Go North Schweden und Finnland 30.11.2016, Berlin Eike Gentsch Country Manager Norway, Faroe Islands & Iceland ENERCON GmbH

Transcript of Go North Schweden und Finnland · 2017. 1. 11. · ENERCON Energy Converter AB (Stenåldersgatan...

  • Go North Schweden und Finnland

    30.11.2016, Berlin Eike Gentsch

    Country Manager Norway, Faroe Islands & Iceland

    ENERCON GmbH

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 2

    Agenda

    1 Business portrait

    2 ENERCON in Sweden

    3 Wind Farm Development and Installation in Sweden

    4 Wind Farm Operation in Cold Climate

    Economical aspects of wind farm developments

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 3

    Business portrait: Global activities of ENERCON

    In eight countries ENERCON is present with its own production facilities.

    Canada

    Brazil

    Portugal

    France

    Sweden

    Austria

    Turkey

    Germany

    Headquarter: Aurich, Germany

    Emplyoees: 15,000 world wide

    Sales offices: 32 world wide

    Service: >300 stations

    Logistics: trucks

    cranes (up to

    1,600t)

    E-ship 1

    Railway company

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 4

    Business portrait: Market share by installed capacity On- and Offshore 2015

    Also on an European level, ENERCON is among the leading manufacturers.

    source: BTM Consult 2014

    Provisional market shares

    Europe 2015

    ENERCON

    19.2%

    Provisional market shares

    World Wide 2015

    ENERCON

    5%

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 5

    Business portrait: ENERCON in the Nordics

    • ENERCONs has been active in Scandinavia since the

    early 2000s

    • Installations in Finland, Sweden, Norway and on the Faroe

    Islands are currently at:

    629 WECs

    1,097.9MW (October 2016)

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 6

    ENERCON in Sweden

    EWP – ENERCON Windtower Production (Landskrona) - Production facilities (steel towers and metal works) Moved from central Malmö to

    Landskrona in 2015. - 161 employees

    ENERCON Energy Converter AB (Stenåldersgatan 19, Malmö) - Swedish service organisation - 143 employees - ENERCON Training Center is located on Arlövsvägen 9

    ENERCON GmbH Germany Filial (Arlövsvägen 9, Malmö) - Swedish branch office (Sales, PM, Site Assesment, Shared Services) - 30 employees

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 7

    Business portrait: ENERCON Wind turbine portfolio

    7

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 8

    Wind Farm Development and Operation in the North

    Planning

    Site planning

    Planning permission process

    Grid codes

    Grid requirements

    (costs, possible income)

    Our strengths

    Expert consulting and

    Customer care

    Highly qualified employees

    Years of experience

    Operational period

    O&M in Cold Climate

    Full service

    Maintenance only

    Customized concepts

    Grid connection

    Availability warranties

    Production optimization

    Our strengths

    Logistics and installation

    Long-term partnership

    Customer-oriented service

    Wind turbine

    installation

    Project time schedule

    Wind

    Environment

    Weather

    Our strengths

    High quality

    Minimized supplier risk

    Engineering and development

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 9

    Economical aspects in wind farm development: Planning

    Wind farm siting

    • Access to site?

    • Ports, roads

    • Grid availability and grid code

    • Local/ transmission grid

    • Land leases (site and access to site)

    • Special requirements

    • Site conditions

    • Terrain complexity

    • Climatic conditions (e.g. icing)

    • Wind conditions

    • Site limitations

    • Social (e.g. noise, shadow cast, recreational areas,

    visibility ….)

    • Environmental (protected areas, breeding birds,

    reindeer …)

    • Other limitations?

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 10

    Access to site

    Wind farm siting

    • Access to site?

    • Ports, roads

    • Grid availability and grid code

    • Local/ transmission

    • Land leases (site and access to site)

    • Special requirements Source: NVE – Vindkart for Norge Kartbok 1b; 08.2009.

    www.nve.no

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 11

    Site conditions

    • Site conditions

    • Terrain complexity

    • Climatic conditions (e.g. icing)

    • Wind conditions

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 12

    Site conditions – Wind Measurement

    Middagsberget 3xE-101 3050 kW, 99m, 2012

    Skogberget 36xE-92 2350 kW, 138m, 2013-2014

    Middagsberget 3xE-101 3050 kW, 99m, 2012 Egby 5xE-70 2,0MW, 64m, 2008 5xE-82 2,0 MW, 78m, 2012

    Tubular mast

    Lattice masts

    Lidar:

    Wind Measurements

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 13

    CFD (Computational Fluid Dynamics)

    applied on complex sites (terrain, forests…)

    WAsP (Wind Atlas Analysis and Application Program)

    Linear models for lowland sites (e.g. northern Germany, Denmark)

    Site conditions – Wind Conditions

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 14

    Wind Farm Installation in Cold Climate

    Middagsberget 3xE-101 3050 kW, 99m, 2012

    To be considered:

    Impact of climate and weather

    conditons on the construction

    phase:

    • Ice, frost, snow, darkness

    (winter)…

    • Implications for the

    installation time

    • Careful planning is vital!

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 15

    Wind Farm Development and Operation in the North

    Planning

    Site planning

    Planning permission process

    Grid codes

    Grid requirements

    (costs, possible income)

    Our strengths

    Expert consulting and

    Customer care

    Highly qualified employees

    Years of experience

    Operational period

    O&M in Cold Climate

    Full service

    Maintenance only

    Customized concepts

    Grid connection

    Availability warranties

    Production optimization

    Our strengths

    Logistics and installation

    Long-term partnership

    Customer-oriented service

    Wind turbine

    installation

    Project time schedule

    Wind

    Environment

    Weather

    Our strengths

    High quality

    Minimized supplier risk

    Engineering and development

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 16

    Operational period

    sources: WindStats Report 2012 Vol. 25. No. 2,3,4 and 2013 Vol. 26 No.1

    Downtime per year (in hours)

    Cold Climate sites require

    special attention to the

    operation:

    • Machinery

    • Spare parts

    • Tools

    • Site access

    • HSE

    • …

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 17

    Operational period: Cold Climate and Icing

    Andermatt, Switzerland Antarctica

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 18

    3.8 Icing classifications from IEA with influence of EC RBHS

    *Proved by Meteotest

    IEA ice class Meteorological

    icing Instrumental icing

    Production loss

    (WEC without

    RBHS)

    Production loss

    (WEC with RBHS,

    consumption incl.) Validation

    no. % of year % of year % of AEP % of AEP Site

    5 >10 >20 >20 >4 -

    4 5-10 10-30 10-25 1,5-5 Krystofovy Hamry (CZ)*

    Dragaliden (SE)*

    Gabrielsberget (SE)

    3 3-5 6-15 3-12 0,5-3 St. Brais (CH)

    Nuttby (CA)

    2 0,5-3 1-9 0,5-5 0-1,5 Molau (DE)*

    1 0-0,5

  • © Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 19

    Summary

    • ENERCON has a long track record in Scandinavia

    • Good wind farm sites with little to medium complexity, careful planning important

    • Climatic conditions have to be considered for planning, installation and operation

    • Highly recommended to use Cold Climate packages and Rotor Blade Heating systems espeically from Mid-

    to Northern Sweden

    • With the Cold Climate Package, the technology of the turbines are adjusted to survive harsher weather.

    • ENERCON has the right technology for the Nordic sites!