Terminalgebäude. Die Bestandsgebäude des Teilbereiches Rough + Ready (2) werden schnellstmöglich nachgenutzt und aktivieren diesen Bereich in der zweiten Phase. Danach wird der Südeingang, the strip (3), und die Bereiche südöstlich des Terminalgebäudes entwickelt. Es folgen TXL Ost (4)und TXL Mix (4). Katalysatoren der Entwicklung sind die besonderen Orte (*) sowie die Double Front ‘Schaufenster’ (+). Im ‘langsamen’ Nordbereich wird zuerst der Ost- (A), dann der Westbereich (B) entwickelt.

+

+

+

+

* Urban TechRepublic

* Werkraum

* Energie-zentr.

* Sport+ Event 1

AB

24

3

Energiepflanzen

Energiezentrale

Maßnahmen- Finaler Ausbau Netz und

Energieversorgung

Gas (CH4)BiomasseAbsorptionskälte

Carbonisierung

PV

PV

PV

PV

Geothermie + Wärmepumpe

Geothermie + Wärmepumpe

Geothermie + Wärmepumpe

Geothermie + Wärmepumpe

Energiepflanzen aus der nahen Umgebung

4

A+B

Energieversorgung. Phase 4Das Energieversorgungsnetz wird fi nal ausgebaut.

Energie-pfl anzen

Energiepfl anzen aus der nahen Umgebung

Geothermie + Wärmepumpe

PV

PV

Geothermie + Wärmepumpe

Geothermie + Wärmepumpe

Geothermie + WärmepumpePV

PV

EnergiezentraleGas (CH4)BiomasseAbsorptionskälte

Carbonisierung

Maßnahmen:Finaler Ausbau Netzund Energieversorgung

text right side (englisch alles klein)

strategic masterplan

flexible site segmentation

development phases local energy supply

‚quarters’ profiles create a sense of identity