Technologies Bilfinger Noell GmbH 97080 Würzburg Germany Phone + 49 931 903-6190 Fax + 49 931 903-4010 [email protected] www.noell.bilfinger.com Alfred-Nobel-Straße 20 BILFINGER NOELL GMBH NON-DESTRUCTIVE TESTING References AT-acoustic emission testing of pressure vessels, tanks and piping Pressure tests in Nuclear Power Plant Isar, Grafenrheinfeld and Neckarwestheim LT test in NPP Grafenrheinfeld VT, PT, LT - tests on the construction site - NPP Olkiluoto 3 as an accredited testing company VT, PT, UT - tests to nuclear components for projects in Germany, Finland, France, Italy and China VT, PT - Tests on components of flue gas desulfurizing plants of the power plants Boxberg and Moorburg VT, PT, RT – tests on chassis for the W7-X coils Helium-leak- test superconducting coils and -10 components up to a leakage rate of 10 mbar/s (e.g. W7-X, EDIPO, CERN) LT - tests at company Kinkele, Germany VT, PT, MT - tests at company Lurz, Germany VT, PT - tests for Vattenfall n n n n n n n n n n n

Transcript of BQ 2015 1 en - Bilfinger

Page 1: BQ 2015 1 en - Bilfinger

Technologies

Bilfinger Noell GmbH

97080 WürzburgGermanyPhone + 49 931 903-6190Fax + 49 931 [email protected]

Alfred-Nobel-Straße 20

BILFINGER NOELL GMBH

NON-DESTRUCTIVETESTING

References

AT-acoustic emission testing of pressure vessels,

tanks and piping

Pressure tests in Nuclear Power Plant Isar,

Grafenrheinfeld and Neckarwestheim

LT test in NPP Grafenrheinfeld

VT, PT, LT - tests on the construction site - NPP

Olkiluoto 3 as an accredited testing company

VT, PT, UT - tests to nuclear components for

projects in Germany, Finland, France, Italy and

China

VT, PT - Tests on components of flue gas

desulfurizing plants of the power plants Boxberg

and Moorburg

VT, PT, RT – tests on chassis for the W7-X coils

Helium-leak- test superconducting coils and -10components up to a leakage rate of 10 mbar/s

(e.g. W7-X, EDIPO, CERN)

LT - tests at company Kinkele, Germany

VT, PT, MT - tests at company Lurz, Germany

VT, PT - tests for Vattenfall

n

n

n

n

n

n

n

n

n

n

n

BQ_2015_1_en

Donnerstag, 6. August 2015 13:56:02

muellerm
Stempel
Page 2: BQ 2015 1 en - Bilfinger

Scope of Testing - Test Methods AT, VT, PT, LT, MT, UT, RT

Tests according to Industrial Safety Regulation

Development of test concepts for tasks requiring special

supervision (schedule, cost, resource planning, classification

of the pressure equipment)

Preparation of test procedures for routine inspections (RI) of

pipes and containers.

Preparation of documentation for upcoming RI (clearing

permits, coordination of the individual departments)

Routine inspection of pipes and containers;

replacement/repair when necessary

Visual examination (VT)

Direct and indirect (endoscopy) visual examination

General dimensional checks

Penetration test (PT)

UV-test

R/W-test

Dye penetrant test

Magnetic particle test (MT)

Black flux and UV-test

By hand yoke

Ultrasonic test (UT)

Ultrasonic material thickness measurement

Radiographic examination (RT-FAW)

Film evaluation according to EN ISO – standards and ASME

Code with transmitted-light mode equipment

Special test

Paschentest (checking the integrity of electrical insulation)

n

n

n

n

n

n

n

n

n

n

n

n

n

n

Acoustic emission test (AT)

Test of components from the outside (no draining and

opening of sensitive components with associated hazards)

reduction of time, costs, resources

Test performance with operating fluid (no additional static /

corrosive stress)

Leakage detection in pipes, vessels, fittings, tanks

Testing of quality during production

Monitoring quality during the production in real time on

critical components

Safety monitoring during pressure testing of sensitive com-

ponents or those with high risk potential (gas pressure tests)

n

n

n

n

n

n

Leak test (LT)

All Helium methods (for tank Ø =4,5m, H=3m )effective

Bubble test (cover at welds)

Pressure variation test

Quality and welding technology

Internal and external QM-audits based on ISO 9001

Preparation, calculation, qualification, monitoring

and documentation in the field of welding

technology

Health and Safety

Preparation and control of risk assessments and

registration of hazardous substances

Provision of safety officers and training of your

staff

Qualifications / Approvals

Certification level 2 and Level 3 according to

DIN EN 9712/EN 473 respectively to PED for

procedure VT, PT, LT, UT, MT, RT for welds, rolled

products, tubes, forged goods and monocast part

in manufacturing, industry and services

Qualified personnel for piping and pressure vessels

according to BetrSichV and TRBS Nr. 1203

Certification Level 2 according to DIN EN 9712 for

acoustic emission test