CHP Altbach, Unit 2 · 2020-03-02 · Tel. +49 2261 78950-0 CHP Altbach, Unit 2 330 MWel, 1014 t/h...
Transcript of CHP Altbach, Unit 2 · 2020-03-02 · Tel. +49 2261 78950-0 CHP Altbach, Unit 2 330 MWel, 1014 t/h...
www.steinmueller.comTel. +49 2261 78950-0
CHP Altbach, Unit 2
330 MWel, 1014 t/h
Herne 4
Ibbenbüren
Tiefstack
Mehrum
AltbachRDK7
KAZAKHSTAN
Astana
Lesotho
Pretoria
SOUTH AFRICA
Duvha
Tutuka
KrielCamden
Majuba
Achievements:
Capacity increase: 940 to 1014 t/h (+10 %)
NOx: 310 mg/m³ for original coal range
NOx: 420 mg/m³ for new widened coal range
CO : 100 mg/m³
(STP @6 % O2)
Fuel: Bituminous Coal (World Coal)
Boiler design: Tower type, Benson steamgenerator with Steinmüller all-wall fi ring system
Scope of Supply:
• Replacement of 12 LowNOx burners
• Refurbishment of pulverisers
• Modifi cation on forced draft (FD) fan
• Replacement of the FD drive motor inclu-ding the addition of a frequency converter
• Refurbishment of air preheater
• All the above considering the10 % boiler capacity increase
Literature can be provided on request
• PowerGen Europe 06 - 2013 “Combustion optimisation, effi ciency improvements and emission reduction by installation of modern LowNOX fi ring systems on existing bituminous coal and lignite coal-fi red steam generators”
Please contact us for further information.
Selected Bituminous Coal References
of Steinmüller Engineering
LowNOx Firing System for Bituminous Coal
Steinmüller Engineering GmbH IHI Group Company
Fabrikstraße 5 • D-51643 Gummersbach • Germany
Tel: +49 2261 78950-0 Fax: +49 2261 78950-199
[email protected] www.steinmueller.com
Co
nce
pt/
Layo
ut:
tsi
tro
ne
med
ien
Gm
bH
& C
o. K
G, C
olo
gne
Edition 2015